Multi-Level Spatial Design Decision-Making Model for Block Caving Systems in Super-Large Open-Pit Mines

Qi-Ang Wang, Gao-Yu Cui, Guo-Quan Sun, Bei-Dou Ding, Zhan-Guo Ma, Jia-Mian Yang, Peng Gong, Ji Liu, Hao-Yu Zhu

Applied Sciences· Volume 16· Issue 13

Abstract

As global super-large open-pit mines expand in scale and extraction depth, conventional single-stage planning cannot meet the combined demands of productivity and resource recovery, making the shift to underground block caving inevitable. This study outlines the systemic challenges of block-scale extraction and the rationale for adopting multi-level spatial design decision-making. Four core model categories are briefly proposed: ultimate pit limit optimization, gravity flow simulation for draw strategy, long-term production scheduling for large-scale computation, and probabilistic frameworks addressing geological and market uncertainty. A Bayesian network-based block decision model is then proposed and decoupled into three physical decision tiers. The first tier incorporates energy prices, transport costs, and ore prices to establish an economic boundary rating robust to market volatility. The second tier aggregates mining units with discrete-event perturbations to produce a reliability-oriented production rating. The third tier integrates rock mechanics parameters with in situ monitoring data to derive a physics-informed safety rating. The three ratings are synthesized via Bayesian inference and evaluated within a multi-attribute utility function encompassing net present value, safety index, downside risk, and information risk. A feedback module quantifies the economic benefit of uncertainty reduction, yielding a closed-loop intelligent system spanning macroeconomic boundary definition to operational safety alerting. Finally, the main conclusion of this study is that integrating macro-economic volatility with rock mechanics through a dynamic Bayesian framework is essential for managing the open-pit to underground transition. The results indicate that leveraging the Value of Information for real-time risk diagnosis significantly reduces conservative design losses, providing a quantifiable and robust decision-making paradigm for super-large mining systems.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Mining Techniques and Economics · Rock Mechanics and Modeling · Tunneling and Rock Mechanics

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

State Key Laboratory for Geomechanics and Deep Underground Engineering, School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou 221008, China

Sinosteel Maanshan General Institute of Mining Research Co., Ltd., Maanshan 243071, China

Funding

National Key Research and Development Program of China · National Natural Science Foundation of China · China Postdoctoral Science Foundation

References (78)

