Abstract

To address the limitations of existing subsidence control technologies in coal mining, this study systematically investigates the fundamental principles of cut-and-fill mining, the stability mechanism of the filling body, and the influence law of key parameters on mining engineering effects, through a comprehensive research framework integrating theoretical analysis, similar material simulation and numerical simulation. Firstly, the mechanical characteristics of horizontal and diagonal shear failure of gangue pillars are revealed via theoretical derivation. It is clarified that the diagonal stability of the gangue pillar can be guaranteed when its aspect ratio is ≤0.5, and the lateral constraint of metal mesh can effectively enhance its horizontal stability. Secondly, based on a physical model with a size similarity ratio of 1:100, the overburden failure characteristics are obtained: only local cracks appear in the immediate roof and the basic roof presents gentle subsidence after cut-and-fill mining, which directly verifies the effective control effect of this technology on mining-induced overburden movement and surface subsidence. On this basis, multiple sets of orthogonal tests are designed using FLAC3D software (5.0) to analyze the effects of roof cutting width, filling width and coal seam thickness on roof displacement and filling area stress. Combined with grey correlation analysis, it is determined that coal seam thickness is the most critical factor affecting the mining effect, with the correlation coefficients for roof displacement and filling area stress reaching 0.79 and 0.93, respectively. The research shows that the parameter combination of 10 m roof cutting width + 10 m filling width (Group 10-10-X) can achieve the optimal balance between subsidence control efficiency and filling engineering benefit; for working faces with higher requirements for surface subsidence control, the combination of 5 m roof cutting width + 10 m filling width is recommended. The research results clarify the action mechanism of cut-and-fill mining, optimize the key engineering parameters, and provide a solid theoretical basis and technical support for the engineering popularization of this technology and high-precision surface subsidence control.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Rock Mechanics and Modeling · Geomechanics and Mining Engineering · Tailings Management and Properties

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

State Grid Energy Hami Coal Power Co., Ltd., Dananhu No. 1 Mine, Hami 839000, China

School of Civil Engineering and Architecture, Shandong University of Science and Technology, Qingdao 266590, China

School of Safety Science and Engineering, Anhui University of Science and Technology, Huainan 232000, China

Funding

National Natural Science Foundation of China

References (40)

