Adaptive OEE: A FUCOM-TOPSIS Framework for Context-Driven Equipment Effectiveness

Vitor Anes, Pedro Marques, António Abreu

Applied Sciences· Volume 16· Issue 10

Abstract

Overall Equipment Effectiveness (OEE) measures manufacturing productivity as the product of Availability (A), Performance (P), and Quality (Q). Despite its widespread adoption, the classical OEE formula embeds a structural limitation, i.e., the three components are treated as equally important regardless of operational context. This fixed-weight assumption distorts maintenance prioritisation in environments where one component dominates operational losses. To the best of the authors’ knowledge, no published framework has formally addressed this limitation through a structured, auditable multi-criteria weighting model. This paper proposes Adaptive OEE, a FUCOM–TOPSIS framework that replaces the fixed A × P × Q product with a context-driven weighting model. FUCOM derives context-specific weights for A, P, and Q from expert judgement with minimum elicitation effort and mathematically guaranteed consistency. TOPSIS is adapted from its classical formulation by replacing data-derived ideal solutions with fixed reference poles defined independently of the observed data, ensuring that the effectiveness score of each asset is not influenced by the performance of other assets in the dataset. Three illustrative case studies covering availability-dominant, performance-dominant, and quality-dominant industrial scenarios suggest that classical OEE rankings are not preserved under asymmetric weight configurations, with ranking divergence being most severe when one component carries strongly asymmetric weight, precisely the condition that equal weighting cannot accommodate. The principal contributions are the formalisation of the equal-weight assumption as a formal methodological limitation, the replacement of multiplicative aggregation with a weighted distance measure, and the adaptation of TOPSIS with fixed reference poles for context-independent asset scoring. The framework is directly applicable by maintenance managers and industrial engineers seeking operationally justified equipment rankings without specialised analytical expertise.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Reliability and Maintenance Optimization · Engineering and Test Systems · Forecasting Techniques and Applications

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Instituto Superior de Engenharia de Lisboa, Instituto Politécnico de Lisboa, Rua Conselheiro Emídio Navarro 1, 1959007 Lisboa, Portugal

UNIDEMI, Department of Mechanical and Industrial Engineering, NOVA School of Science and Technology, Universidade NOVA de Lisboa, 2829516 Caparica, Portugal

Laboratório Associado de Sistemas Inteligentes, LASI, 4800058 Guimarães, Portugal

Lusófona University, Campo Grande, 376, 1749024 Lisboa, Portugal

Associated Lab of Intelligent Systems (LASI), Center of Technology and Systems (UNINOVA-CTS), 2829516 Caparica, Portugal

Funding

Fundação para a Ciência e a Tecnologia

References (30)

Show source-provided references
1. Nakajima, S., and Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance, Productivity Press.
2. Performance Measurement Using Overall Equipment Effectiveness (OEE): Literature Review and Practical Application Discussion10.1080/00207540601142645 ↗
3. Ng Corrales, L.D.C., Lambán, M.P., Hernandez Korner, M.E., and Royo, J. (2020). Overall Equipment Effectiveness: Systematic Literature Review and Overview of Different Approaches. Appl. Sci., 10.10.3390/app10186469 ↗
4. On the Relationship between Human Factor and Overall Equipment Effectiveness (OEE): An Analysis through the Adoption of Analytic Hierarchy Process and ISO 2240010.1177/18479790231188548 ↗
5. The Optimization of Overall Equipment Effectiveness Factors in a Pharmaceutical Company10.1016/j.heliyon.2020.e03796 ↗
6. Wudhikarn, R. (2010). Overall Weighting Equipment Effectiveness. Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management, IEEE.10.1109/IEEM.2010.5674418 ↗
7. Improving Overall Equipment Cost Loss Adding Cost of Quality10.1080/00207543.2011.587841 ↗
8. Implementation of the Overall Equipment Cost Loss (OECL) Methodology for Comparison with Overall Equipment Effectiveness (OEE)10.1108/JQME-12-2011-0001 ↗
9. Schiraldi, M.M., De Carlo, F., and Fera, M. (2024). OEE Review and Compatible Weighting Approach for OEE. Advances in Performance Management and Measurement for Industrial Applications and Emerging Domains, Springer Nature.
10. Overall Equipment Effectiveness as a Measure of Operational Improvement—A Practical Analysis10.1108/01443570010355750 ↗
11. Evaluation and Improvement of Manufacturing Performance Measurement Systems—The Role of OEE10.1108/01443579910244223 ↗
12. U.S. Food and Drug Administration (2023). Current Good Manufacturing Practice for Finished Pharmaceuticals.
13. Korhonen, O. (2020). Continuous Pharmaceutical Manufacturing. Pharmaceutics, 12.10.3390/pharmaceutics12100910 ↗
14. Optimal Response under Partial Plant Shutdown with Discontinuous Dynamic Models10.1016/j.compchemeng.2015.12.011 ↗
15. Lew, D., Brinkman, G., Ibanez, E., Lefton, S.A., Kumar, N., and Agan, D. (2012). Power Plant Cycling Costs, National Renewable Energy Laboratory, U.S. Department of Energy.
16. Operational Reliability Evaluation-Based Maintenance Planning for Automotive Production Line10.1080/16843703.2019.1567664 ↗
17. Measuring Preconceived Beliefs on the Results of Overall Equipment Effectiveness—A Case Study in the Automotive Manufacturing Industry10.1108/JQME-03-2020-0016 ↗
18. A Comparative Study of Overall Equipment Effectiveness Measurement Systems10.1080/09537287.2022.2037166 ↗
19. Computing Weighted Overall Equipment Effectiveness Based on a Fuzzy Approach: A Comparative Study with an Application10.1007/s10700-025-09445-1 ↗
20. Resource Overall Equipment Cost Loss Indicator to Assess Equipment Performance and Product Cost10.1108/IJPPM-10-2021-0615 ↗
21. Anatomization of the Overall Equipment Effectiveness (OEE) for Various Machines in a Tool and Die Shop
22. Overall Equipment Effectiveness (OEE) Evaluation for an Automated Ice Cream Production Line: A Case Study10.1108/IJPPM-03-2019-0126 ↗
23. Achieving Sustainable Overall Equipment Effectiveness (OEE) in Apparel Industry With Lean and Digital Integration
24. A Rule-Based Machine Learning Methodology for the Proactive Improvement of OEE: A Real Case Study10.1108/IJQRM-01-2023-0012 ↗
25. Improving Capital Productivity through Maintenance10.1108/01443579410062167 ↗
26. Overall Equipment Effectiveness of a Manufacturing Line (OEEML): An Integrated Approach to Assess Systems Performance10.1108/17410380910925389 ↗
27. From Measuring Overall Equipment Effectiveness (OEE) to Overall Resource Effectiveness (ORE)10.1108/JQME-03-2014-0014 ↗
28. Schiraldi, M.M. (2024). Advances in Performance Management and Measurement for Industrial Applications and Emerging Domains: Proceedings of the Second Conference on Performance Management (COPERMAN), Springer. [1st ed.]. Lecture Notes in Production Engineering Series.10.1007/978-3-031-59930-9 ↗
29. Pamučar, D., Stević, Ž., and Sremac, S. (2018). A New Model for Determining Weight Coefficients of Criteria in MCDM Models: Full Consistency Method (FUCOM). Symmetry, 10.10.3390/sym10090393 ↗
30. Methods for Multiple Attribute Decision Making10.1007/978-3-642-48318-9_3 ↗