Accelerated construction of urban intersections with Portland Cement Concrete Pavement (PCCP)

Kamran M. Nemati, Jeff S. Uhlmeyer

Abstract

The frequent maintenance required on asphalt concrete (AC) pavement sections has made reconstruction with portland cement concrete pavement (PCCP) a feasible alternative. However, many constructability issues need to be addressed in order to realize the full potential of this alternative. Accelerated paving encompasses three classes of activities: methods to accelerate the rate of strength gain, methods to minimize the construction time, and traffic control strategies to minimize user delay. In this paper a case study will be presented in which an AC intersection was reconstructed with portland cement concrete pavement. The entire reconstruction of the intersection, including demolition of the AC pavement and its replacement with PCCP, took place over a period of three days, starting on Thursday evening and opening the intersection to the traffic on Sunday afternoon. This paper documents this effort in order to provide practitioners additional options for rapid reconstruction of urban intersections and includes documentation of the construction process, traffic management strategies, and an analysis of the costs. The results of this investigation can be used to educate pavement construction professionals and the academic community on the use of PCCP for accelerated reconstruction of major urban intersections with minimal user and traffic disruption, using innovative construction techniques and traffic management optimization principles. This investigation produced valuable information to demonstrate that concrete pavements can be constructed efficiently and quickly.
Source: openalex_inverted_index · Quality: baseline

Research context

OpenAlex topics: Asphalt Pavement Performance Evaluation · Infrastructure Maintenance and Monitoring · Underground infrastructure and sustainability

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (13)

Show source-provided references
1. American Concrete Institute · 2019
2. American Concrete Pavement Association · 2012
3. American Concrete Pavement Association · 1994
4. American Concrete Pavement Association · 2007
5. ASTM C150/C150M · 2019
6. ASTM C1074 · 2017
7. ASTM C494/C494M · 2017
8. ASTM C260/C260M · 2016
9. ASTM C309 · 2011
10. Rapid intersection reconstruction – Kennewick, Washington, Power Point Presentation for the American Concrete Pavement Association Seminar
11. Rapid intersection reconstruction - Kennewick, Washington
12. Washington State Department of Transportation · 2001
13. Washington State Department of Transportation · 2000