The quality of tunnel excavation using the drilling and blasting method is directly related to the construction cost of the project, and over-excavation and under-excavation have always been difficult problems to solve during the tunnel excavation process. This paper adopts numerical simulation methods and relies on the physical and mechanical performance parameters of the surrounding rock in the rock strata of the Zhongliangshan Tunnel on the Chongqing Wuhan Expressway to systematically study the differences in dynamic response between slotted holes and conventional circular hole blasting in the rock mass. The focus is on analyzing the stress distribution, crack propagation law, and simulation accuracy of different algorithms. The results showed the following: (1) The slotted hole exhibited a significant stress concentration effect at the tip of the slot, with a peak pressure increase of 20.85% compared to the circular hole. The crack propagation speed along the slotted direction was three times that along the non-slotted direction. (2) In the two-dimensional model, the residual of the ALE algorithm is only 0.074 GPa, which is better than that of the SPH algorithm (residual −1.015 GPa), but SPH has more advantages in three-dimensional dynamic crack visualization. The research results provide theoretical support for the optimization design of the drilling and blasting excavation plan for the Zhongliangshan Tunnel on the Chongqing Wuhan Expressway.
Source: crossref · Quality: baseline
Affiliations
China First Highway Engineering Co., Ltd. 1 , Beijing 100024,
Jinan Rail Transit Group Construction Investment Co. Ltd. 2 , Jinan 312099,
School of Civil Engineering, Chongqing Jiaotong University 3 , Chongqing 400074,
Chongqing Traffic Planning, Survey and Design Institute Co., Ltd. 4 , Chongqing 401121,
Institute of Future Civil Engineering Science and Technology, Chongqing Jiaotong University 5 , Chongqing 400074,
Funding
Chongqing Transportation Technology Project · China Railway Group Limited Technology Research and Development Plan Project
References (20)
Show source-provided references
1. 1905
5. The directing mechanism of V-Notchf within V-Notchjng blasting
7. Dynamic caustic experiment on fracture behaviors of flawed material induced by pre-notched blasting
8. A probe into fracturing mechanism of notching blasting
10. Study and application of smooth blasting technique in weak rock tunnel
11. Applied research on smooth blasting with different charge structure in metro running tunnel
12. Study on blasting efficacy of water coupling and explosive coupling charges
13. 2006
14. Several issues regarding the use of slotted blasting method for stone mining
15. 2018
17. Experimental study on effect of decoupling charge on concrete blasting
18. 2018
19. A calculation method of the peak pressure on borehole wall for low decoupling coefficient charge blasting
20. An investigation into the notch parameters of a notched borehole