Model for Optimizing Waste-Haulage Systems in Open-Pit Mines (Trucks vs. IPCC System)

Ali Nasirinezhad, Dejan Stevanovic, Daniel Krzanovic, Mehdi Rahmanpour

Applied Sciences· Volume 15· Issue 24

Abstract

Waste haulage represents one of the most critical and cost-intensive operations in surface mining, accounting for up to 50% of the total operating costs. Under such operating conditions, the implementation of continuous systems such as In-Pit Crushing and Conveying (IPCC) is an alternative to truck haulage, as it demonstrates a higher degree of economic efficiency. In a theoretical and practical sense, due to its direct impact on the extraction plan, defining the optimal position of the crusher and consequently the system of conveyors is often the most challenging problem of this methodology. This paper introduces an innovative approach to determining the optimum waste haulage configuration by comparing conventional truck-based transport with IPCC systems. The model is formulated as a Mixed-Integer Linear Programming (MILP) problem, explicitly incorporating spatial dimensions and the relocation costs of semi-mobile crushers. The model situates the crusher in a way that reduces transfer costs throughout production periods and it has been tested on a hypothetical open pit.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Mining Techniques and Economics · Belt Conveyor Systems Engineering · Mineral Processing and Grinding

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia

Mining and Metallurgy Institute Bor, 19210 Bor, Serbia

School of Mining Engineering, University of Tehran, Tehran 1439957131, Iran

References (54)

