Abstract
In the process of oil and gas drilling, the blowout preventer (BOP) serves as the last line of defense before wellhead loss of control, and its sealing reliability is of critical importance. However, under the erosion of high-pressure sand-containing fluids, the sealing components of the BOP are prone to failure, resulting in long-slit-type leakage ports, which seriously threaten well control safety. In response to the current lack of theoretical guidance for emergency plugging process parameters, this paper adopts the coupled computational fluid dynamics and discrete element method (CFD-DEM) to establish a numerical model for the plugging of long-slit-type gaps with particles under blowout conditions. The migration and bridging plugging behaviors of three typical shaped particles, namely spherical, cylindrical, and square, under different sizes, concentrations, and pump injection rates are systematically studied. The results indicate that particle transport within the wellbore can be divided into an initial transport stage dominated by jet diffusion and a plugging-structure formation stage dominated by bridging and particle accumulation. When the particle size exceeds the slit width, cylindrical particles exhibit comparatively better plugging performance under the conditions considered in this study. For a long-slit leakage channel with a width of 5 mm, the combination of cylindrical particles with an equivalent diameter of 6 mm, a particle volume concentration of 20%, and a pumping rate of 2.4 m3/min demonstrated relatively favorable overall plugging performance. The particle concentration mainly affects the bridging time, and the bridging time tends to stabilize when the concentration reaches 20%. The higher the pump injection rate, the earlier the particles reach the gap opening, but it has little impact on the final plugging effect. This study provides a scientific basis for the optimization of emergency plugging process parameters after BOP sealing failure, filling the gap in the research on the plugging mechanism of equipment leakage under blowout conditions.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Drilling and Well Engineering · Erosion and Abrasive Machining · Nuclear Engineering Thermal-Hydraulics
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Petrochina Tarim Oilfield Company, Kuerle 841000, China
School of Mechatronic Engineering, Southwest Petroleum University, Chengdu 610500, China
Funding
Tarim Oilfield
References (23)
Show source-provided references
1. Progress and Prospects of Well Control Technology for Oil and Gas Wells
2. Huang, X. (2014). Analysis of the Working Mechanism and Structural Improvement of Shear Ram Blowout Preventers. [Master’s Thesis, Southwest Petroleum University].
3. Development and application of wellhead resetting bottom flange hoop in runaway well
4. Wang, G. (2017). Research on a Real-Time Monitoring System for Offshore Blowouts. [Master’s Thesis, School of Offshore Oil and Gas Engineering, Xi’an Shiyou University].
5. Engineering Technology and Marketing Department of China National Petroleum Corporation, and Petroleum Engineering Technology Contractors Association of China National Petroleum Corporation (2006). Compilation of Blowout Accident Cases of China National Petroleum Corporation, Petroleum Industry Press.
6. Zheng, S. (2017). Design of a Blowout Emergency Rescue Device for Dry-Well Drilling Operations. [Master’s Thesis, China University of Petroleum].
7. Development and performance test of an expansive particle temporary plugging agent10.1088/1742-6596/2539/1/012014 ↗
8. Temporary Remedial Measures Using Hemp-Fiber Soft Packing under Seal Failure Conditions of Ram Blowout Preventers
9. Emergency Plugging Test System and Experiment for Blowout Preventer Seal Failure under Ultrahigh-Pressure and Large Displacement Conditions10.2118/228426-PA ↗
10. Study on Plugging Process Parameters and Mechanism of Large-Scale Plugging Experimental Device for Blowout Preventer Stack10.2118/223955-PA ↗
11. Research on the Development and Plugging Capacity of a Honeycomb Porous Lost-Circulation Material10.1021/acsomega.2c01477 ↗
12. Plugging performance and mechanism of temperature-responsive adhesive lost circulation material10.1016/j.petrol.2022.110771 ↗
13. Discrete element simulation of granular lost circulation material plugging a fracture10.1080/02726351.2013.829546 ↗
14. Feng, Y., Li, G., Meng, Y., and Guo, B. (2018). A novel approach to investigating transport of lost circulation materials in rough fracture. Energies, 11.10.3390/en11102572 ↗
15. Coupled CFD-DEM analysis of parameters on bridging in the fracture during lost circulation10.1016/j.petrol.2019.106501 ↗
16. A coupled CFD-DEM numerical simulation of formation and evolution of sealing zones10.1016/j.petrol.2021.109765 ↗
17. Experimental and numerical investigations of particle plugging in fracture-vuggy reservoir: A case study10.1016/j.petrol.2021.109610 ↗
18. A high-order stabilized solver for the volume averaged Navier–Stokes equations10.1002/fld.5182 ↗
19. Emergency plugging of shear ram failure10.1016/j.geoen.2023.212400 ↗
20. Research on plugging mechanism under blowout conditions for hole-type seal failure for blowout preventer10.1007/s40571-025-00950-z ↗
21. Hydrodynamics of binary fluidization in a riser: CFD simulation using two granular temperatures10.1016/S0009-2509(03)00238-0 ↗
22. Mathematical modeling of two-phase flow10.1146/annurev.fl.15.010183.001401 ↗
23. Study on the law and mechanism of particle migration in high pressure pumping pipeline10.1016/j.cherd.2024.10.025 ↗