Optimization of joint preventive maintenance strategy for two-dimensional warranty equipment
Source abstract
Abstract
The implementation of a joint preventive maintenance (JPM) strategy for complex product systems can significantly enhance maintenance effectiveness during the warranty period, alleviate the manufacturer’s warranty burden, and empower users with greater autonomy in maintenance activities. However, inadequate task allocation may lead to reduced product availability and increased financial burden on the manufacturer. This study proposes a JPM strategy for two-dimensional warranted complex product systems, with preventive maintenance being regular imperfect maintenance. Furthermore, the research examines the dynamics of the two-dimensional failure rate function under JPM strategies, leading to the development of nuanced warranty cost and availability models, and further develops a cost-effectiveness model. In pursuit of optimizing cost-effectiveness, a decision optimization model is formulated. This model encompasses decision variables such as the two-dimensional preventive maintenance intervals along with the timing and frequency of manufacturer intervention in preventive maintenance. The approach employed combines pattern search algorithms and genetic algorithms for model solutions. Finally, a JPM strategy for large engineering vehicles was developed. Comparing the JPM strategy given in this paper with several other strategies, the results show that the proposed strategy can effectively reduce warranty costs, improve availability, and ultimately improve cost-effectiveness. Through sensitivity analysis, the research provides managerial recommendations to guide the implementation of the proposed JPM strategies.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Reliability and Maintenance Optimization · Technology Assessment and Management · Life Cycle Costing Analysis
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Shijiazhuang Campus of Army Engineering, University of PLA 1 , Shijiazhuang 050003, Hebei, China
Training Base, Officers College of PAP 2 , Guanzhou 510000, Guangdong, China
Funding
National Natural Science Foundation of China
References (42)
Show source-provided references
1. Optimal maintenance of a system with multiple deteriorating components served by dedicated teams10.1109/tr.2022.3190274 ↗
2. Two-dimensional aggregate warranty demand forecasting under sales uncertainty10.1080/24725854.2016.1263769 ↗
3. Cost-based preventive maintenance of industrial robot system10.1016/j.ress.2023.109595 ↗
4. Warranty costs analysis under accelerated life test for power Ishita distribution with type-I censored data10.1108/ijqrm-08-2022-0251 ↗
5. State of the art review of quality, reliability and maintenance issues in closed-loop supply chains with remanufacturing10.1080/00207543.2016.1200152 ↗
6. Investigating reliability improvement of second-hand production equipment considering warranty and preventive maintenance strategies10.1080/00207543.2016.1277277 ↗
7. Flexible decision models for a two-dimensional warranty policy with periodic preventive maintenance10.1016/j.ress.2017.01.012 ↗
8. Two-dimensional warranty: A literature review10.1177/1748006x17742776 ↗
9. Optimal joint design of two-dimensional warranty and preventive maintenance policies for new products considering learning effects10.1016/j.cie.2022.107958 ↗
10. A preventive maintenance model for leased equipment subject to internal degradation and external shock damage10.1016/j.ress.2016.05.005 ↗
11. Optimal periodic preventive maintenance policies for systems subject to shocks10.1016/j.apm.2020.12.013 ↗
12. Preventive maintenance for heterogeneous parallel systems with two failure modes10.1016/j.ress.2021.108310 ↗
13. Dynamic predictive and preventive maintenance planning with failure risk and opportunistic grouping considerations: A case study in the automotive industry10.1016/j.jmsy.2023.06.012 ↗
14. Q-learning driven multi-population memetic algorithm for distributed three-stage assembly hybrid flow shop scheduling with flexible preventive maintenance10.1016/j.eswa.2023.120837 ↗
15. Optimal rearrangement and preventive maintenance policies for heterogeneous balanced systems with three failure modes10.1016/j.ress.2023.109429 ↗
16. Pricing and two-dimensional warranty policy of multi-products with online and offline channels using a value-at-risk approach10.1016/j.cie.2020.106674 ↗
17. Joint dynamic optimization of price and two-dimensional warranty policy10.1109/tem.2019.2905004 ↗
18. A systematic warranty-reliability-price decision model for two-dimensional warranted products with heterogeneous usage rates10.1016/j.cie.2021.107820 ↗
19. Optimization of two-dimensional warranty policy for repairable products based on age and usage, applicable to lemon law conditions10.1002/asmb.2720 ↗
20. Dynamic pricing of two-dimensional extended warranty considering the impacts of product price fluctuations and repair learning10.1016/j.ress.2021.107516 ↗
21. Optimal burn-in policy for mixed population of products under two-dimensional combination warranty10.1002/asmb.2680 ↗
22. Non-parametric estimation of bivariate reliability from incomplete two-dimensional warranty data10.1016/j.ress.2022.108385 ↗
23. Research on pricing of flexible two-dimensional extended warranty considering preventive maintenance10.1051/jnwpu/20193720393 ↗
24. Warranty parameters for extended two-dimensional warranties incorporating consumer preferences10.1016/j.ejor.2019.12.035 ↗
25. Optimal decision for repairable products sale and warranty under two-dimensional deterioration with consideration of production capacity and customers’ heterogeneity10.3390/axioms12070701 ↗
26. Joint optimization of two-dimensional preventive maintenance parameters, technology level and product price under continuous usage rate and agent warranty services10.1080/02286203.2023.2180602 ↗
27. Design and pricing of usage-driven customized two-dimensional extended warranty menus10.1080/24725854.2022.2104972 ↗
28. Two-dimensional extended warranty length design from incomplete warranty data based on a new price curve considering different maintenance policies10.1016/j.cie.2022.108323 ↗
29. A study of two-dimensional warranty policies with preventive maintenance10.1080/07408170802432967 ↗
30. A preventive maintenance policy with usage-dependent failure rate thresholds under two-dimensional warranties10.1080/24725854.2020.1825879 ↗
31. An unpunctual preventive maintenance policy under two-dimensional warranty10.1016/j.ejor.2019.09.025 ↗
32. Two-dimensional extended warranty strategy including maintenance level and purchase time: A win-win perspective10.1016/j.cie.2020.106294 ↗
33. Design of a flexible preventive maintenance strategy for two-dimensional warranted products10.1177/1748006x19868892 ↗
34. A new cost-sharing preventive maintenance program under two-dimensional warranty10.1016/j.ijpe.2022.108580 ↗
35. Analysis of field data under two-dimensional warranty10.1016/j.ress.2005.11.011 ↗
36. Analysis of reliability and warranty claims in products with age and usage scales10.1198/tech.2009.0002 ↗
37. Two-dimensional failure modeling with minimal repair10.1002/nav.10120 ↗
38. Modeling 2-dimensional warranties
39. A note on calculating cost of two-dimensional warranty policy10.1016/j.cie.2007.10.005 ↗
40. Two-dimensional base warranty design based on a new demand function considering heterogeneous usage rate10.1080/00207543.2017.1346837 ↗
41. A customized two-dimensional extended warranty with preventive maintenance10.1016/j.ejor.2016.07.034 ↗
42. Some results for repairable systems with general repair10.2307/3214319 ↗