An automated BIM-driven framework for early-stage prediction and influencing factor analysis of construction and demolition waste from masonry infill walls
Source abstract
Abstract
The rapid growth of construction and demolition waste (CDW) presents a critical challenge to sustainable development in the construction sector, yet effective mitigation remains constrained by the absence of reliable quantification methods at the design stage, where waste prevention is most feasible. Addressing this gap, this study targets masonry infill walls, one of the major contributors to CDW and develops an automated Building Information Modeling (BIM)-driven framework for early-stage prediction of material consumption and waste generation. Through secondary development in Autodesk Revit, the proposed framework integrates three interconnected modules: data acquisition, deduction calculation, and quantity computation, enabling geometry-driven and automated estimation of material use and associated waste directly from design models. Validation using as-built data from a mixed-use complex project in Shenzhen, China, demonstrates a prediction accuracy of 98.79%, confirming the robustness and practical applicability of the approach. To further advance understanding beyond quantification, eight architectural design scenarios were constructed and analyzed using correlation analysis and ridge regression to identify key determinants of waste generation. The results reveal that the number of door and window openings exerts a dominant influence on masonry waste rates, while wall volume primarily governs total waste quantities. By enabling accurate, automated CDW estimation and revealing design-sensitive waste drivers, this study provides a scalable decision-support tool for designers and project stakeholders to implement proactive waste-reduction strategies at source. The findings contribute to advancing BIM-enabled circular construction practices and support the transition toward low-waste and sustainable built environments.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Recycled Aggregate Concrete Performance · Masonry and Concrete Structural Analysis · Hygrothermal properties of building materials
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (58)
Show source-provided references
1. A review of performance assessment methods for construction and demolition waste management10.1016/j.resconrec.2019.104407 ↗
2. An off-site snapshot methodology for estimating building construction waste composition—A case study of Hong Kong10.1016/j.eiar.2019.03.006 ↗
3. Seven-dimensional automated construction waste quantification and management framework: Integration with project and site planning10.1016/j.resconrec.2019.02.020 ↗
4. An agent based environmental impact assessment of building demolition waste management: Conventional versus green management10.1016/j.jclepro.2016.06.054 ↗
5. Critical management practices influencing on-site waste minimization in construction projects10.1016/j.wasman.2016.10.040 ↗
6. An analytical framework of quantifying carbon emission impacts of construction and demolition waste circularity and trading: A case study of the UK10.1016/j.eiar.2026.108343 ↗
7. Deciphering how digital functions enable circular economy practices in construction: A critical review of recent progress and future outlook10.1016/j.eiar.2025.107889 ↗
8. Developing circularity of construction waste for a sustainable built environment in emerging economies: New insights from China
9. In-plane behavior of various brick bonds in masonry walls10.1007/s41062-020-00306-x ↗
10. Combining life cycle assessment and Building Information Modelling to account for carbon emission of building demolition waste: A case study10.1016/j.jclepro.2017.11.087 ↗
11. Quantifying construction and demolition waste: An analytical review10.1016/j.wasman.2014.05.010 ↗
12. New quantification proposal for construction waste generation in new residential constructions10.1016/j.jclepro.2015.04.029 ↗
13. Estimating construction and demolition debris generation using a materials flow analysis approach
14. BIM-based automated construction waste estimation algorithms: The case of concrete and drywall waste streams10.1016/j.wasman.2019.03.010 ↗
15. Performance Improvement of Machine Learning Model Using Autoencoder to Predict Demolition Waste Generation Rate10.3390/su15043691 ↗
16. Development of a Prediction Model for Demolition Waste Generation Using a Random Forest Algorithm Based on Small DataSets10.3390/ijerph17196997 ↗
17. Combining BIM and Ontology to Facilitate Intelligent Green Building Evaluation10.1061/(ASCE)CP.1943-5487.0000786 ↗
18. From urban metabolism to industrial ecosystem metabolism: A study of construction in Shanghai from 2004 to 201410.1016/j.jclepro.2018.08.054 ↗
19. Integrating construction supply chains within a circular economy: An ANFIS-based waste analytics system (A-WAS)10.1016/j.jclepro.2019.04.232 ↗
