Study on out-of-plane shear behavior of new tubular roof prefabricated structures
Source abstract
Abstract
The tubular roof prefabricated (TPR) structures consist of steel tubular roof and reinforced concrete. To make full use of tubular roof materials in the structures, the TPR structure is innovated by replacing stirrups with tie bars. This paper performed tests on two specimens with transverse reinforcement ratio as parameter to investigate the shear behavior of new TRP structure members. The results show that the number of transverse reinforcement influences the members’ failure model and shear-bearing capacity. Three-dimensional finite element (FE) models were developed to simulate the shear behavior of new TRP members, and the FE results were in good agreement with the experimental results in the tests. Based on this model, the sensitivity of different factors on the shear performance of new TRP members were analyzed. The main influencing factors were determined, and the suitability of the shear capacity calculation formulas in different codes for new TRP structure members is verified.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Structural Analysis and Optimization · Geotechnical Engineering and Soil Stabilization · Geotechnical Engineering and Underground Structures
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (13)
Show source-provided references
1. Characteristics of subsidence of a road during the new tubular roof construction around a shallow tunnel
2. Monitoring and controlling on surface settlement in sand and gravel strata caused by subway station construction applying pipe-roof pre-construction method (PPM)
3. Study on the effect of parallel pipe jacking spacing on surface subsidence deformation in the pre
4. The prediction of ground settlement of a box culvert jacked under the action of an ultra-shallow buried pipe curtain10.1007/s13369-021-06417-6 ↗
5. Prediction method for surface settlement in tunnel construction with pipe curtain support
6. Bo Lu et al., Novel pipe-roof method for a super shallow buried and large-span metro underground station, Underground Space, Volume 7, Issue 1,2022, Pages 134–150, ISSN 2467–9674.10.1016/j.undsp.2021.06.003 ↗
7. Yang, Xian, et al. Research of Pipe Cutting and Support in Pipe-roof Pre-construction Method. Frontiers in Earth Science: 1010.
8. Finite element analysis on the ground behavior for tunnel with pipe-roof10.5804/LHIJ.2016.7.4.261 ↗
9. Building code requirements for structural concrete and commentary: ACI318–19[S]. Farmington Hills: American Concrete Institute,2019.
10. Australian standard AS 3600: 2018 Sydney: Standards Australia Limited, 2018.
11. CSA Committee A23.3–14. Design of concrete structures (CSAA23.3–14) and commentary [s]. Toronto, Ontario: Canadian Standards Association, 2014.
12. Ministry of Housing and Urban-Rural Development of China. Technical Standard for Steel Plate Concrete Structure of Nuclear Power Station: GB / T 51340—2018. Beijing: China Plan Publishing House, 2018..
13. Japan Electric Association. Technical guidelines for aseismic design of steel plate reinforced concrete structures buildings and structures: JEAG 4618—2005.Tokyo: Japan Electric Association Nuclear Standards Committee, 2005..