Show source-provided references
1. Heuristic and Exact Approaches to Optimize the Production Scheduling of Mines Transitioning from the Open-Pit to Block Caving
2. Optimizing transition: Investigating the influence of operational parameters on production scheduling optimization for mines transitioning from open pit to block caving methods10.1007/s11081-024-09927-y ↗
3. An application of branch and cut to open pit mine scheduling10.1023/A:1024835022186 ↗
4. OP-UG TD optimizer tool based on Matlab code to find transition depth from open pit to block caving
5. Numerical analysis of block caving-induced instability in large open pit slopes: A finite element/discrete element approach10.1007/s00603-009-0035-3 ↗
6. Investigation of the Main Parameters in the Determination of Open-Pit to Underground Transition Depth for Copper and Iron Deposits
7. Design and evaluation of single-phase drawbell excavation at the Chuquicamata underground mine
8. A New Mining Scheme for Hanging-Wall Ore-Body During the Transition from Open Pit to Underground Mining: A Numerical Study10.1155/2018/1465672 ↗
9. Stochastic optimisation of long-term block cave scheduling with hang-up and grade uncertainty10.1080/17480930.2018.1432009 ↗
10. The influence of anthropogenic topographic changes on geomorphological processes in the city of Rome (Italy): A case study of the Malagrotta area10.1002/esp.70033 ↗
11. Disturbance effect of open-pit mine: Concept, characteristics and evaluation index system framework
12. Dynamic Analysis of Ecological Sustainability of Mine Economic System
13. Analysis of Coordinated Development Strategy Between Exploitation and Utilization of Mineral Resources and Ecological Environment
14. Set pair analysis of sustainability comprehensive assessment in surface mining area
15. A review of operations research in mine planning10.1287/inte.1090.0492 ↗
16. An integrated approach to open-pit mines production scheduling10.1016/j.resourpol.2021.102459 ↗
17. Particle swarm optimization10.1109/ICNN.1995.488968 ↗
18. China’s Environmental Problems Caused by Surface Mining Control and Countermeasures
19. Research of the present situation and development trend of intelligent coal mine construction market
20. Digital twin-driven product design, manufacturing and service with big data10.1007/s00170-017-0233-1 ↗
21. Three-dimensional geological modeling and its application in digital mine10.1007/s11430-013-4671-9 ↗
22. Li, X., Jin, S.M., and Li, Z.B. (2024). Current Situation and Development Strategies of Digital Mining Construction. Energy Energy Conserv., 96–108.
23. Establishing a sustainable mining operation: An overview10.1016/j.jclepro.2010.08.019 ↗
24. Technological innovation and engineering practice of damage reduction mining and ecosystem restoration in open-pit coal mine10.1017/sus.2024.46 ↗
25. Venturelli, D., Marchand, D.J.J., and Rojo, G. (2015). Quantum annealing implementation of job-shop scheduling. arXiv.
26. A multiple objective genetic algorithm approach for stochastic open pit production scheduling optimisation10.1080/17480930.2023.2196918 ↗
27. A transition from a large open pit into a novel “macroblock variant” block caving geometry at Chuquicamata mine, Codelco Chile10.1016/j.jrmge.2018.08.010 ↗
28. The influence of backfilling of a caved zone and magma intrusion-type faults on surface deformation in a metal mine caused by sublevel caving mining10.1016/j.ijrmms.2024.105677 ↗
29. Application of 5G communication technology based on intelligent sensor network in coal mining10.1155/2023/2114387 ↗
30. A hybrid intelligent optimization algorithm for long-term production planning of open-pit mine considering carbon reduction plan10.1016/j.swevo.2025.102078 ↗
31. Semi-symmetrical production scheduling of an orebody for optimizing the depth of transitioning from open pit to block caving10.1016/j.resourpol.2020.101700 ↗
32. A fast and elitist multiobjective genetic algorithm: NSGA-II10.1109/4235.996017 ↗
33. Giannini, L.M. (1990). Optimum Design of Open Pit Mines. [Master’s Thesis, Curtin University].
34. Phillips, D.A. (1972, January 10–14). Optimum design of an open pit. Proceedings of the 10th Application of Computers in the Mineral Industries Symposium, Johannesburg, South Africa.
35. Optimizing the open pit-to-underground mining transition10.1016/j.ejor.2016.07.021 ↗
36. Whittle, J. (1988). Beyond optimization in open pit design. Computer Applications in the Mineral Industry, CRC Press.
37. Hustrulid, W., and Kuchta, M. (1995). Open Pit Mine Planning and Design. Volume 1-Fundamentals.
38. Development of a gravity flow numerical model for the evaluation of drawpoint spacing for block/panel caving
39. Discussion: A discrete numerical model for granular assemblies10.1680/geot.1980.30.3.331 ↗
40. Discrete element modeling of strata and surface movement induced by mining under open-pit final slope10.1016/j.ijrmms.2016.07.006 ↗
41. Geotechnical analysis of gravity flow during block caving
