Abstract

This study aims to critically analyze the theoretical and practical contributions of recent literature on the Critical Chain Project Management (CCPM) method in multi-project environments. To this end, a systematic literature review (SLR) was conducted based on 62 studies indexed in the Scopus and Web of Science databases between 2014 and 2025. The articles were analyzed in terms of application domains, employed methods, obtained results, and proposed integrations with other approaches. Most studies used modeling and simulation, focusing on time reduction, risk mitigation, and cost optimization. A growing trend has been identified toward integrating CCPM with methodologies, such as Scrum, BIM, Lean Construction, Fuzzy FMEA, and predictive algorithms, thereby broadening its applicability in high-complexity scenarios. However, a significant gap remains in empirical studies applied to Engineer-to-Order (ETO) systems and service-based organizations, which are characterized by high customization, variability, and interdependence of resources. The research is justified by the need to consolidate accumulated knowledge on CCPM and to guide future investigations toward underexplored sectors. The findings strengthen the theoretical robustness of the method while indicating concrete opportunities for empirical validation in real-world organizational settings.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: BIM and Construction Integration

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Department of Production Engineering, University of Vale do Rio dos Sinos (UNISINOS), São Leopoldo 93022-750, RS, Brazil

Federal Institute of Education, Science and Technology of Rio Grande do Sul (IFRS), Campus Caxias do Sul, Caxias do Sul 95043-700, RS, Brazil

Federal Institute of Education, Science and Technology of Tocantins (IFTO), Campus Araguaína, Araguaína 77804-030, TO, Brazil

References (76)