Show source-provided references
1. Trapezoidal Failure Behavior and Fracture Evolution Mechanism of Overburden in Extra-thick Coal Mining in Weakly Cemented Strata10.1007/s00603-024-04147-3 ↗
2. High-intensity longwall mining-induced ground subsidence in Shendong coalfield, China10.1016/j.ijrmms.2021.104730 ↗
3. Basic theory of constructional backfill mining and the underground space utilization concept
4. Rock fracturing mechanisms around underground openings
5. Remediation and monitoring of abandoned mines10.1016/j.ijmst.2017.07.026 ↗
6. Lin, H., Yang, Y., Chen, C., and Ding, C. (2024). Influence of Mining Sequence of Branch on Stope Pressure Behaviour on Continuous Mining and Continuous Backfilling. Processes, 12.10.3390/pr12030442 ↗
7. Zhang, T., Wang, H., Zheng, X., and Gao, S. (2024). Axial Compressive Behaviours of Coal Gangue Concrete-Filled Circular Steel Tubular Stub Columns after Chloride Salt Corrosion. Materials, 17.10.3390/ma17112782 ↗
8. Huang, W., Song, T., Li, H., Liu, Y., Hou, T., Gao, M., and Zheng, Y. (2023). Design of Key Parameters for Strip-Filling Structures Using Cemented Gangue in Goaf-A Case Study. Sustainability, 15.10.3390/su15064698 ↗
9. Methane and radon anomaly characteristics derived based on the microleakage mechanism and their implications for the exploration of hidden disaster-causing factors in coal mines
10. Impact of Micro-NPR bolt on the mining of deep-buried phosphate via the room-and-pillar method10.1016/j.tust.2023.105326 ↗
11. Subsidence over room and pillar retreat mining in a low coal seam10.1016/j.ijmst.2018.11.022 ↗
12. Bearing Capacity of Backfill Body and Roof Stability During Strip Coal Pillar Extracted with Paste Backfill10.1007/s10706-017-0322-9 ↗
13. Enhancing the mechanical performance of slag-based cemented paste backfill with alunite: Effects of calcination temperature and dosage
14. Case study on coal-based solid waste utilization in backfill paste: Hydration mechanism and performance analysis
15. Longwall surface subsidence control by technology of isolated overburden grout injection10.1016/j.ijmst.2017.07.014 ↗
16. Borehole Investigation of the Effectiveness of Grout Injection Technology on Coal Mine Subsidence Control10.1007/s00603-015-0710-5 ↗
17. Investigation of overburden behaviour for grout injection to control mine subsidence10.1016/j.ijmst.2014.03.005 ↗
18. Compression characteristics of filling gangue and simulation of mining with gangue backfilling: An experimental investigation
19. Compaction behavior and residual height ratio of crushed coal gangue under varying support conditions: Experimental analysis and model comparison10.1016/j.powtec.2025.120970 ↗
20. Integrated green mining technology of coal mining-gangue washing-backfilling-strata control-system monitoring-taking Tangshan Mine as a case study10.1007/s11356-021-16083-8 ↗
21. Zhang, Q., Yang, K., Zhang, J., Wang, Q., Yuan, L., Shi, Z., and Xu, X. (2022). A Theoretical Model of Roof Self-Stability in Solid Backfilling Mining and Its Engineering Verification. Appl. Sci., 12.10.3390/app122312114 ↗
22. Hu, J., Meng, Z., Gao, T., Dong, S., Ni, P., Li, Z., Yang, W., and Wang, K. (2024). Optimization of Proportions of Alkali-Activated Slag–Fly Ash-Based Cemented Tailings Backfill and Its Strength Characteristics and Microstructure under Combined Action of Dry–Wet and Freeze–Thaw Cycles. Materials, 17.10.3390/ma17204945 ↗
23. Lu, H., and Qi, S. (2022). Preparation and Strength Formation Mechanism of Calcined Oyster Shell, Red Mud, Slag, and Iron Tailing Composite Cemented Paste Backfill. Materials, 15.10.3390/ma15062199 ↗
24. Zhao, Y., Yang, Y., Wang, Z., Gu, Q., Wei, S., Li, X., and Wang, C. (2025). Innovative Cut-and-fill Mining Method for Controlled Surface Subsidence and Resourceful Utilization of Coal Gangue. Minerals, 15.10.3390/min15020146 ↗
25. Zhou, Y., Wang, C., Liao, C., Wang, J., and Zhang, B. (2024). Study on the Mining Effect and Optimal Design of Longwall Full Mining with Paste Partial Filling. Minerals, 14.10.3390/min14030264 ↗
26. Study on filling mining technology analysis and optimization measures in Jiangjiadun Mine
27. Overlying strata movement rules and safety mining technology for the shallow depth seam proximity beneath a room mining goaf10.1016/j.ijmst.2014.12.007 ↗
28. Field investigation of long-term bearing capacity of strip coal pillars10.1016/j.ijrmms.2014.02.022 ↗
29. Zhang, N., Cao, A., Zhao, W., Hao, Q., Lv, G., and Wu, B. (2024). Layout Pattern of Small Panel and Large Coal Pillar for Rockburst Prevention and Water Control under Extra-Thick Water-Bearing Key Strata. Appl. Sci., 14.10.3390/app14052195 ↗
30. New Viewpoint of Foundation Stability of Newly Building upon Goaf10.1016/j.egypro.2012.02.303 ↗
31. The height of fractured water-conducting zone in undermined rock strata10.1016/j.enggeo.2011.03.009 ↗
32. Failure law of floor during strip mining backfill with paste-tailings over confined aquifer: A case study in China mine
33. Similar simulation of overburden movement characteristics under paste filling mining conditions10.1038/s41598-023-39782-3 ↗
34. Wu, Q., Wu, Q., Xue, Y., Kong, P., and Gong, B. (2018). Analysis of Overlying Strata Movement and Disaster-Causing Effects of Coal Mining Face under the Action of Hard Thick Magmatic Rock. Processes, 6.10.3390/pr6090150 ↗
35. Su, X. (2013). Research on the Concrete Durability Due to Salinized Soilin the Western Region of Jilin Province. [Ph.D. Thesis, Jilin University].
36. Xu, J., Luo, Q., Tang, Y., Zeng, Z., and Liao, J. (2024). Experimental Study and Application of Controlled Low-Strength Materials in Trench Backfilling in Suqian City, China. Materials, 17.10.3390/ma17040775 ↗
37. Ground control by L-shaped cemented paste backfilling technology in underground coal seam mining: A case study10.1007/s40948-024-00758-w ↗
38. Feasibility and challenges of multi-source coal-based solid waste (CSW) for underground backfilling—A case study10.1016/j.psep.2023.11.013 ↗
39. Influence of backfilling rate on the stability of the backfilling body-immediate roof cooperative bearing structure10.1016/j.ijmst.2022.09.003 ↗