journal article·2025-07-28Open access

Study on Vibration Effects and Optimal Delay Time for Tunnel Cut-Blasting Beneath Existing Railways

Ruifeng Huang, Wenqing Li, Yongxiang Zheng, Zhong Li

Applied Sciences· Volume 15· Issue 15

Abstract

With the development of underground space in urban areas, the demand for tunneling through existing railways is increasing. The adverse effects of cut-blasting during the construction of tunnels under crossing existing railways are investigated. Combined with the principle of blasting seismic wave superposition, LS-DYNA numerical simulation is used to analyze the seismic wave superposition law under different superposition methods. This study also investigates the vibration reduction effect of millisecond blasting for cut-blasting under the different classes of surrounding rocks. The results show that the vibration reduction forms of millisecond blasting can be divided into separation and interference of waveform. Based on the principle of superposition of blasting seismic waves, vibration reduction through wave interference is further divided. At the same time, a new vibration reduction mode is proposed. This vibration reduction mode can significantly improve construction efficiency while improving damping efficiency. The new vibration reduction mode can increase the vibration reduction to 80% while improving construction efficiency. Additionally, there is a significant difference in the damping effect of different classes of surrounding rock on the blasting seismic wave. Poor-quality surrounding rock enhances the attenuation of seismic wave velocity and peak stress in the surrounding rock. In the Zhongliangshan Tunnel, a tunnel cut-blasting construction at a depth of 42 m, the best vibration reduction plan of Class III is 3 ms millisecond blasting, in which the surface points achieve separation vibration reduction. The best vibration reduction plan of Class V is 1 ms millisecond blasting, in which the surface points achieve a new vibration reduction mode. During the tunnel blasting construction process, electronic detonators are used for millisecond blasting of the cut-blasting. This method can reduce the vibration effects generated by blasting. The stability of the existing railway is ultimately guaranteed. This can improve construction efficiency while ensuring construction safety. This study can provide significant guidance for the blasting construction of the tunnel through the railway.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Civil and Geotechnical Engineering Research · Geotechnical Engineering and Underground Structures · Geotechnical Engineering and Analysis

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Key Laboratory of Roads and Railway Engineering Safety Control (Shijiazhuang Tiedao University), Ministry of Education, Shijiazhuang 050043, China

Fifth Engineering Corporation Limited, China Railway 14th Bureau Group, Jining 272000, China

School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043, China

References (35)

Show source-provided references
1. Song, M., Liu, J., Wang, X., Lou, H., and Lin, X. (2022). Study on Railway Subgrade Settlement induced by an Ultra-Large-Diameter Shield Tunnel Crossing under Railway Subgrade. Symmetry, 15.10.3390/sym15010075 ↗
2. Investigation of Underpass and Railway Track Settlements Induced by Shield Tunneling Through In Situ Test and 3D FEM Simulation10.1007/s40999-023-00853-1 ↗
3. Prediction of blast induced vibrations in the structures of Karoun III power plant and dam10.1177/1077546310370985 ↗
4. Blasting vibration response and safety control of mountain tunnel10.1007/s10064-023-03199-z ↗
5. Effect of Blast-Induced Vibration from New Railway Tunnel on Existing Adjacent Railway Tunnel in Xinjiang, China10.1007/s00603-012-0259-5 ↗
6. Numerical Evaluation on Dynamic Response of Existing Underlying Tunnel Induced by Blasting Excavation of a Subway Tunnel
7. Vibration effect and ocean environmental impact of blasting excavation in a subsea tunnel10.1016/j.tust.2022.104855 ↗
8. Vibration control of blasting excavation of large cross-section highway tunnel over metro line10.1007/s12517-020-05836-3 ↗
9. Xie, C., Qu, Y., Lu, H., and Song, S. (2024). Study on Deformation of New Tunnels Overcrossing Existing Tunnels Underneath Operating Railways. Buildings, 14.10.3390/buildings14082420 ↗
10. Dynamic response and regular analysis of adjacent buildings under blasting construction across foundation pits of subway stations10.1016/j.istruc.2024.106903 ↗
11. Analysis of Blasting Vibration Effect of Railway Tunnel and Determination of Reasonable Burial Depth
12. Lin, F., Liu, R., Zhang, Z., Jiang, D., Chen, J., and Li, Y. (2022). Reduction of Blasting Induced Ground Vibrations Using High-Precision Digital Electronic Detonators. Front. Earth Sci., 9.10.3389/feart.2021.804504 ↗
13. Study on the propagation and attenuation characteristics of tunnel blasting vibration waves at different blast center distances10.1016/j.jappgeo.2023.105280 ↗
14. Effects of delay time on crack coalescence between two boreholes10.1016/j.tafmec.2023.104210 ↗
15. Xu, R., Zhang, J., Wu, B., and Zhang, F.-L. (2023). Vibration Reduction and Explosion Control Investigation for an Ultra-Shallow Buried Tunnel under Crossing Buildings Based on HHT Analysis. Sensors, 23.10.3390/s23177589 ↗
16. A Study on the Vibration Frequency of Blasting Excavation in Highly Stressed Rock Masses10.1007/s00603-016-0964-6 ↗
17. A case study of blasting vibration attenuation based on wave component characteristics10.1016/j.jrmge.2022.09.013 ↗
18. Blasting vibration effect and safety evaluation method of railway cross tunnels10.1016/j.tust.2024.105588 ↗
19. Propagation characteristics and prediction of blast-induced vibration on closely spaced rock tunnels10.1016/j.tust.2022.104416 ↗
20. Effect of the Rock Blasting Sequence on Buildings Adjacent to the Hehui Expressway10.1007/s11204-024-09959-7 ↗
21. Safety control of blasting vibration in new tunnel excavation adjacent to existing tunnel10.1007/s10064-025-04112-6 ↗
22. Spectral prediction and control of blast vibrations during the excavation of high dam abutment slopes with millisecond-delay blasting10.1016/j.soildyn.2017.01.007 ↗
23. Influence of millisecond time, charge length and detonation velocity on blasting vibration10.1007/s11771-015-3030-8 ↗
24. Determination and application study of optimal delay time for tunnel millisecond blasting based on interference vibration reduction method10.1177/10775463241258519 ↗
25. Characteristics of blasting vibration induced by short-delay cylindrical charges based on Heelan model10.1177/10775463231224119 ↗
26. Influence of a compensatory well diameter on the efficiency of cut cavity shaping in hard rock formations10.33271/mining19.01.013 ↗
27. Blast wave interaction during explosive detonation in a variable cross-sectional charge10.33271/mining18.02.060 ↗
28. Frequency spectrum characteristics of blast-induced vibration with electronic detonators in ground blasting10.1016/j.jobe.2023.106892 ↗
29. (2019). Safety Technical Specification for Blasting Vibration of Railway Engineering (Standard No. TB10313-2019).
30. (2015). Safety Regulations for Blasting (Standard No. GB 6722-2014).
31. Analysis on Influential Factors of Vibration Superposition in Middle and Far Field of Millisecond Blasting
32. Guo, X., Zhang, J., and Liu, Q. (2006). Analysis of Wavefom Superimposed Action of Millisecond Blasting. Blasting, 234–8+49.
33. Ground vibrations produced by surface and near-surface explosions10.1016/j.apacoust.2013.03.006 ↗
34. Reduction of tunnel blasting induced ground vibrations using advanced electronic detonators10.1016/j.tust.2020.103556 ↗
35. (2014). Standard for Engineering Classification of Rock Mass (Standard No. GB 50218-2014).