Accelerated Concrete Carbonation and Resulting Rebar Corrosion Under a High Temperature Condition in Nuclear Power Plants

Shiro Mitsugi, Eiji Owaki, Hirotaka Masuda, Ryu Shimamoto

Abstract

To assess the durability of concrete structures at nuclear power plants in Japan, plant life management technical evaluation is performed in accordance with the guidelines of the Architectural Institute of Japan for the maintenance and management of structures in nuclear facilities. Concrete carbonation is one of the degradation factors covered in the guidelines, and sampling is performed to confirm the progression of carbonation and predict future progression. Electricity providers in Japan perform sampling at locations constituting environments (temperature, relative humidity, carbon dioxide concentration) where carbonation progresses relatively fast to confirm that carbonation has not reached the rebars and to predict progression. In this study, accelerated carbonation tests were performed at high temperature, which is believed to accelerate carbonation, considering the parameters of relative humidity. Progression of carbonation and its impact on rebar corrosion were examined. The results showed that progression of carbonation in high-temperature environments can be predicted with a margin of safety using the Architectural Institute of Japan’s durability prediction equation. Moreover, because the humidity environments where carbonation progresses and the temperature environments where rebar corrosion progresses do not correspond with each other, rebars are typically unlikely to corrode even if carbonation has reached the rebars, provided they are not subjected to extreme wet-dry cycles.
Source: openalex_inverted_index · Quality: baseline

Research context

OpenAlex topics: Concrete Corrosion and Durability · Concrete and Cement Materials Research · Concrete Properties and Behavior

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Nuclear Facilities Division, Taisei Corporation, 1-25-1 Nishi-Shinjuku, Shinjuku-ku, Tokyo 163-0606, Japan.

Taisei Advanced Center of Technology, Taisei Corporation, 344-1, Nase, Totsuka, Yokohama 245-0051, Japan.

Construction Project Group, Civil ∓ Architectural Engineering Dept., Shikoku Electric Power Co., Inc., 2-5, Marunouchi, Takamatsu-shi, Kagawa 760-8573, Japan.

Civil & Architectural Engineering Department, Nuclear Power Division, Chubu Electric Power Co., Inc., 1, Higashi-Shincho, Higashi-Ku, Nagoya 461-8680, Japan.

References (49)

