journal article·2025-10-10Open access

Deformation of Existing Highway Induced by Close Undercrossing of Shield Tunnel with Steep Slope: A Case Study

Chaojun Mao, Quanfeng Wang, Jinlong Wang, Fei Sha, Hui Yao, Fanghao Liu

Applied Sciences· Volume 15· Issue 20

Abstract

As Earth Pressure Balance (EPB) shield machine crossed with steep slopes beneath an existing highway in sandstone–mudstone alternating strata, case studies of changes in vertical displacement, settlement trough evolution, and tunnel stress induced by shield tunnel construction were investigated. The quality of synchronous grouting was evaluated using ground penetrating radar (GPR) technology. The results showed that highway settlement could be categorized into four stages: initial settlement, uplift, secondary settlement, and stabilization. The secondary settlement caused by shield tail detachment was significantly greater than the initial settlement induced by distant shield construction. The settlement trough evolved throughout construction; the maximum settlement point shifted from the tunnel centerline but it consistently remained within 3 m. During the early phase of shield tail detachment, the circumferential stress of shield tunnel changed rapidly. The circumferential stress was primarily compressive, tensile stress was observed at some monitoring points. The tensile stress at the monitoring points gradually transitioned to compressive stress. After the tunnel undercrossed, the circumferential stress gradually stabilized. The GPR detection revealed that in groundwater-rich strata, poor grouting quality areas were prone to appear at the tunnel crown, while grouting quality in other areas performed better. This engineering case can serve as a positive reference for similar EPB shield tunnels passing in close proximity beneath existing highways.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Geotechnical Engineering and Analysis · Civil and Geotechnical Engineering Research · Geotechnical Engineering and Underground Structures

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

China First Highway Engineering Co., Ltd., Beijing 100024, China

College of Engineering, Ocean University of China, Qingdao 266404, China

Chongqing Railway Group Co., Ltd., Chongqing 400020, China

Funding

National Natural Science Foundation of China · Shandong Provincial Youth Innovation Science and Technology Support Program · Opening Project of Tunnel and Underground Engineering Research Center of Jiangsu Province · Young Talent Program of Ocean University of China

References (33)

Show source-provided references
1. Shallow tunnelling method (STM) for subway station construction in soft ground10.1016/j.tust.2011.12.007 ↗
2. Shallow tunnel construction with irregular surface topography using cross diaphragm method10.1016/j.tust.2017.05.015 ↗
3. Surface settlement of subway station construction using pile-beam-arch approach10.1016/j.tust.2019.05.016 ↗
4. Study on influence of construction process of double-line shield tunnels on frame structure10.1007/s10706-020-01569-y ↗
5. Multistage regulation strategy as a tool to control the vertical displacement of railway tracks placed over the building site of two overlapped shield tunnels10.1016/j.tust.2018.09.040 ↗
6. Influence of large-diameter shield tunneling on deformation of adjacent high-speed railway subgrade in soft soils and effectiveness of protective measures10.1016/j.tust.2024.106260 ↗
7. Deformation behaviors of existing tunnels caused by shield tunneling undercrossing with oblique angle10.1016/j.tust.2019.03.021 ↗
8. Settlement behaviors of existing tunnel caused by obliquely under-crossing shield tunneling in close proximity with small intersection angle10.1016/j.tust.2019.103258 ↗
9. Deformation characteristics of existing tunnels induced by above-crossing quasi-rectangular shield tunnel10.1016/j.trgeo.2024.101227 ↗
10. Responses of pipeline to side-by-side twin tunnelling at different depths: 3D centrifuge tests and numerical modelling10.1016/j.tust.2017.04.006 ↗
11. Mechanical behaviors and soil gap formation of existing pipeline based on large-deformation theory10.1061/IJGNAI.GMENG-8436 ↗
12. Zhao, Q., Li, K., Cao, P., Liu, Y., Pang, Y., and Liu, J. (2023). A study on the influence of double tunnel excavations on the settlement deformation of flood control dikes. Sustainability, 15.10.3390/su151612461 ↗
13. Numerical Simulation of Flood Control Levee Deformation by Shield Tunnel Excavation through the Liuyang River: A Case Study10.1155/2023/8925891 ↗
14. A case history of shield tunnel crossing through group pile foundation of a road bridge with pile underpinning technologies in Shanghai10.1016/j.tust.2014.09.002 ↗
15. 3D simulation for tunnelling effects on existing piles10.1016/j.compgeo.2020.103625 ↗
16. Horizontal response of existing pile induced by adjacent shield tunnelling with large longitudinal slope10.1016/j.tust.2024.106036 ↗
17. Effects of tunneling-induced ground movements on stability of piled raft foundation: Three-dimensional finite-element approach10.1061/(ASCE)GM.1943-5622.0001726 ↗
18. Analysis of stratum settlement laws caused by the construction of shallow-buried expressway tunnels with large span and small spacing10.1007/s10706-020-01570-5 ↗
19. Deformation characteristics and safety assessment of a high-speed railway induced by undercutting metro tunnel excavation10.1016/j.jrmge.2018.04.014 ↗
20. Physics-Informed Neural Network (PINN) model for predicting subgrade settlement induced by shield tunnelling beneath an existing railway subgrade10.1016/j.trgeo.2024.101409 ↗
21. Song, M., Liu, J., Wang, X., Lou, H., and Lin, X. (2022). Study on railway subgrade settlement induced by an ultra-large-diameter shield tunnel crossing under railway subgrade. Symmetry, 15.10.3390/sym15010075 ↗
22. Effect of nearby undercrossing tunneling on the deformation of existing metro tunnel and construction control
23. Study on the influence of close distance construction of urban tunnel on the existing station10.1007/s10706-021-01790-3 ↗
24. Impact analysis for safety prevention and control of special-shaped shield construction closely crossing multiple operational metro tunnels in shallow overburden10.1007/s10706-021-02016-2 ↗
25. Analysis of experimental data on the effect of double-line parallel shield tunneling on the deformation of adjacent buildings10.1016/j.aej.2021.02.034 ↗
26. Response of a double-decked metro tunnel to shield driving of twin closely under-crossing tunnels10.1016/j.tust.2011.08.005 ↗
27. Evaluation of the antenna parameters for inspection of hidden defects behind a reinforced shield tunnel using GPR10.1016/j.tust.2023.105265 ↗
28. Structural analysis of shield machine cutting monopile using py curve based finite element method10.1016/j.compgeo.2023.105605 ↗
29. Greenfield ground response to EPBM tunnelling in London Clay10.1680/geot.12.P.154 ↗
30. Soil consolidation associated with grouting during shield tunnelling in soft clayey ground10.1680/geot.2001.51.10.835 ↗
31. Void detection in two-component annulus grout behind a pre-cast segmental tunnel liner using Ground Penetrating Radar10.1016/j.tust.2018.09.032 ↗
32. Measuring annular thickness of backfill grouting behind shield tunnel lining based on GPR monitoring and data mining10.1016/j.autcon.2023.104811 ↗
33. Evaluation of steel mesh impact on GPR detection of voids behind lining in railway tunnels10.1016/j.conbuildmat.2025.140316 ↗