42. Stewart, C.A., Allman, A., and Hall, B.E. (2010). Block cave optimisation—A value driven approach. Caving 2010: Proceedings of the Second International Symposium on Block and Sublevel Caving, Australian Centre for Geomechanics.10.36487/ACG_rep/1002_13_Stewart ↗
43. Optimisation of life-of-mine production scheduling for block-caving mines under mineral resource and material mixing uncertainty10.1080/17480930.2021.1976010 ↗
44. A clustering algorithm for block-cave production scheduling10.15377/2409-5710.2018.05.4 ↗
45. Production scheduling with horizontal mixing simulation in block cave mining10.1134/S1062739119056161 ↗
46. Production scheduling with uncertain supply: A new solution to the open pit mining problem10.1007/s11081-012-9186-2 ↗
47. Rayo, J.D., Mercado, J.M., and Encina, V. (2016, January 21–23). Simulation of block caving operation using a discrete element method (DEM). Proceedings of the Conference Paper of Minin 2016, Santiago, Chile.
48. A multi-step approach for block-cave production scheduling optimization10.1016/j.ijmst.2013.08.019 ↗
49. Melati, S., Wattimena, R.K., Sahara, D.P., Simangunsong, G.M., Hidayat, W., Riyanto, E., and Felisia, R.R.S. (2023). Block Caving Mining Method: Transformation and Its Potency in Indonesia. Energies, 16.10.3390/en16010009 ↗
50. Inclusion of Risk Assessment in Open-Pit Design and Scheduling
51. A genetic algorithm for temporal and spatial alignment of long- and medium-term mine production scheduling for open-pit mines10.1016/j.resourpol.2025.105629 ↗
52. McGeoch, C.C. (2022). Adiabatic Quantum Computation and Quantum Annealing: Theory and Practice, Springer Nature.
53. Long-term open pit mine production planning: A review of models and algorithms10.1080/17480930601118947 ↗
54. Optimization Model of Underground Stope Working Plan Based on Heuristic Genetic Algorithm
55. Particle swarm optimization: An overview10.1007/s11721-007-0002-0 ↗
56. Survey on Particle Swarm Optimization Algorithm
57. Particle swarm optimization for transportation dispatching system of open-pit mines
58. Net present value maximization model for optimum cut-off grade policy of open pit mining operations
59. Optimization by simulated annealing10.1126/science.220.4598.671 ↗
60. A simulated annealing based stochastic long-term production scheduling of open-pit mines with stockpiling under grade uncertainty10.1080/17480930.2022.2140543 ↗
61. Simulated annealing algorithm for the open-pit mine transportation problem
62. A simulated annealing based approach for open pit mine production scheduling with stockpiling option10.1016/j.resourpol.2021.102016 ↗
63. Application of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit mines
64. A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty10.1016/j.ejor.2012.05.029 ↗
65. Risk assessment in reserve estimation and open-pit planning
66. Efficient Positioning Method for Underground Pipe Gallery Inspection Based on UWB Adaptive Fusion10.1049/cmu2.70037 ↗
67. Applications, classifications, and challenges: A comprehensive evaluation of recently developed metaheuristics for search and analysis10.1007/s10462-025-11377-6 ↗
68. Influence diagrams10.1287/deca.1050.0020 ↗
69. Uncertainty-awarded, high-precision multi-step prediction of structural health monitoring sensor streams under extreme typhoon events: An enhanced Bayesian dynamic linear model leveraging the kernel regression basis function for severe environmental adaptation10.1016/j.measurement.2025.120050 ↗
70. Application of Bayesian networks in reliability assessment: A systematic literature review10.1016/j.istruc.2024.108098 ↗
71. Data interpretation and forecasting of SHM heteroscedastic measurements under typhoon conditions enabled by an enhanced Hierarchical sparse Bayesian Learning model with high robustness10.1016/j.measurement.2024.114509 ↗
72. Wang, Q.A., Lu, A.W., Ni, Y.Q., Wang, J.F., and Ma, Z.G. (2025). Bayesian Network in Structural Health Monitoring: Theoretical Background and Applications Review. Sensors, 25.10.3390/s25123577 ↗
73. Towards high-accuracy data modelling, uncertainty quantification and correlation analysis for SHM measurements during typhoon events using an improved most likely heteroscedastic Gaussian process
74. Towards high-precision data modeling of SHM measurements using an improved sparse Bayesian learning scheme with strong generalization ability10.1177/14759217231170316 ↗
75. Keeney, R.L., and Raiffa, H. (1993). Decisions with Multiple Objectives: Preferences and Value Trade-Offs, Cambridge University Press.10.1017/CBO9781139174084 ↗
76. Data Mining-Driven Bayesian Network for Initial Scenario Recognition and Prediction of Hazardous Chemical Leakage10.1016/j.jlp.2026.106014 ↗
77. Pearl, J. (2014). Probabilistic Reasoning in Intelligent Systems: Networks of Plausible Inference, Elsevier.
78. Koller, D., and Friedman, N. (2009). Probabilistic Graphical Models: Principles and Techniques, MIT Press.