Show source-provided references
1. Hartman, H.J.N.J. (1987). Introductory Mining Engineering, John Wiley & Sons.
2. In-pit crushing and conveying technology in open-pit mining operations: A literature review and research agenda10.1080/17480930.2019.1565054 ↗
3. In-pit crusher location as a dynamic location problem10.17159/2411-9717/2017/v117n6a11 ↗
4. Czaplicki, J.M. (2008). Shovel-Truck Systems: Modelling. Analysis and Calculations, CRC Press.10.1201/9780203881248 ↗
5. Zimmermann, E., and Kruse, W. (2006, January 24–27). Mobile crushing and conveying in quarries—A chance for better and cheaper production!. Proceedings of the 8th International Symposium Continuous Surface Mining, Aachen, Germany.
6. Different types of belt conveyors and their applications in surface mines10.1142/S0950609897000188 ↗
7. Nasirinezhad, A., Stevanović, D., Gnjatović, D., and Markovic, P. (2021, January 22–25). Overview of in-pit crushing & conveying technology in open pit mines. Proceedings of the 8th International Conference Mining and Environmental Protection, Sokobanja, Serbia.
8. Koehler, F. (2003, January 23–25). In-Pit Crushing System the Future Mining Option. Proceedings of the Twelfth International Symposium on Mine Planning and Equipment Selection, Kalgoorie, Australia. Australasian Institute of Mining and Metallurgy Publication Series.
9. Energy consumption in open-pit mining operations relying on reduced energy consumption for haulage using in-pit crusher systems10.1016/j.jclepro.2020.125228 ↗
10. Comparative economic analysis of transportation systems in surface coal mines10.1080/09208119108944282 ↗
11. Schroder, D.L. (2003, January 8–11). The use of in-pit crushing and conveying methods to significantly reduce transportation costs by truck. Proceedings of the Coaltrans Asia Confererence, Bali, Indonesia.
12. Cost analysis of material handling systems in open pit mining: Case study on an iron ore prefeasibility study10.1080/0013791X.2016.1253810 ↗
13. In-pit crushing and conveyor transportation of coal at Ulan
14. In-pit crushing and conveying reduces haulage costs
15. Valeri, S., Pastikhin, D., Radchenko, S., and Agafonov, Y. (2015). Problems and prospects of cyclic-and-continuous technology in development of large ore-and coalfields. Proceedings of the 12th International Symposium Continuous Surface Mining-Aachen 2014, Springer International Publishing.
16. The greenhouse gas impact of IPCC and ore-sorting technologies10.1016/j.mineng.2012.11.012 ↗
17. Evaluation of belt conveyor and truck haulage systems in an open pit mine using life cycle assessment
18. A comparison of the energy consumption and carbon emissions for different modes of transportation in open-cut coal mines10.1016/j.ijmst.2015.02.015 ↗
19. A comparative life cycle assessment of material handling systems for sustainable mining10.1016/j.jenvman.2016.03.011 ↗
20. Evaluation of safety and social indexes in the selection of transportation system alternatives (Truck-Shovel and IPCCs) in open pit mines10.1016/j.ssci.2018.04.020 ↗
21. Hays, R. (1983). Mine planning considerations for in-pit crushing and conveying systems. SME Mini Symp., 33–41.
22. Plattner, J. (1986). History and design of mobile in-pit crushers for open-pit mines. Large Open Pit Mining Conference, Australasian Institute of Mining and Metallurgy.
23. Kutschera, S. (1986). Continuous mining and transport of medium-hard materials in opencast mines. Mining Latin America/Minería Latinoamericana, Springer.10.1007/978-94-017-2286-5_19 ↗
24. Steep-angle conveyor for bulky run-of-mine ore
25. Morrison, D. (2007, January 20–22). The use of continuous materials handling equipment in an open cut iron ore mine. In Proceedings of Iron Ore Conference 2007, Perth, Australia.
26. Key production drivers in in-pit crushing and conveying (IPCC) studies
27. Latest IPCC systems provide improved operational flexibility, higher capacity
28. Atchison, T., and Morrison, D. (2011, January 11–13). In-pit crushing and conveying bench operations. Proceedings of the Tenth Iron Ore Conference, Perth, Australia.
29. In-Pit Crushing Considerations for Conveying and Materials Handling Systems
30. Dzakpata, I., Knights, P., Kizil, M.S., Nehring, M., and Aminossadati, S.M. (2016, January 10–12). Truck and Shovel Versus In-Pit Conveyor Systems: A Comparison of the Valuable Operating Time. Proceedings of the 16th Coal operators’ Conference, Wollongong, Australia.
31. Paricheh, M., and Osanloo, M. (2019). How to exit conveyor from an open-pit mine: A theoretical approach. Proceedings of the 27th International Symposium on Mine Planning and Equipment Selection-MPES 2018, Springer.10.1007/978-3-319-99220-4_26 ↗
32. Evaluating crusher system location in an open pit mine using Markov chains10.1080/17480930.2015.1105649 ↗
33. How to determine the optimum location of in-pit movable crushers
34. Computer simulation of a semi-continuous open-pit mine haulage system
35. Changzhi, Y. (2003, January 3–5). In-pit crushing and conveying system and Dexin pit copper haulage optimisation for ore transport. Proceedings of the Fifth Large Open Pit Mining Conference, Kalgoorlie, Australia.
36. Selection of the optimum in-pit crusher location for an aggregate producer
37. Taheri, M., and Irannajad, M. (2009, January 14–19). An approach to determine the locations of in-pit crushers in deep open-pit mines. Proceedings of the 9th International Multidisciplinary Scientific GeoConference of Modern Management of Mine Producing, Geology and Environmental Protection (SGEM 2009), Albena, Bulgaria.
38. Modelling of in-pit crusher conveyor alternatives10.1179/1743286313Y.0000000048 ↗
39. The optimal location of the distribution point of the belt conveyor system in continuous surface mining operations10.1016/j.simpat.2014.04.006 ↗
40. Paricheh, M., and Osanloo, M. (2016, January 5–7). Determination of the optimum in-pit crusher location in open-pit mining under production and operating cost uncertainties. Proceedings of the 6th International Conference on Computer Applications in the Minerals Industries, Istanbul, Turkey.
41. Samavati, M., ESSam, D.L., Nehring, M., and Sarker, R. (2018). Open-pit mine production planning and scheduling: A research agenda. Data and Decision Sciences in Action: Proceedings of the Australian Society for Operations Research Conference 2016, Springer.10.1007/978-3-319-55914-8_16 ↗
42. A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems10.1016/j.ijmst.2017.12.026 ↗
43. Optimum location and relocation plan of semi-mobile in-pit crushing and conveying systems in open-pit mines by transportation problem10.1080/17480930.2018.1435968 ↗
44. Production planning and scheduling in mining scenarios under IPCC mining systems10.1016/j.cor.2019.05.019 ↗
45. Lonergan, J. (1985, January 16–18). Computer-assisted layout of in-pit crushing/conveying systems. Proceedings of the SME-AIME Fall Meeting, Albuquerque, NM, USA.
46. Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying10.1080/17480930.2021.1996983 ↗
47. Determination of the optimal transition point between a truck and shovel system and a semi-mobile in-pit crushing and conveying system
48. An Approach to Locate an in Pit Crusher in Open Pit Mines
49. Ritter, R. (2025, December 05). Contribution to the Capacity Determination of Semi-Mobile In-Pit Crushing and Conveying Systems. Available online: https://tubaf.qucosa.de/api/qucosa%3A23098/attachment/ATT-0/.
50. Concurrent open-pit mine production and in-pit crushing–conveying system planning10.1080/0305215X.2019.1678150 ↗
51. A framework for open-pit mine production scheduling under semi-mobile in-pit crushing and conveying systems with the high-angle conveyor10.3390/mining1010005 ↗
52. Semi-mobile in-pit crushing and conveying vs. truck-shovel systems: Long-term scheduling with road and conveyor networks integration10.1016/j.eswa.2024.126122 ↗
53. Enhancing sustainability in mining by reducing hauling energy consumption through optimization of distance and slope with semi-mobile in-pit crushers and conveyors10.1038/s41598-025-06534-4 ↗
54. Farahani, R.Z., and Hekmatfar, M. (2009). Facility Location: Concepts, Models, Algorithms and Case Studies, Springer Science & Business Media.