Show source-provided references
1. 1) Adachi, M., Kiyohara, K., Mitarai, Y. and Hiraoka, N., (1993). “Concrete for nuclear power plant facilities.” Concrete Journal, 31(3), 61-66. (in Japanese)10.3151/coj1975.31.3_61 ↗
2. 2) AIJ, (1988). “Recommendations for structural design of reactor buildings.” Tokyo: Architectural Institute of Japan. (in Japanese)
3. 3) AIJ, (2001). “Reinforced concrete work at nuclear power plants (Japan Architectural Standard Specification JASS 5N).” Tokyo: Architectural Institute of Japan. (in Japanese)
4. 4) AIJ, (2015). “Guidelines for maintenance and management of structures in nuclear facilities.” Tokyo: Architectural Institute of Japan.
5. 5) Ceukelaire, L. D. and Nieuwenburg, D. V., (1993). “Accelerated carbonation of a blast-furnace cement concrete.” Cement and Concrete Research, 23, 442-452.10.1016/0008-8846(93)90109-M ↗
6. 6) Chen, Y., Liu, P. and Yu, Z., (2018). “Effects of environmental factors on concrete carbonation depth and compressive strength.” Materials, 11(11), 2167.10.3390/ma11112167 ↗
7. 7) Drouet, E., Poyet, S., Bescop, P. L., Torrenti, J. M. and Bourbon, X., (2019). “Carbonation of hardened cement pastes: Influence of temperature.” Cement and Concrete Research, 115, 445-459.10.1016/j.cemconres.2018.09.019 ↗
8. 8) Ferreira, M., Bohner, E. and Saarela, O., (2015). “Modelling the time to concrete cover cracking due to reinforcement corrosion.” In: Proceedings of the 23rd International Conference on Structural Mechanics in Reactor Technology, Manchester, UK 10-14 August 2015. New York: Curran Associates. Vol. 3, 1454-1463.
9. 9) Ferreira, M., Bohner, E. and Saarela, O., (2016). “Designing concrete durability by coupling limit states of corrosion initiation and corrosion induced cracking of concrete cover.” Nordic Concrete Research, 54, 7-20.
10. 10) Fujino, T. and Kushida, T., (1969). “Concrete works at Tsuruga Nuclear Power Plant.” Concrete Journal, 17(9), 21-31. (in Japanese)10.1680/macr.1969.21.66.31 ↗
11. 11) Fujiwara, K., (2008). “Tsuruga Nuclear Power Plant Unit 1.” Concrete Journal, 46(9), 147-150. (in Japanese)10.3151/coj1975.46.9_147 ↗
12. 12) Hayashi, T. and Fujiki, Y., (1972). “Execution of concrete in Shimane Nuclear Power Station shielding wall.” Concrete Journal, 10(2), 23-32. (in Japanese)
13. 13) Horiuchi, M., Sugihara, K. and Iwasawa, J., (1975). “Concrete works in the construction of Unit 1 at Hamaoka Nuclear Power Plant.” Concrete Journal, 13(8), 11-20. (in Japanese)10.3151/coj1975.13.8_11 ↗
14. 14) Houst, Y. F., (1996). “The role of moisture in the carbonation of cementitious materials.” Internationale Zeitschrift für Bauinstandsetzen, 2(1), 49-66.10.1515/rbm-1996-5083 ↗
15. 15) Huet, B., L’Hostis, V., Idrissi, H. and Tovena, I., (2003). “A review on corrosion mechanisms of reinforced concrete degradation.” In: Proceedings of the International Conference on Environmental Degradation of Engineering Materials (EDEM 2003), Bordeaux, France 29 June-July 2003. Leeds, UK: Maney Publishing.
16. 16) Ibaraki, M., Sugawara, N., Hakozaki, T. and Sugita, H., (1995). “Consideration of concrete strength in new construction of Unit 2 of Onagawa Nuclear Power Plant.” Proceedings of AIJ Tohoku Chapter Architectural Research Meeting, 58, 311-314. (in Japanese)
17. 17) Inoue, K., Kai, S., Yamazaki, A., Takahashi, H., Nakane, J. and Kubota, S., (1974a). “Concrete quality management in nuclear power plant construction, Part 1: Concrete quality management standards.” Summaries of Technical Papers of Annual Meeting of the Architectural Institute of Japan, 49, 147-148. (in Japanese)
