Time–cost relationship for predicting construction duration
Source abstract
Abstract
Reliable estimates of project cost and duration are necessary inputs for decision-making in the earliest stages of construction projects. As little data is available, the estimates can only rest upon records of similar completed schemes. The tools that use such records to facilitate project planning continue to be the object of interest of researchers. This paper investigates the applicability of a simple regression model for the prediction of road construction duration on the basis of early cost estimates. Statistical validity of the model was confirmed, and its predictive ability tested.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Construction Project Management and Performance · BIM and Construction Integration · Value Engineering and Management
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References
Reference metadata was not supplied for this record.