Feasibility and Optimization Study on the Replacement of Core Rock Columns with Temporary Steel Supports in the Construction of Large-Section Subway Tunnels in Interbedded Rock Masses
Source abstract
Abstract
With the development of subway transportation, how to excavate large-section tunnels and find more convenient and reliable support methods has become an issue that cannot be ignored. This paper addresses issues such as low construction efficiency of core rock columns during the construction of large-section subway tunnels in sandstone–mudstone interbedded geological conditions. It proposes an optimized support scheme that replaces traditional core rock columns with temporary steel supports (steel columns). Finite element analysis was used to compare the deformation of the surrounding rock when retaining the core rock columns, using temporary steel columns to replace the core rock columns, and not providing additional support. Five interlayer positions and four interlayer angles were analyzed to identify the most dangerous geological conditions. Based on this analysis, the reasonable spacing of the temporary steel columns was investigated. The results indicate that temporary steel columns and core rock columns can effectively reduce vertical deformation of the surrounding rock, with steel columns showing slightly better results. Replacing core rock columns with steel columns is feasible. To control tunnel rock mass deformation, this project should ensure that the spacing between temporary steel columns is maintained between 21.88 m and 56.80 m. However, in construction sections with good rock mass conditions, the spacing can be extended as long as safety is ensured.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Geotechnical Engineering and Analysis · Grouting, Rheology, and Soil Mechanics · Geotechnical Engineering and Underground Structures
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Resources and Safety Engineering, Central South University, Changsha 410083, China
References (35)
Show source-provided references
1. Wang, S.W. (2023). Experimental Study on Mechanical Properties and Constitutive Model of Soft and Hard Interbedded Rocks. [Master’s Thesis, Yangtze University].
2. Experimental study of the influence of wetting and drying cycles on the strength of intact rock samples from a red stratum in the Three Gorges Reservoir area10.1016/j.enggeo.2023.107013 ↗
3. Study on Countermeasures for Major Unfavorable Geological Issues of Tunnels on Sichuan-Tibet Railway
4. Analysis of Deformation Characteristics and Failure Mechanism of Interbedded Surrounding Rock Tunnels Based on Principal Stress Difference10.1061/IJGNAI.GMENG-9558 ↗
5. Mechanism of Over-Under-Excavation and Stability Control of Surrounding Rocks in Interbedded Rock Masses
6. Liu, J. (2022). Study on Construction Stability of Biased Closely-Spaced Twin Tunnels in Horizontal Soft-Hard Interbedded Rock Mass. [Master’s Thesis, Chongqing Jiaotong University].
7. Shao, Y.Y. (2013). Study on Surrounding Rock Stability and Failure Modes of Tunnel in Layered Rock Masser. [Master’s Thesis, Southwest Jiaotong University].
8. Fan, C.T. (2024). Study on the Stability and Fine Classification of Layered Surrounding Rock of Deep-buried Railway Tunnel. [Ph.D. Dissertation, Lanzhou Jiaotong University].
9. Similar model test of a mudstone-interbedded-sandstone-bedding rock tunnel10.1016/j.tust.2023.105299 ↗
10. “Noah’s ark”: Its relationship to the telceker earthflow, mount Ararat, eastern Turkey10.1007/s10064-007-0084-3 ↗
11. Liquefaction Evaluation of Interbedded Soil Deposit: Cark Canal in 1999 M7.5 Kocaeli Earthquake10.1061/(ASCE)GT.1943-5606.0002089 ↗
12. On specification of conditions at failure in interbedded sedimentary rock mass10.1007/s11440-019-00794-x ↗
13. Groundwater monitoring of an open-pit limestone quarry: Water-rock interaction and mixing estimation within the rock layers by geochemical and statistical analyses10.1016/j.ijmst.2018.04.002 ↗
14. Semi-Analytical Study of Pile–Soil Interaction on a Permeable Pipe Pile Subjected to Rheological Consolidation of Clayey Soils10.1002/nag.3915 ↗
15. Wang, K., Ye, J., Wang, X., and Qiu, Z. (2024). The Soil-Arching Effect in Pile-Supported Embankments: A Review. Buildings, 14.10.3390/buildings14010126 ↗
16. Prediction method of ground settlement for rectangular tunnel construction10.1016/j.tust.2025.106814 ↗
17. Research on the Prediction Method of 3D Surface Deformation in Filling Mining Based on InSAR-IPIM10.1002/ese3.70040 ↗
18. Data-Driven Method for Predicting Long-Term Underground Pipeline Settlement Induced by Rectangular Pipe Jacking Tunnel Construction10.1061/JPSEA2.PSENG-1855 ↗
19. Design and construction of mountain tunnels in Japan10.1016/S0886-7798(03)00038-5 ↗
20. Haack, A. (1999). Political and social aspects of present and future tunneling. Tenth Australian Tunnelling Conference: The Race for Space, Routledge.
21. Tuneyoshi, U. (1999). Mechanizing and construction result of world largest diameter tunnel for Trans-Tokyo Bay Highway. Challenges for the 21st Century, Proceedings of the World Tunnel Congress 99, Oslo, Norway, 31 May–3 June 1999, AABalkema.
22. Numerical modeling of ground settlement control of large span underground metro station in Tehran Metro using Central Beam Column (CBC) structure10.1016/j.tust.2011.06.007 ↗
23. Three-dimensional modelling of tunnel excavation and lining10.1016/j.compgeo.2004.02.003 ↗
24. Study on design and construction method for the New Tomei–Meishin expressway tunnels10.1016/S0886-7798(03)00036-1 ↗
25. Zhang, J.Q. (2010). Study on Construction Technology of Large Section and Three-Dimensional Cross-Section of Excavation Transfer Station. [Master’s Thesis, Beijing Jiaotong University].
26. Seismic performance of steel-PEC spliced frame beam10.1016/j.jcsr.2022.107456 ↗
27. Cyclic performance of novel composite beam-to-column connections with reduced beam section fuse elements10.1016/j.istruc.2023.02.054 ↗
28. A push-out test on partially encased composite column with different positions of shear studs10.1016/j.engstruct.2023.116343 ↗
29. (2016). Railway Tunnel Design Specifications (Standard No. TB 10003-2016).
30. (2012). Code for Geotechnical Investigation of Urban Rail Transit (Standard No. GB 50307-2012).
31. Behavior of noncircular tunnels excavated in stratified rock masses–Case of underground coal mines10.1016/j.jrmge.2018.05.005 ↗
32. Wu, S., Wu, J., and Liu, D. (2023). Research on Construction Sequences and Construction Methods of the Small Clear-Distance, Double-Arch Tunnel under an Asymmetrical Load. Appl. Sci., 13.10.3390/app13148242 ↗
33. Fang, Z.C. (2023). Study on Failure Mechanism and Deformation Control of Tunnels in Soft and Hard Interbedded Rock Mass with High Geo-Stress. [Ph.D. Dissertation, Shijiazhuang Tiedao University].
34. Qian, J.W. (2021). Research on Stability and Reinforcement of Mountain Tunnel Under the Effect of Fluid-Solid Coupling. [Master’s Thesis, Beijing Jiaotong University].
35. (2014). Technical Specifications for Monitoring Urban Rail Transit Projects (Standard No. GB 50911-2013).