18. 18) Inoue, K., Kai, S., Yamazaki, A., Takahasi, H. and Kubota, S., (1974b). “Concrete quality management in nuclear power plant construction, Part 2: Concrete quality management results.” Summaries of technical papers of annual meeting of Architectural Institute of Japan, 49, 149-150. (in Japanese)
19. 19) Inoue, K., Shigenobu, M., Fukushima, K., Noguchi, H., Noda, Y. and Sakaguchi, T., (1989). “Precooling of concrete with flake ice - Manufacturing equipment of concrete in Genkai Unit No. 3/4 Nuclear Power Station - Construction.” Cement & Concrete, 505, 8-19. (in Japanese)
20. 20) Ishii, T., (1982). “Concrete quality management in construction of Shikoku Electric Power Company’s Ikata Nuclear Power Plant Unit 2.” Cement & Concrete, 421, 44-55. (in Japanese)
21. 21) Kadoki, S., Yoshida, K. and Tagawa, M., (2003). “Concrete production by batching plant for Shika Nuclear Power Plant Unit 2 and quality management.” Electric Power Civil Engineering, 306, 54-58. (in Japanese)
22. 22) Kanamori, N., Yamamoto, M. and Kamio, A., (1983). “Concrete works in the construction of Unit No. 3 and No. 4 at Takahama Nuclear Power Station of the Kansai Electric Power Company.” Concrete Journal, 21(11), 61-71. (in Japanese)10.3151/coj1975.21.11_61 ↗
23. 23) Kawahara, K., Yoshioka, Y. and Ito, Y., (2009). “Concrete production by concrete plant for Shimane Nuclear Power Plant Unit 3 and quality management.” Electric Power Civil Engineering, 341, 57-61. (in Japanese)
24. 24) Leemann, A. and Moro, F., (2016). “Carbonation of concrete - The role of CO2 concentration, relative humidity and CO2 buffer capacity.” Materials and Structures, 50(1), 30-43.10.1617/s11527-016-0917-2 ↗
25. 25) Liu, P., Chen, Y., Yu, Z. and Zhang, R., (2019). “Effect of temperature on concrete carbonation performance.” Advances in Materials Science and Engineering, Article ID 9204570.10.1155/2019/9204570 ↗
26. 26) Masaoka, I. and Saito, M., (1982). “Concrete works in the construction of the Fukushima No. 2 Nuclear Power Plant.” Concrete Journal, 20(7), 32-41. (in Japanese)10.3151/coj1975.20.7_32 ↗
27. 27) Morishita, H., (1997). “Nuclear power plants.” Concrete Journal, 35(3), 58-61. (in Japanese)
28. 28) Morishita, H., Tsuchiya, Y., Eguchi, K. and Hosaka, H., (1998a). “Construction of Kashiwazaki-Kariwa Nuclear Power Plant: Concrete production results.” Concrete Journal, 36(5), 22-26. (in Japanese)
29. 29) Morishita, H., Tsuchiya, Y., Eguchi, K. and Hosaka, S., (1998b). “Construction of Kashiwazaki-Kariwa Nuclear Power Plant: Mix design and quality control of concrete for RCCV in Unit No. 6 and 7.” Concrete Journal, 36(9), 39-42. (in Japanese)
30. 30) Morishita, H., Tsuchiya, Y., Kaneko, S. and Nakamura, K., (1998c). “Construction of Kashiwazaki-Kariwa Nuclear Power Plant: Construction method and technical study of concrete for RCCV in Unit No. 6 and 7.” Concrete Journal, 36(10), 36-40. (in Japanese)
31. 31) Nakajima, H., Tada, H. and Kitada, T., (1989). “Concrete production and quality management for Ikata Nuclear Power Plant Unit No. 3.” Electric Power Civil Engineering, 218, 105-116. (in Japanese)
32. 32) Nomura, A., Tanaka, H. and Shirosaka, Y., (1974). “Construction report for Unit 3 of Fukushima Nuclear Power Plant.” Concrete Journal, 12(6), 72-81. (in Japanese)
33. 33) Ogawa, Y., Sakaguchi, H. and Ichihashi, T., (2003). “Quality assurance initiatives at Hamaoka Nuclear Power Plant: Construction of water intake tank for Hamaoka Nuclear Power Plant Unit 5.” Concrete Journal, 41(11), 45-50. (in Japanese)10.3151/coj1975.41.11_45 ↗
