The prediction method for ground surface settlement of pipe jacking tunnels based on a spatiotemporal transfer learning network
Source abstract
Abstract
Surface settlement induced by ground disturbances during pipe-jacking tunnel construction poses a persistent risk, with progressive deformation potentially leading to surrounding structural collapse. Accurate settlement prediction provides advance risk warning and enables proactive deformation risk control through construction parameter optimization. Conventional deformation control is based on simplified analytical models, numerical simulations, and field monitoring, while the effectiveness is constrained by theoretical assumption and sparse field monitoring data. The Long Short-Term Memory-Convolutional Neural Network model with Transfer Learning (LSTM-CNN-TL) is proposed to achieve settlement prediction under data-scarce conditions. The LSTM module captures long-range temporal dependencies in settlement sequences, while the CNN extracts spatial correlations and inter-feature interactions across monitoring points. Transfer learning is implemented through historical data pretraining followed by fine-tuning on target project data, enabling cross-project domain adaptation and improved generalization with limited monitoring input. The LSTM-CNN-TL model is evaluated on a soft soil pipe-jacking project. Comparative experiments against multiple baseline models across various evaluation metrics demonstrate its consistent superiority in prediction accuracy, robustness, and adaptability under limited monitoring conditions.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Geoscience and Mining Technology · Geotechnical Engineering and Analysis · Landslides and related hazards
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Architecture and Engineering, Zhejiang Tongji Vocational College of Science and Technology 1 , Hangzhou 311200, Zhejiang,
Engineering Department, Tengda Construction Group Co., Ltd. 2 , Taizhou 318050, Zhejiang,
Funding
Natural Science Foundation of Zhejiang Province
References (44)
Show source-provided references
1. A method to estimate the jacking force for pipe jacking in sandy soils10.1016/j.tust.2019.04.002 ↗
2. A new method for predicting the friction resistance in rectangular pipe-jacking10.1016/j.tust.2021.104338 ↗
3. Research of surface settlement for a single arch long-span subway station using the pipe-roof pre-construction method10.1016/j.tust.2017.11.024 ↗
4. A new model to predict ground surface settlement induced by jacked pipes with flanges10.1016/j.tust.2020.103330 ↗
5. Field measurement on the interaction between socketed pipes during pipe-roof jacking in soft ground and corresponding surface settlement10.1016/j.tust.2022.104769 ↗
6. The influence of shallow buried double-line parallel rectangular pipe jacking construction on ground settlement deformation10.1016/j.aej.2020.11.038 ↗
7. Crack mechanism of shield tunnel under excavation of foundation pit10.1063/5.0249750 ↗
8. A method for calculating jacking force of parallel pipes considering soil arching effect and pipe-slurry-soil interaction10.1016/j.compgeo.2024.106528 ↗
9. Construction of shallow buried large-span metro stations using the small pipe roof-beam method10.1007/s11709-024-1008-z ↗
10. Frictional resistance calculation and jacking force prediction of rectangular pipe jacking10.1038/s41598-023-42189-9 ↗
11. A novel mechanics model for predicting vertical load and jacking force via rectangle pipe considering soil arching effect10.1016/j.tust.2024.105952 ↗
12. Surface subsidence pattern of construction of pipe jacking in water-rich sand layer cross passage measured and numerical simulation analysis10.1016/j.istruc.2024.105949 ↗
13. Measurement and analysis of settlement induced by rectangular pipe jacking in silt stratum10.1155/2021/8347227 ↗
14. A new method for predicting ground settlement induced by pipe jacking construction10.1155/2020/1681347 ↗
15. Prediction method of surface settlement of rectangular pipe jacking tunnel based on improved PSO-BP neural network10.1038/s41598-023-32189-0 ↗
16. Dynamic prediction of moving trajectory in pipe jacking: GRU-based deep learning framework10.1007/s11709-023-0942-5 ↗
17. Analysis of the ground surface settlement of metro tunnel by using peck formula10.4028/www.scientific.net/amr.1065-1069.414 ↗
18. Ground settlement above shield driven tunnels in clay: 5F, 2T, 17R. TUNNELS AND TUNNELLING, V7, N1, JAN–FEB, 1975, P58–6210.1016/0148-9062(75)90078-9 ↗
19. Subsurface settlement profiles above tunnels in clays10.1680/geot.1993.43.2.315 ↗
20. Analysis of undrained soil deformation due to ground loss10.1680/geot.1987.37.3.301 ↗
21. Surface settlements due to deformation of a tunnel in an elastic half plane10.1680/geot.1998.48.5.709 ↗
22. A discussion on analytical and numerical modelling of the land subsidence induced by coal seam gas extraction10.1007/s12665-018-7526-z ↗
23. Numerical modeling of ground subsidence due to mining
24. Prediction and analysis of subsidence induced by shield tunnelling in the Madrid metro extension10.1139/t02-073 ↗
25. A prediction model for the surface residual subsidence in an abandoned goaf for sustainable development of resource-exhausted cities10.1016/j.jclepro.2020.123803 ↗
26. Time-series forecasting of consolidation settlement using LSTM network10.1007/s10489-023-05219-7 ↗
27. Spatio-temporal data generation based on separated attention for ENSO prediction10.1007/s10489-024-05547-2 ↗
28. Deep learning10.1038/nature14539 ↗
29. The prediction of transmission towers’ foundation ground subsidence in the salt lake area based on multi-temporal interferometric synthetic aperture radar and deep learning10.3390/rs15194805 ↗
30. Deep learning neural network model for tunnel ground surface settlement prediction based on sensor data10.1155/2021/9488892 ↗
31. A multi-objective prediction XGBoost model for predicting ground settlement, station settlement, and pit deformation induced by ultra-deep foundation construction10.3390/buildings14092996 ↗
32. Comparison of machine learning methods for ground settlement prediction with different tunneling datasets10.1016/j.jrmge.2021.08.006 ↗
33. A multi-fidelity deep operator network (DeepONet) for fusing simulation and monitoring data: Application to real-time settlement prediction during tunnel construction10.1016/j.engappai.2024.108156 ↗
34. A deep learning-based surrogate model for probabilistic analysis of high-speed railway tunnel crown settlement in spatially variable soil considering construction process10.1016/j.engappai.2024.108752 ↗
35. Development of an LSTM-based model for predicting the long-term settlement of land reclamation and a GUI-based tool10.1007/s11440-022-01749-5 ↗
36. A simple and sustainable prediction method of liquefaction-induced settlement at Pohang using an artificial neural network10.3390/su12104001 ↗
37. ICA-ANN, ANN and multiple regression models for prediction of surface settlement caused by tunneling10.1016/j.tust.2018.04.016 ↗
38. A concrete dam deformation prediction method based on LSTM with attention mechanism10.1109/access.2020.3029562 ↗
39. Monitoring and prediction of ground surface settlement in Kunming urban area by building GWO-LSTM model based on TS-InSAR10.3390/app14146036 ↗
40. SpanConv: A new convolution via spanning kernel space for lightweight pansharpening
41. Transfer learning algorithms for bearing remaining useful life prediction: A comprehensive review from an industrial application perspective10.1016/j.ymssp.2023.110239 ↗
42. Milling force prediction model based on transfer learning and neural network10.1007/s10845-020-01595-w ↗
43. Deep transfer learning based on Bi-LSTM and attention for remaining useful life prediction of rolling bearing10.1016/j.ress.2022.108914 ↗
44. Bayesian transfer learning with active querying for intelligent cross-machine fault prognosis under limited data10.1016/j.ymssp.2022.109628 ↗