Abstract

To address the difficulty of determining the safe reserved thickness of the mining wall in the test block of the panel pillar at Tongkeng Mine, The stress of mining wall is comprehensively analyzed. Combined with numerical simulation method and field monitoring, the optimal wall thickness is determined. By differentiating each stress component, the mathematical equations governing the locations where extreme values of the stress components occur are derived, and the mathematical expressions for the extreme value positions of each stress component are further determined accordingly. Considering the geological characteristics and mining conditions of the experimental stope with panel pillars, the eastern mining wall of the test block is selected as the research object. A mining wall thickness range of 3 m to 8 m is designed, and the optimal safe reserved thickness of the mining wall is determined through numerical simulation. Based on the optimal mining wall retention thickness, stopping operations are carried out on the orebody of the experimental stope. Meanwhile, monitoring points are reasonably arranged from the upper-middle section to the middle of the mining wall, and real-time monitoring is performed on the stress variation data at each monitoring point during the entire stopping process of the test block. Theoretical analysis results show that the exact locations of the extreme values of each stress component can be accurately determined within the two-dimensional plane of the mining wall, among which the extreme value of the horizontal stress component appears at the midpoint of the mining wall thickness. Numerical simulation results indicate that both the stress and displacement of the mining wall exhibit a gradual decreasing trend with an increase in mining wall thickness. However, when the mining wall thickness exceeds 5 m, the reduction rate of stress and displacement slows down significantly, and the mining wall tends to become stable. Maintaining a mining wall thickness of 5 m in the experimental stope can generally ensure the safe recovery of the orebody. However, pronounced stress concentrations occur at the geometric corners of the mining wall, which result from stress retention caused by changes in the mining wall geometry. Meanwhile, the stress concentration in the mining wall is synchronized with that in the drilling galleries of the experimental stope, and varying degrees of failure occur in the drilling galleries at locations where stress concentration appears in the mining wall. Monitoring results show that the maximum stress borne by the drilling gallery is approximately 26 MPa, beyond which rock mass collapse and fragmentation are prone to occur.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Tailings Management and Properties · Rock Mechanics and Modeling · Geomechanics and Mining Engineering

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

School of Resources, Environment and Safety Engineering, Hunan University of Science and Technology, Xiangtan 411201, China

Changsha Institute of Mining Research Co., Ltd., Changsha 410012, China

Tongkeng Mining Branch, Guangxi Huaxi Mining Co., Ltd., Hechi 547207, China

Department of Engineering Mechanics, Shijiazhuang Tiedao University, Shijiazhuang 050043, China

Funding

State Key Laboratory Special Programs of China Minmetals Corporation · National Key Research and Development Program of China · Youth Science and Technology Fund of China Minmetals Corporation

References (36)

Show source-provided references
1. Innovation effectiveness analysis and technology management reflection of deep resource exploitation
2. Study on multi-pillar bearing and instability failure in metal mines
3. Development Strategy for Multi Field Intelligent Mining of Deep Metal Mines by 2035
4. Stope Structural Parameters of Panel Isolation Pillar Numerical Optimization
5. Reasonable Width Calculation and Analysis of Artificial Pillar in Deep Mining
6. Experimental study on failure mechanism and bearing characteristic of double-pillar system
7. Optimization research on stope structure parameters in broken rock conditions based on the response surface method
8. 3D Numerical Analysis for Effect of Mechanical Properties on Failure Process of Serial and Parallel Rock Pillar System
9. Mohr’s circle analysis and numerical simulation of stress state of pillar under combined compression-shear loading
10. Overburden failure characteristics and fracture evolution rule under repeated mining with multiple key strata control10.1038/s41598-025-14068-y ↗
11. Analysis of catastrophe theory for artificial pillar instability in symmetric synergistic mining
12. Numerical simulation and optimization of recovery scheme for residual ore pillars
13. Design and construction of entry retaining wall along a gob side under hard roof stratum10.1016/j.ijrmms.2015.03.025 ↗
14. Study on the damage characteristics of mining pillars caused by blasting in deep buried ore bodies
15. Evaluation of the use of sublevel open stoping in the mining of moderately dipping medium-thick orebodies10.1016/j.ijmst.2020.12.002 ↗
16. Mining-Induced Surrounding Rock Instability and Surface Subsidence Based on Combination of In-situ Monitoring and Numerical Modelling
17. Stability of workface using long-wall mining method in extremely thin and gently inclined iron mine10.1016/j.ssci.2011.09.001 ↗
18. Analytical expression for vertical stress within an inclined mine stope with non-parallel walls10.1007/s10706-014-9735-x ↗
19. Subsidence prediction method of solid backfilling mining with different filling ratios under thick unconsolidated layers10.1007/s12517-017-3303-7 ↗
20. Microseismicity and focal mechanism of blasting-induced block falling of intersecting chamber of large underground cavern under high geostress10.1007/s11771-023-5259-y ↗
21. Coal pillar load calculation by pressure arch theory and near field extraction ratio10.1016/j.ijrmms.2010.06.011 ↗
22. Research on coal pillar width in roadway driving along goaf based on the stability of key block
23. Dynamic response of pillar workings induced by sudden pillar recovery10.1007/s00603-018-1505-2 ↗
24. Study on the mechanics and micro/macroeconomics of multiple strip-Shaped pillar recovery
25. Research and application on strength model of cemented backfill pillar for stage subsequent filling mining method
26. The reliability of temporary mining wall structure
27. Stability analysis and parameter optimization of temporary mining wall based on FLAC3D
28. Stability analysis of horizontal insulating pillar in deep mining from caving to filling method on the basis of refined plate theory
29. Buckling failures of reserved thin pillars under the combined action of in-plane and lateral hydrostatic compressive forces10.1016/j.compgeo.2017.02.013 ↗
30. Instability mechanism of pillar burst in asymmetric mining based on cusp catastrophe model10.1007/s00603-020-02313-x ↗
31. Study on instability mechanism and thickness optimization of temporary mining wall based on cusp catastrophe model
32. Stability analysis model of mining wall based on elastic thin plate theory and its application
33. Optimization study on the size of strip pillars in the upper chamber of large-span mining sites
34. Numerical analysis of block caving-induced instability in large open pit slopes: A finite element/discrete element approach10.1007/s00603-009-0035-3 ↗
35. Xu, Z.L. (2013). Mechanics of Elasticity, Higher Education Press.
36. Stress analysis of isolated pillar stope wall under multi-directional load