journal article·2011-06

Learning experience for thin‐film solar modules: First Solar, Inc. case study

Martin A. Green

Publisher page

Abstract

Abstract New solar photovoltaic technologies face significant barriers to market entry. First Solar, Inc. is the first thin‐film company to succeed in meeting these challenges, with substantial information about the company's evolution available through its public listing. Learning experience in relation to prices, manufacturing costs, module efficiency and material costs are assessed over the 2003–early 2010 period. Copyright © 2010 John Wiley & Sons, Ltd.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Transition Metal Oxide Nanomaterials · Thin-Film Transistor Technologies · Chalcogenide Semiconductor Thin Films

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (18)

Show source-provided references
1. NolanJF.Development of 60cm x 120cm Thin Film CdTe PV Modules.23rd IEEE Photovoltaic Specialists Conference Louisville 10–14 May 1993;34–41.10.1109/PVSC.1993.347082 ↗
2. GelsiS.For First Solar's Michael Ahearn a year in the sun.Market Watch 6 December 2007.
3. Solar Cells Inc.: Technology Partner US DOE NREL Thin Film Partnership NREL/FS‐520‐22811 1997.
4. AbkenA HambroC MeyersP PowellR ZafarS.Manufacturing and technology development programs at First Solar.NCPV and Solar Program Review Meeting Denver Colorado NREL/CD‐520‐33586 2003;393.
5. HansenTN.The promise of utility scale solar (PV) distributed generation. Presented atPOWER‐GEN International December 2003.
6. SchulzeH.Field Experiences with CdTe Solar Power Plant.SNEC PV Power Expo Shanghai May2008.
7. First Solar Form S‐1 Registration Statement Filed 30 June 2006.
8. First Solar Annual Reports Form 10‐K Filings 2007 2008 2009.
9. National Solar Technology Roadmap: CdTe H.Ullal (facilitator) NREL/MP‐520‐41736 June 2007.
10. 10.1002/pip.89910.1002/pip.899 ↗
11. 10.1002/pip.62410.1002/pip.624 ↗
12. Leaching from CdTe module material—results from batch column and availability tests Norwegian Geotechnical Institute Report 20092155‐006‐R April 2010.
13. GeorgeMW.2008. Minerals Yearbook: Selenium and Tellurium November 2009; 65.2.
14. www.metalprices.com
15. CdTe made in Eastern Germany Photon International July2007; 13.
16. 5N Plus Q2 Conference Call 30 November2007.
17. 5N Plus Q3 Conference Call 8 April2008.
18. First Solar Corporate Overview Q2 2010. Available at:www.firstsolar.com