Mission Schedule Control for an Aviation Cluster Based on the Critical Path Transition Tree

Yao Sun, Qi Song, Ying Wang, Bin Wu, Jianfeng Li, Jiafeng Zhang, Dong Wang

Applied Sciences· Volume 15· Issue 18

Abstract

Addressing the real-time control challenges within large-scale, complex resource-constrained project scheduling, this paper investigates control strategies to ensure the on-time initiation of critical task nodes during the execution of aviation cluster mission plans in the presence of disturbances. Conventional resource-constrained project scheduling problem (RCPSP) models typically treat task start times as the primary decision variables, overlooking the intrinsic link between task duration and resource allocation. Moreover, their reliance on intelligent optimization algorithms struggles to simultaneously balance solution accuracy and computational efficiency, thus failing to meet the demands of precise, real-time control. This paper proposes a real-time project schedule control system with the primary objective of preventing delays in critical tasks. The system aims to maximize the remaining anti-disturbance capacity under resource constraints, and establishes five control constraints tailored to the practical problem’s characteristics. The limitations of traditional approaches mainly lie in the fact that they take the start time of each task as the decision variable. When the scale of task quantity in the project is large, the decision dimension increases exponentially; meanwhile, the start times of various tasks are interdependent, leading to extremely complex constraint relationships. To overcome the limitations of traditional methods, this paper introduces a precise control method based on the Critical Path Transform Tree (CPTT). This method takes task duration as the decision variable, calculates the start time of each task using a recursive formula, and integrates expert heuristic knowledge to transform the dynamic network schedule from a “black box” to a “gray box” model. It effectively addresses the technical challenge of reverse mapping in the recursive formula, ultimately realizing precise and real-time control of the project schedule. The simulation results show that while maintaining high solution accuracy, the computational efficiency of the proposed control method is significantly improved to 1.6 s—compared with an average of 6.9 s for the adaptive differential evolution algorithm—thus verifying its effectiveness and practicality in real-time control applications.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Resource-Constrained Project Scheduling · Scheduling and Timetabling Solutions · Real-Time Systems Scheduling

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

School of Aeronautical Engineering, Air Force Engineering University, Xi’an 710051, China

Air Traffic Control and Navigation School, Air Force Engineering University, Xi’an 710038, China

Beijing Aeronautical Technology Research Center, Beijing 100076, China

School of Electro-Mechanical Engineering, Xidian University, Xi’an 710071, China

Funding

National Social Science Fund of China

References (32)

Show source-provided references
1. A production schedule evaluation method based on program evaluation and review technique
2. Study on project scheduling management
3. Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process10.1007/s10479-024-05896-8 ↗
4. A machine learning based EMA-DCPM algorithm for production scheduling10.1038/s41598-024-71355-w ↗
5. Project scheduling under resource constraints: Historical review and categorization of procedures10.1080/05695557308974916 ↗
6. Normative design of organizations. I. mission planning10.1109/TSMCA.2002.802819 ↗
7. An adaptative bacterial foraging optimization algorithm for solving the MRCPSP with discounted cash flows10.1007/s11750-021-00612-2 ↗
8. A novel disjunctive-graph-based meta-heuristic approach for multi-objective resource-constrained project scheduling problem with multi-skilled staff10.1016/j.swevo.2025.101939 ↗
9. Critical chain based Proactive-Reactive scheduling for Resource-Constrained project scheduling under uncertainty10.1016/j.eswa.2022.119188 ↗
10. Exact and heuristic methods for Anchor-Robust and Adjustable-Robust RCPSP10.1007/s10479-023-05537-6 ↗
11. A Dynamic Reactive Scheduling Method for the Resource Constrained Project Scheduling Problem
12. Comparison of two problem transformation-based methods in detecting the best performing branch-and-bound procedures for the RCPSP10.1016/j.eswa.2025.127383 ↗
13. Integer Linear Programming Formulations for the RCPSP considering Multi-Skill, Multi-Mode, and Minimum and Maximum Time Lags10.1109/TLA.2021.9423821 ↗
14. Carvin, B., Bellenguez, O., and Massonnet, G. (2025). Tabu search for a multi-mode RCPSP with generalized precedence sequence-dependent setup time. Comput. Ind. Eng, 111142.10.1016/j.cie.2025.111142 ↗
15. Deep reinforcement learning for solving resource constrained project scheduling problems with resource disruptions10.1016/j.rcim.2023.102628 ↗
16. Xue, W.R. (2015). Research on Project Schedule Management Oriented to Collaborative Construction. [Ph.D. Thesis, Harbin Institute of Technology].
17. Research on production planning management in supply chain management environment
18. Yang, X.J. (2015). Research on Production Schedule Control of Aerospace Products Based on Multi-Level Earned Value Method. [Ph.D. Thesis, Harbin Engineering University].
19. Zhang, Y. (2024). Application of improved earned value method in cost control of road construction projects. Eng. Cost Manag., 69–75.
20. Evaluation of flight plan robustness based on flight redistribution
21. Qu, J.Y., Wu, S.X., and Zhang, J.J. (2023). Flight delay propagation prediction based on deep learning. Mathematics, 11.10.3390/math11030494 ↗
22. Wei, X., Li, Y., Shang, R., Ruan, C., and Xing, J. (2023). Airport cluster delay prediction based on TS-BiLSTM-attention. Aerospace, 10.10.3390/aerospace10070580 ↗
23. Irregular flight recovery under resource restriction
24. The crucial technology research of operational plan management
25. Zhang, Y.X. (2014). Research on Modeling and Optimization Method of Military Mission Plan in Uncertain Environment. [Ph.D. Thesis, National University of Defense Technology].
26. Modeling and solution of joint operational plans with time windows
27. Dynamic task plan adjustment model and algorithm based on battlefield emergencies
28. Distributed dynamic task plan adjustment model and algorithm
29. Design of battle management system based on workflow engine
30. Technology for intelligent battle management
31. Development of work breakdown structure (WBS) for rapid damage runway repair (RADARR) time planning at military airbases10.1051/e3sconf/202451705002 ↗
32. Collaborative mission schedule management method for air battle management