journal article·2025-12-30Open access

A Novel Method for Determining the Optimal Transition Point from Surface to Underground Exploitation of Dimension Stone

Branimir Farkaš, Ana Hrastov, Siniša Stanković

Applied Sciences· Volume 16· Issue 1

Abstract

This paper introduces a novel method for determining the optimal exploitation contour, that is, the point of transition from surface to underground exploitation of dimension stone. Exploitation of dimension stone is primarily carried out using surface mining from the main plateau, but it can also be done by underground or combined methods. The decision regarding the mining method—surface, underground, or combined—is made before mining operations commence. This occurs during preliminary, pre-investment, and investment studies. The choice of mining method primarily depends on natural, technological, environmental, and economic factors, which together form a group referred to as techno-economic factors that influence the decision in varying proportions. Using the novel method for comparing techno-economic factors, the optimal transition point (OTP) from surface to underground exploitation of dimension stone deposits was determined. The position of the OTP from surface to underground mining of dimension stone is not a constant value; it changes over time and space according to techno-economic factors.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Mining Techniques and Economics · Mining and Gasification Technologies · Tailings Management and Properties

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Faculty of Mining, Geology and Petroleum Engineering, Department of Mining Engineering and Geotechnics, Pierottijeva 6, 10000 Zagreb, Croatia

RUDAR PROJEKT Ltd., Pakoštanska 5, 10000 Zagreb, Croatia

References (52)