Show source-provided references
1. Utilizing Project Management Software in Project Scheduling: A Case Study10.1088/1757-899X/528/1/012037 ↗
2. Azhar, K., Mortadza, B., and Rizal, A.M. (2024). The Roll-Out of Project Management System to Improve Project Progress Reporting. Int. J. Acad. Res. Bus. Soc. Sci., 14.10.6007/IJARBSS/v14-i12/23215 ↗
3. Corrigendum to Project Management Using the Buffers of Time and Resources10.1016/j.sbspro.2017.02.001 ↗
4. Tool Wear Monitoring of High-Speed Broaching Process with Carbide Tools to Reduce Production Errors10.1016/j.ymssp.2022.109003 ↗
5. Monitoring and Controlling Engineering Projects with Blockchain-Based Chain Project Management10.1016/j.autcon.2024.105484 ↗
6. Time Performance Upgrade by Critical Chain Project Management and BIM 4D Integration on Top Structural Work of a High Rise Building Construction Project
7. Mangindaan, D. (2021). Implementation of Lean Construction and Critical Chain Project Management (CCPM) for Waste Management and Work Estimation on the Ciawi Dam Construction Project. IOP Conference Series: Earth and Environmental Science, IOP Publishing Ltd.
8. Analysis of Time Efficiency with CCPM Method and Bim in Construction Projects Construction of High-Rise Residential Building Basement10.13189/cea.2021.090519 ↗
9. Buffer Estimation in the Critical Chain Method by Considering Internal and External Risks
10. A Risk-Oriented Buffer Allocation Model Based on Critical Chain Project Management10.1007/s12205-016-0039-y ↗
11. Implementation of a Scalable Platform for Real-Time Monitoring of Machine Tools10.1016/j.compind.2023.104065 ↗
12. Goldratt, E.M. (1997). Corrente Crítica, Nobel.
13. Zhang, T. (2024, January 28–30). Methodology for Identifying Key Resources in the Critical Chain of Large-Scale Centralized Photovoltaic Power Plants and Construction Interspersed Modeling. Proceedings of the 12th International Symposium on Project Management (ISPM2024), Beijing, China.10.52202/076061-0057 ↗
14. Análise Da Aplicação Da Gestão de Projetos Por Corrente Crítica No Processo de Desenvolvimento de Produtos e Na Gestão de Portfólio de Um Fabricante de Aeronaves10.1590/0104-530x1953-15 ↗
15. Evaluating Storage Tank Cap 10000L Manufacturer by Using Lean Project Management10.1088/1757-899X/528/1/012052 ↗
16. Jo, S.-H., Lee, E.-B., and Pyo, K.-Y. (2018). Integrating a Procurement Management Process into Critical Chain Project Management (CCPM): A Case-Study on Oil and Gas Projects, the Piping Process. Sustainability, 10.10.3390/su10061817 ↗
17. Huihua, X., Li, W., and Song, X. Research on Software Project Schedule Based on Critical Chain. Proceedings of the 2019 5th International Conference on Energy Materials and Environment Engineering.10.1088/1755-1315/295/2/012026 ↗
18. Sastoque Pinilla, L., Llorente Rodríguez, R., Toledo Gandarias, N., López de Lacalle, L.N., and Ramezani Farokhad, M. (2019). TRLs 5–7 Advanced Manufacturing Centres, Practical Model to Boost Technology Transfer in Manufacturing. Sustainability, 11.10.3390/su11184890 ↗
19. Makarenko, Y., Tereshchenko, S., Metelenko, N.G., Mykolenko, I.H., and Oliinyk, A.S. (2019). Strategic Risks Management in Implementation of It Projects. Acad. Strateg. Manag. J., 18.
20. A Study of the Critical Chain Project Management Method Applied to a Multiproject System10.1177/8756972819832203 ↗
21. Impact of Critical Chain Project Management and Product Portfolio on New Product Development Performance10.1108/JBIM-11-2018-0327 ↗
22. Cruz Villazón, C., Sastoque Pinilla, L., Otegi Olaso, J.R., Toledo Gandarias, N., and López de Lacalle, N. (2020). Identification of Key Performance Indicators in Project-Based Organisations through the Lean Approach. Sustainability, 12.10.3390/su12155977 ↗
23. Ma, G., Wu, M., Hao, K., and Shang, S. (2021). A DSM-Based CCPM-MPL Representation Method for Project Scheduling under Rework Scenarios. Adv. Civ. Eng., 2021.10.1155/2021/8878308 ↗
24. Production Planning and Scheduling Challenges in the Engineer-to-Order Manufacturing Segment—A Literature Study
25. Five Steps to Conducting a Systematic Review10.1177/014107680309600304 ↗
26. CamarinhaMatos, L.M., Afsarmanesh, H., and Antonelli, D. (2019). Collaborative Networks Management from a Theory of Constraints. Collaborative Networks and Digital Transformation, Springer International Publishing AG.10.1007/978-3-030-28464-0 ↗
27. A Robust Scheduling for the Multi-Mode Project Scheduling Problem with a given Deadline under Uncertainty of Activity Duration10.1080/00207543.2018.1552371 ↗
28. Ma, C., Hu, W., and Deng, Y. (2019, January 27–28). Application of Improved Critical Chain and Earned Value Technique in Software Engineering & Integrated Project Progress Control. Proceedings of the 2019 IEEE 9th Symposium on Computer Applications & Industrial Electronics (ISCAIE), Kota Kinabalu, Malaysia.10.1109/ISCAIE.2019.8743672 ↗
29. Multi-Objective Optimization for Repetitive Scheduling under Uncertainty10.1108/ECAM-05-2018-0217 ↗
30. The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework10.1142/S0217595919500106 ↗