34. 34) Ohno, T., Terada, J. and Kogaki, Z., (1974). “Construction report for Units 1, 2 of Takahama Nuclear Power Plant.” Concrete Journal, 12(6), 72-92. (in Japanese)
35. 35) Otsuka, S., Ishikawa, K. and Toiyama, M., (2004). “Construction of reinforced concrete containment vessel (RCCV): Hamaoka Nuclear Power Station Unit 5.” Concrete Journal, 42(3), 49-54. (in Japanese)10.3151/coj1975.42.3_49 ↗
36. 36) Parrott, L. J., (1991). “Carbonation, moisture and empty pores.” Advances in Cement Research, 4(15), 111-118.10.1680/adcr.1992.4.15.111 ↗
37. 37) Russell, D., Basheer, P. A. M., Rankin, G. I. B. and Long, A. E., (2001). “Effect of relative humidity and air permeability on prediction of the rate of carbonation of concrete.” Structures and Buildings, 146(3), 319-326.10.1680/stbu.2001.146.3.319 ↗
38. 38) Salvoldi, B. G., Beushausen, H. and Alexander, M. G., (2015). “Oxygen permeability of concrete and its relation to carbonation.” Construction and Building Materials, 85, 30-37.10.1016/j.conbuildmat.2015.02.019 ↗
39. 39) Shiire, T. and Kasami, H., (1989). “Concrete quality management.” Concrete Journal, 27(4), 41-47. (in Japanese)10.3151/coj1975.27.4_41 ↗
40. 40) Stefanoni, M., Angst, U. and Elsener, B., (2018). “Corrosion rate of carbon steel in carbonated concrete - A critical review.” Cement and Concrete Research, 103, 35-48.10.1016/j.cemconres.2017.10.007 ↗
41. 41) Suzuki, K., Tanabe, I. and Eguchi, K., (1984). “Quality control of concrete production in nuclear power plant construction.” Summaries of Technical Papers of Annual Meeting of Architectural Institute of Japan, 59, 367-368. (in Japanese)
42. 42) Tanaka, M., Nakamura, K., Kobayashi, K. and Okamoto, K., (1999). “Survey of concrete in nuclear power plants (for concrete using crushed sand alone as fine aggregate).” Summaries of Technical Papers of Annual Meeting of Architectural Institute of Japan, 1999, 305-306. (in Japanese)
43. 43) Tanaka, M., Tanji, I., Hirotani, K. and Iwakami, S., (2006). “Study of concrete quality management in new construction of Unit 1 of Higashidori Nuclear Power Plant.” Concrete Journal, 44(9), 143-146. (in Japanese)10.3151/coj1975.44.9_143 ↗
44. 44) Tanji, I., Okada, Y. and Odaka, K., (1999). “Methods of shortening construction period of Onagawa Nuclear Power Plant Unit 3.” Concrete Journal, 37(12), 34-37. (in Japanese)10.3151/coj1975.37.12_34 ↗
45. 45) Ueda, K., Kimura, M. and Ohta, S., (1989). “The reactor building structural works at site ‘Monju’, the prototype fast breeder reactor.” Concrete Journal, 27(10), 34-41. (in Japanese)10.3151/coj1975.27.10_34 ↗
46. 46) Umeki, Y., Sawada, S., Mitsugi, S., Maenaka, T. and Takiguchi, K., (2016). “Outline of guidelines for maintenance and management of structures in nuclear facilities.” Journal of Advanced Concrete Technology, 14(10), 643-663.10.3151/jact.14.643 ↗
47. 47) Yamamoto, M., Setogawa, S. and Kimura, M., (1991). “Concrete works in the construction of PCCVs in Unit No. 3 and No. 4 at Ohi Nuclear Power Station.” Concrete Journal, 29(2), 27-40. (in Japanese)10.3151/coj1975.29.2_27 ↗
48. 48) Yonashiro, A., Kimura, M. and Takemoto, Y., (1986). “Construction of concrete frame of PCCV at Japan Atomic Power Company’s Tsuruga Unit 2.” Journal of Prestressed Concrete (Special Issue), 28, 43-55. (in Japanese)
49. 49) Yonezawa, T., Oshida, F., Honma. D., Yamaguchi, Y., Okamoto, H. and Nakao, M., (2014). “Corrosion rate of steel reinforcement after carbonation of concrete.” Journal of Structural and Construction Engineering (Transactions of AIJ), 79(704), 1405-1414. (in Japanese)10.3130/aijs.79.1405 ↗