20. Construction and demolition waste indicators
21. 4D-BIM to enhance construction waste reuse and recycle planning: Case studies on concrete and drywall waste streams10.1016/j.wasman.2020.07.035 ↗
22. An empirical study on waste generation rates at different stages of construction projects in China
23. A novel methodology to estimate the evolution of construction waste in construction sites10.1016/j.wasman.2010.01.008 ↗
24. Chemometric-driven quantification of construction and demolition waste using Raman spectroscopy and SWIR: Enhancing sustainability in the ceramic sector10.1016/j.resconrec.2023.107259 ↗
25. Spatiotemporal estimation of construction and demolition waste generation using novel integrated machine learning and remote sensing approaches: A study of 83 Chinese cities10.1016/j.psep.2026.108469 ↗
26. Conversational artificial intelligence in the AEC industry: A review of present status, challenges and opportunities10.1016/j.aei.2022.101869 ↗
27. Deep learning in the construction industry: A review of present status and future innovations
28. Construction waste modelling for residential construction projects in New Zealand to enhance design outcomes10.1016/j.wasman.2020.10.010 ↗
29. Generalised Linear Modelling for Construction Waste Estimation in Residential Projects: Case Study in New Zealand10.3390/su16051941 ↗
30. Development of Hybrid Model for Estimating Construction Waste for Multifamily Residential Buildings Using Artificial Neural Networks and Ant Colony Optimization10.3390/su8090870 ↗
31. Estimation of construction waste generation based on an improved on-site measurement and SVM-based prediction model: A case of commercial buildings in China10.1016/j.wasman.2021.04.012 ↗
32. Designing out waste by optimizing floor layout with locally available building materials10.1016/j.jclepro.2021.130006 ↗
33. Methodology for upstream estimation of construction waste for new building projects10.1016/j.jclepro.2019.04.183 ↗
34. BIM in construction waste management: A conceptual model based on the industry foundation classes standard10.1016/j.autcon.2024.105283 ↗
35. Major Factors Affecting Construction Waste Management in Infrastructure Projects Using Structural Equation Model10.1061/(ASCE)CO.1943-7862.0002358 ↗
36. An optimized hybrid decision support system for waste management in construction projects based on gray data: A case study in high-rise buildings
37. Deconstructing construction wastes: Exploring waste generation causes and their impact on project performances10.1371/journal.pone.0322295 ↗
38. Offsite construction: Developing a BIM-Based optimizer for assembly10.1016/j.jclepro.2019.01.113 ↗
39. Automating building sustainability assessment using building information modelling: A case study
40. Atashbar · Sustainability · 2023 · 15 · 1564710.3390/su152115647 ↗
41. Designing out construction waste using BIM technology: Stakeholders’ expectations for industry deployment10.1016/j.jclepro.2018.01.022 ↗
42. Building information modelling for small-scale residential projects
43. A BIM-based system for demolition and renovation waste estimation and planning10.1016/j.wasman.2013.01.001 ↗
44. Analysis of collaborative design and construction collaborative mechanism of cloud bim platform construction project based on green computing technology
45. BIM-enabled Kanban system in construction logistics for real-time demand reporting and pull replenishment10.1108/ECAM-01-2022-0036 ↗
46. Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea10.1016/j.wasman.2015.12.026 ↗
47. Design optimisation using convex programming: Towards waste-efficient building designs10.1016/j.jobe.2019.01.022 ↗
48. Effect of BIM on Rework in Construction Projects in Singapore: Status Quo, Magnitude, Impact, and Strategies10.1061/(ASCE)CO.1943-7862.0001600 ↗
49. Predicting implications of design changes in BIM-based construction projects through machine learning10.1016/j.autcon.2023.105057 ↗
50. Semantic classification and hash code accelerated detection of design changes in BIM models10.1016/j.autcon.2020.103212 ↗
51. Multi-objective optimization in floor tile planning: Coupling BIM and parametric design10.1016/j.autcon.2022.104384 ↗
52. Constructability and Sustainability Studies in Conceptual Projects: A BIM-Based Approach10.1061/JCEMD4.COENG-12767 ↗
53. Pros and Cons of Using Building Information Modeling in the AEC Industry10.1061/(ASCE)CO.1943-7862.0001681 ↗
54. Ridge Regression: Biased Estimation for Nonorthogonal Problems10.1080/00401706.1970.10488634 ↗
55. Model averaging estimator in ridge regression and its large sample properties10.1007/s00362-018-1002-4 ↗
56. Construction Waste Management and Resource Recovery
57. Design for construction waste minimization: Guidelines and practice
58. A scheme of installing ALC wall panels based on autonomous mobile robot