Show source-provided references
1. A literature review of Multi Criteria Decision-Making (MCDM) towards mining method selection (MMS)10.1016/j.resourpol.2022.102676 ↗
2. Review on the Development of Mining Method Selection to Identify New Techniques Using a Cascade-Forward Backpropagation Neural Network10.1155/2022/6952492 ↗
3. Farkaš, B., and Hrastov, A. (2021). Multi-Criteria Analysis for the Selection of the Optimal Mining Design Solution—A Case Study on Quarry “Tambura”. Energies, 14.10.3390/en14113200 ↗
4. Selection of the optimal technology for surface mining by multi–criteria analysis
5. Mining method selection for extracting moderately deep ore body using analytical hierarchy process at mindola sub- vertical shaft, Zambia10.1080/23311916.2022.2062877 ↗
6. Shahriar, K., Kazem, O., and Ezzeddin, B. (2007, January 11–15). Effective factors investigation in choice between surface and underground mining. Proceedings of the 7th International Scientific Conference Modern Management of Mine Producing, Geology and Environmental Protection (SGEM 2007), Sofia, Bulgaria.
7. Determining the environmental costs of mining projects: A comprehensive quantitative assessment10.1016/j.resourpol.2023.103561 ↗
8. Transition from open pit coal mine to the underground mine in soft rocks
9. A mixed integer linear programming framework for optimising the extraction strategy of open pit–underground mining options and transitions10.1080/17480930.2019.1701968 ↗
10. Qian, Q., and Zhou, Y. (2011, January 16). Design of Room & pillar exploitations of non–expensive minerals and ornamental rocks in Spain. Proceedings of the 12th ISRM International Congress on Rock Mechanics, Beijing, China.
11. Arvantides, N., and Heldal, T. (2024, November 14). State–of–the–Art: Ornamental Stone Quarrying in Europe. Available online: https://static.ngu.no/filearchive/91/OSNET3.pdf.
12. Geotechnological potential for surface and underground mining of Kuzbass coal deposits
13. Bakhtavar, E., and Shahriar, K. (2007, January 30–31). Optimal ultimate pit depth considering an underground alternative. Proceedings of the 4th AACHEN International Mining Symposia–High Performance Mine Production, Aachen, Germany.
14. Resource Extraction Evaluation Using a Mathematical Programming Framework for Surface-Underground Mining Options and Transitions Optimization
15. Optimizing transition: Investigating the influence of operational parameters on production scheduling optimization for mines transitioning from open pit to block caving methods10.1007/s11081-024-09927-y ↗
16. Globally optimising open-pit and underground mining operations under geological uncertainty10.1179/1743286315Y.0000000027 ↗
17. Popović, N. (1984). Naučne Osnove Projektovanja Površinskih Kopova (Scientific Basics of Surface Mine Planning), Veselin Masleša. [2nd ed.].
18. Dimitrakopoulos, R. (2018). Stochastic Mine Planning—Methods, Examples and Value in an UnceRtain World. Advances in Applied Strategic Mine Planning, Springer International Publishing.10.1007/978-3-319-69320-0 ↗
19. Design and planning for slate mining using optimisation algorithms10.1016/j.enggeo.2003.12.002 ↗
20. Bakhtavar, E., Shahriar, K., Oraee, K., and Flett, P. (March, January 28). Economico–Mathematical Analysis of Transition from Open–Pit to Under-ground Mining. Proceedings of the Annual Meeting and Exhibit 2010, Phoenix, AZ, USA.
21. Stochastic modelling of the open pit to underground transition interface for gold mines10.1080/17480930.2013.795341 ↗
22. Project optimisation10.1590/0370-44672015680018 ↗
23. A stochastic mathematical model for determination of transition time in the non-simultaneous case of surface and underground mining10.17159/2411-9717/2017/v117n12a9 ↗
24. Incorporation price uncertainty into open-pit to underground mine transition10.1007/s13563-023-00408-9 ↗
25. Optimization of transition from open-pit to underground mining considering environmental costs10.1016/j.resourpol.2024.105178 ↗
26. Mining method selection and optimisation of transition from open pit to underground in combined mining
27. Optimizing the open pit-to-underground mining transition10.1016/j.ejor.2016.07.021 ↗
28. Timing of transition from open-pit to underground mining: A simultaneous optimisation model for open-pit and underground mine production schedules10.1016/j.resourpol.2022.102632 ↗
29. A stochastic optimisation formulation for the transition from open pit to underground mining10.1007/s11081-017-9361-6 ↗
30. A stochastic mine planning approach to determine the optimal open pit to underground mining transition depth–case study at the Geita gold mine, Tanzania10.1080/25726668.2022.2072559 ↗
31. Numerical Simulation of Crown Pillar Behaviour in Transition from Open Pit to Underground Mining10.1007/s10706-021-02022-4 ↗
32. Zhang, Q., Zhang, B., Chen, Q., Wang, D., and Gao, X. (2021). Safety Analysis of Synergetic Operation of Backfilling the Open Pit Using Tailings and Excavating the Ore Deposit Underground. Minerals, 11.10.3390/min11080818 ↗
33. Optimization of open pit to underground transition depth: An idea for reducing waste rock contamination while maximizing economic benefits10.1016/j.jclepro.2020.123530 ↗
34. Evaluating the impacts of the transition from open-pit to underground mining on sustainable development indexes10.46873/2300-3960.1382 ↗
35. A Review of Models and Algorithms for Surface-Underground Mining Options and Transitions Optimization: Some Lessons Learnt and the Way Forward10.3390/mining1010008 ↗
36. Ross, I., and Stewart, C. (2020, January 9–11). Issues with transitioning from open pits to underground caving mines. Proceedings of the MassMin 2020: Eighth International Conference & Exhibition on Mass Mining, Santiago, Chile.10.36487/ACG_repo/2063_11 ↗
37. Hamman, E., Cowan, M., Venter, J., and de Souza, J. (2020, January 12–14). Considerations for open pit to underground transition interaction. Proceedings of the 2020 International Symposium on Slope Stability in Open Pit Mining and Civil Engineering, Perth, Australia.10.36487/ACG_repo/2025_74 ↗
38. Mehtap, K.G., Önel, Ö., Başarir, H., Karadeniz, M., and Bilgiç, E.T. (2005, January 14–17). Numerical modelling of the influence of coefficient of utilization on the exploitation profita-bility of dimension stone deposit. Proceedings of the 24th International Mining Congress and Exhibition International Mining Congress and Exhibition, Antalya, Turkey. Available online: https://api2.maden.org.tr/uploads/portal/resimler/ekler/bb17a0e751d1d74_ek.pdf.
39. The profitability of dimension stone deposit exploitation in relation to the coefficient of utilization
40. Mapping and modelling fractures using ground penetrating radar for ornamental stone assessment and recovery optimization: Two case studies
41. Joint analysis as an important tool for an optimizing block extraction of natural stones
42. Siegesmund, S., and Török, Á. (2019). Building Stones. Stone in Architecture: Properties, Durability, Springer. Chapter 2.
43. Tatiya, R.R. (2005). Surface and Underground Excavations, Taylor & Francis.10.1201/9781439834220 ↗
44. Dragičević, I., Galić, I., Pavičić, I., and Deljak, G. (2015). Elaborat o Rezervama Arhitektonsko–Građevnog Kamena u Istražnom Prostoru “Crvene Stijene” (Report on the Reserves of Dimension Stone in the Exploration Area “Red Rocks”), GEOECO–ING d.o.o.
45. (OpenRoads Designer, 2024). OpenRoads Designer, version 24.00.02.25.
46. (Google Earth Pro, 2024). Google Earth Pro, version 10.88.0.3.
47. (2024, August 31). gINT Professional, Bentley Systems Inc. Available online: www.bentley.com.
48. High safety pillars design for underground excavation of natural stone blocks10.5897/JCECT12.054 ↗
49. Stability Assessment of the High Safety Pillars in Slovenian Natural Stone Mines/Ocena Stabilności Wysokich Filarów Bezpieczeństwa w Kopalniach Kamieni Naturalnych w Słowenii
50. Hustruild, W.A., and Bullock, R.L. (2001). Cost estimating for underground mines. Underground Mining Methods: Engineering Fundamentals and International Case Studies, Society for Mining, Metallurgy and Exploration, Inc.
51. Toderas, M. (2024). Stability Analysis of the Exploitation System with Room and Pillar by Analytical Methods. Appl. Sci., 14.10.3390/app14051827 ↗
52. Analiza troškova površinskog i podzemnog vadenja blokova prirodnog kamena u kame-nolomu Hotavlje l