Pull-out performance of precast concrete deck–steel beam–connection concrete shear connection for prefabricated steel–concrete composite beams
Source abstract
Abstract
Abstract Grouped stud connectors are commonly used in prefabricated steel–concrete composite beam bridges, but the reserved holes make it difficult to fabricate the concrete decks and weaken the integrity of the concrete decks. Thereby, a precast concrete deck–steel beam–connection concrete (PCSC) shear connection based on studs and ultra-high performance concrete (UHPC) was proposed in this study, and the experimental and numerical study on the pull-out performance of PCSC connection were carried out. The results indicated that the failure modes of PCSC connection were stud fracture and UHPC conical failure, and both were ductile. The critical length-to-diameter ratio of the studs leading to a transition in the failure mode is approximately 5.0. The load–displacement curves included elastic, elastic-plastic, yield, and failure stages. The length-to-diameter ratio of the studs and the tensile strength of the studs and UHPC are the primary factors affecting the failure mode and the pull-out capacity of PCSC connection. For UHPC conical failure, increasing the length-to-diameter ratio of the studs and decreasing the spacing of the connection enhanced both the pull-out capacity and stiffness. Lastly, based on the test results and the existing calculation formulas for the pull-out capacity of the stud connectors, the theoretical model and calculation formula for predicting the pull-out capacity of PCSC connection were proposed, considering the bond friction at the steel–UHPC interface. The computational method can provide practical guidance for engineering applications and structural design.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Structural Load-Bearing Analysis · Structural Behavior of Reinforced Concrete · Structural Engineering and Vibration Analysis
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (40)
Show source-provided references
1. Evaluation of shear behavior of PCSC shear connection for the construction of composite bridges with prefabricated decks10.1016/j.engstruct.2022.113870 ↗
2. Seismic isolation effect and parametric analysis of simply supported beam bridges with multi-level sliding friction adaptive isolation bearing10.1016/j.soildyn.2024.109000 ↗
3. Effect of shear key geometrical dimensions on seismic performance of prefabricated concrete piers with shallow socket connections10.1016/j.istruc.2024.107975 ↗
4. Rapid hardening high performance concrete (RHHPC) for bridge expansion joints: from material properties to interfacial shear performance10.1016/j.conbuildmat.2024.139638 ↗
5. Study on the influence of roughness and coarse aggregate area on UHPC-NC interface bonding performance10.1617/s11527-024-02507-7 ↗
6. The bond properties between UHPC and stone under different interface treatment methods10.1016/j.conbuildmat.2022.130092 ↗
7. Experimental and numerical analysis of grouped stud shear connectors embedded in HFRC
8. Performance of experimental and theoretical analysis on shear short headed studs embedded in UHPC
9. Headed stud shear connector for thin ultrahigh-performance concrete bridge deck10.1016/j.jcsr.2015.02.001 ↗
10. Static performance of stud shear connectors and UHPC in deck-to-girder composite connection10.1016/j.engstruct.2022.113917 ↗
11. Static behavior of grouped stud shear connectors in steel–precast UHPC composite structures containing thin full-depth slabs10.1016/j.engstruct.2021.113484 ↗
12. Experimental study on grouped stud shear connectors in precast steel–UHPC composite bridge10.1016/j.engstruct.2021.112479 ↗
13. Push-out behavior of headed shear studs welded on thin plates and embedded in UHPC10.1016/j.engstruct.2018.07.013 ↗
14. Static behavior of stud shear connectors in high-strength-steel–UHPC composite beams10.1016/j.engstruct.2020.110827 ↗
15. Static and fatigue behavior of short-headed studs embedded in a thin ultrahigh-performance concrete layer10.1061/(ASCE)BE.1943-5592.0001031 ↗
16. Push-out behavior of short headed stud connectors in steel–ultra high performance concrete composite deck10.1007/s12205-021-1568-6 ↗
17. Behavior and strengths of single cast-in anchors in Ultra- High-Performance Fiber-Reinforced Concrete (UHPFRC) subjected to a monotonic tension or shear10.1007/s12205-013-0246-8 ↗
18. Experimental research on tensile and shear behaviour of the interface between non-steam-cured UHPC and steel plate structure
19. Analysis on pull-out behaviors of single nail connection in steel–UHPC composite beams
20. Concrete Capacity Design (CCD) approach for fastening to concrete
21. Anchorage performance of bolt connection embedded in thin UHPC members10.1016/j.istruc.2021.08.060 ↗
22. Pullout behavior of studs in ultra-high performance concrete with steel fibers and novel structural fibers10.1016/j.istruc.2022.08.017 ↗
23. Tensile test of headed stud in steel–UHPC composite slab10.1016/j.conbuildmat.2022.129686 ↗
24. Pull-out behavior and design of headed studs in steel–UHPC composite structures10.1016/j.compstruct.2023.117135 ↗
25. Pull-out behavior of cluster stud–post pouring UHPC connectors in prefabricated steel–concrete composite beam10.1016/j.engstruct.2024.118082 ↗
26. Shear performance of single embedded nut bolted shear connectors in precast steel–UHPC composite beams under combined tension-shear loads
27. Shear performance of prefabricated steel ultra-high-performance concrete (UHPC) composite beams under combined tensile and shear loads: single embedded nut bolts vs. studs10.3390/buildings14082425 ↗
28. American Association of State Highway and Transportation Officials (2017) AASHTO LRFD Bridge Design Specifications, 8th edition. Washington DC, USA.
29. Flexural performance of prefabricated steel-concrete composite beams with post-poured UHPC connections10.1016/j.istruc.2025.108336 ↗
30. China Architecture & Building Press (2019) GB/T 50081–2019, Standard for Test Methods of Concrete Physical and Mechanical Properties. Beijing, China.
31. China Standards Press (2021) GB/T 228.1–2021, Metallic Materials–Tensile Testing–Part 1: Method of Test at Room Temperature. Beijing, China.
32. Mechanical behavior of natural bonding interface in hollow steel–UHPC composite bridge deck10.1016/j.jcsr.2023.108093 ↗
33. Dassault Systems Simulia Corp (2014) ABAQUS 6.13 User’s Manual.
34. Axial tensile behavior test of ultra high performance concrete
35. Yang · 2007
36. Experimental and numerical study on deformation performance of Rubber-Sleeved Stud connector under cyclic load10.1016/j.conbuildmat.2018.10.099 ↗
37. CEN (2004) EN 1992–1–1, Eurocode 2: Design of Concrete Structures, Part 1–1: General Rules and Rules for Buildings.
38. Birtel V., Mark P. (2006) Parameterised finite element modelling of RC beam shear failure. In: Proceedings of the 19th Annual International ABAQUS Users' Conference 95–108. Boston, USA.
39. Tensile and tensile fatigue behaviour of concrete; experiments, modelling and analyses
40. Anchorage in steel fiber reinforced concrete–concept, experimental evidence and design recommendations for concrete cone and concrete edge breakout failure modes10.1016/j.engstruct.2018.12.007 ↗