Steel plug-in joints are proposed in this study to connect the precast concrete (PC) sidewalls of subway entrance/exit structures. I-section steels cross the joint and transmit internal force with one end embedded in the upper wall panel and the other end grouted into the steel box embedded in the lower wall panel. To describe the shear bearing capacity of steel plug-in joints, shear performance experiments were performed on three specimens. Different grouted lengths (L) of steel were set as 2 times, 2.5 times and 3 times the section height of steel (h). Test results showed that different L produced no marked effect on the shear bearing capacities of the specimens, and the collected shear strengths were larger than the calculated sectional shear bearing capacities according to the concrete-steel composite design. L affected the initial shear stiffness of the specimen to a certain extent. The stiffness increased moderately as L changed from 2 h to 2.5 h. When comprehensively considering mechanical performance and material savings, the grouted length of I-section steel is recommended to be 2.5 times the section height of the steel.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Geotechnical Engineering and Underground Structures · Concrete Corrosion and Durability · Structural Behavior of Reinforced Concrete
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (29)
Show source-provided references
1. Social and environmental benefits of precast concrete technology10.15554/pcij.05012001.14.19 ↗
2. Structural and economic benefits of precast/prestressed concrete construction10.15554/pcij.07012001.34.42 ↗
3. Seismic response analysis of assembled monolithic subway station in the transverse direction10.1016/j.engstruct.2020.110970 ↗
4. Evaluation of corrosion-resistant basalt-fiber-reinforced polymer bars and carbon-fiber-reinforced polymer grid reinforcement to replace steel in precast concrete underground utility vaults
5. A hybrid solution proposal for precast tunnel segments10.1002/suco.202000629 ↗
6. Innovations on components and testing for precast panels to be used in reinforced earth retaining walls10.1016/j.conbuildmat.2010.11.003 ↗
7. The seismic behaviour of precast concrete interior joints with different connection methods in assembled monolithic subway station10.1016/j.engstruct.2020.111799 ↗
8. Application of a combined precast and in-situ-cast construction method for large-span underground vaults10.1016/j.tust.2020.103795 ↗
9. A parametric numerical study on the behavior of large precast tunnel segments during TBM thrust phase10.1016/j.engstruct.2021.112253 ↗
10. Experimental study on cyclic behavior of post-tensioned segmental retaining walls (PSRWs)10.1016/j.engstruct.2020.111619 ↗
11. Development and application of precast concrete double wall system to improve productivity of retaining wall construction10.3390/su12083454 ↗
12. Evaluation of shear capacity of steel fiber reinforced concrete beams without stirrups using artificial intelligence models10.3390/ma15072407 ↗
13. Machine learning-based evaluation of shear capacity of recycled aggregate concrete beams10.3390/ma13204552 ↗
14. Factors affecting bond between new and old concrete
15. Concrete-to-concrete bond strength. Influence of the roughness of the substrate surface10.1016/j.conbuildmat.2004.04.023 ↗
16. Evaluation of bond strength between old and new concrete in structural repairs10.1680/macr.2001.53.6.377 ↗
17. Experimental study on the novel interface bond behavior between fiber-reinforced concrete and common concrete through 3D-DIC10.1155/2021/9090348 ↗
18. A new way to increase the long-term bond strength of new-to-old concrete by the use of fly ash10.1016/S0008-8846(02)01064-5 ↗
19. Experimental study on shear behavior of the interface between new and old concrete with reinforced10.1007/s12205-017-2007-6 ↗
20. Interface shear strength of concrete-to-concrete bond with and without projecting steel reinforcement10.11113/jt.v75.3707 ↗
21. Effect of surface preparation and bonding agent on the concrete-to-concrete interface strength10.1016/j.conbuildmat.2012.07.028 ↗
22. A state-of-the-art review on shear-friction10.1016/j.engstruct.2012.06.036 ↗
23. Shear-friction behavior of grooved construction joints between a precast UHPC girder and a cast-in-place concrete slab10.1016/j.engstruct.2020.111610 ↗
24. Shear-friction behavior of concrete-to-concrete interface under direct shear load10.1016/j.engstruct.2021.112211 ↗
25. Experimental research on interfacial bonding strength between vertical cast-in-situ joint and precast concrete walls10.3390/cryst11050494 ↗
26. Shear performance of the interfaces for precast concrete shear wall components by novel preparation method10.1002/suco.202100504 ↗
27. Experimental study of the shear behaviour of concrete-grout-concrete joints
28. Evaluation of ductility of structures and structural assemblages from laboratory testing
29. China Academy of Building Research · 2016