31. Wilde, K., and Niedostatkiewicz, M. Calculation of the Auxiliary Buffers Time with Regard to the robustness of the Construction Schedule to Disruption. Proceedings of the 64th Scientific Conference of the Committee for Civil Engineering of the Polish Academy of Sciences and the Science Committee of the Polish Association of Civil Engineers (PZITB) (KRYNICA 2018).
32. Incorporation of Resource Reliability into Critical Chain Project Buffer Sizing10.1080/00207543.2019.1667041 ↗
33. Abdullah, A.G., Suhartanto, D., Widiaty, I., Aviasti, A.I.H., Usman, D.N., Nugraha, R.P.T.D., Warouw, F.F., and Basyarudin, N.C. (2025, January 12–16). Scheduling Evaluation in Construction Projects Using the Critical Chain Management Method. Proceedings of the International Conference on Innovation in Engineering and Vocational Education 2019 (ICIEVE 2019), PTS 1–4, Chicago, IL, USA.
34. Rahim, R., Null, M., Null, S., Watrianthos, R., and Hutahean, J. (2021). Construction Project Evaluation Using CPM-Crashing, CPM-PERT and CCPM for Minimize Project Delays. Journal of Physics: Conference Series, IOP Publishing Ltd.
35. Critical Chain Project Management for a Highway Construction Project with a Focus on Theory of Constraints
36. Buffer Sizing in Critical Chain Project Management by Network *10.1016/j.omega.2020.102382 ↗
37. Integrating Critical Chain Project Management with Last Planner system for Linear Scheduling of Modular Construction10.1108/CI-05-2018-0046 ↗
38. Kulejewski, J., Ibadov, N., Roslon, J., and Zawistowski, J. (2021). Cash Flow Optimization for Renewable Energy Construction Projects with a New Approach to Critical Chain Scheduling. Energies, 14.10.3390/en14185795 ↗
39. A Proposal of Project Management Practices in Public Institutions through a Comparative Analyses of Critical Path Method and Critical Chain
40. Peng, J., and Peng, C. (2022). Buffer Sizing in Critical Chain Project Management by Brittle Risk Entropy. Buildings, 12.10.3390/buildings12091390 ↗
41. Data-Driven Project Buffer Sizing in Critical Chains10.1016/j.autcon.2022.104134 ↗
42. A Multi-Objective Dynamic Optimization Approach to Project Schedule: A Case Study of a Gas Field Construction10.1007/s12205-021-0410-5 ↗
43. Anastasiu, L., Campian, C., and Roman, N. (2023). Boosting Construction Project Timeline: The Case of Critical Chain Management (CCPM). Buildings, 13.10.3390/buildings13051249 ↗
44. Buffer Monitoring of Critical Chain Projects Based on Support Vector Prediction10.1007/s12205-023-0033-0 ↗
45. Critical Chain Based Proactive-Reactive Scheduling for Resource-Constrained Project Scheduling Under Uncertainty10.1016/j.eswa.2022.119188 ↗
46. Determining a Fuzzy Model of Time Buffer Size in Critical Chain Project Management
47. Modified Critical Chain Scheduling for Construction Projects10.1080/16874048.2025.2459038 ↗
48. Project Buffer Sizing of a Critical Chain Based on Comprehensive Resource Tightness10.1016/j.ejor.2015.07.009 ↗
49. Incorporation of Activity Sensitivity Measures into Buffer Management to Manage Project Schedule Risk10.1016/j.ejor.2015.08.066 ↗
50. Multi-Objective Optimization Model for Multi-Project Scheduling on Critical Chain10.1016/j.advengsoft.2013.11.004 ↗
51. Multi-Project Time-Cost Optimization in Critical Chain with Resource Constraints10.1007/s12205-017-0691-x ↗
52. Integrating Critical Chain Method with AGILE Life Cycles in the automotive Industry10.1016/j.sbspro.2015.07.088 ↗
53. Reliability Assessment of the Construction Schedule by the Critical Chain Method
54. The Boundary between Good and Bad Multitasking in CCPM
55. Robust Optimization Model of Project Scheduling Problem Based on Genetic
56. The Analysis of Bank Mobile Payment Project’s Schedule Management Based on Improved Critical Chain Method
57. A Comprehensive and Practical Framework for Reliable Scheduling in Project Management
58. Aircraft Maintenance Checks Using Critical Chain Project Path10.1108/AEAT-10-2013-0186 ↗
59. Munoz, J.L.A., Blanco, J.L.Y., and CapuzRizo, S.F. (2017). Comprehensive Reorganization of Project Management: A Case Study. Project Management and Engineering Research, AEIPRO 2016, Springer International Publishing AG.10.1007/978-3-319-51859-6 ↗
60. Critical Chain Project Buffer Sizing Based on Resource Constraints10.1080/00207543.2016.1200151 ↗
61. Critical Chain Scheduling: A New Approach for Feeding Buffer Sizing10.1504/IJOR.2016.073254 ↗
62. Analysis of the Application of Critical Chain Project Management in the Product Development Process and Portfolio Management of an Aircraft Manufacturer
63. Dynamic Monitoring and Control of a Critical Chain Project Based on Phase Buffer Allocation10.1080/01605682.2017.1415641 ↗
64. Su, Y., Lucko, G., and Thompson, R.C. (2016, January 11–14). Evaluating Performance of Critical Chain Project Management to Mitigate Delays Based on Different Schedule Network Complexities. Proceedings of the Proceedings Winter Simulation Conference, Washington, DC, USA.10.1109/WSC.2016.7822362 ↗
65. Yang, S.-M., Liu, Y.-C., and Yen, T.-Y. (2018, January 28–30). Integration of Fuzzy Logic and QFD for Critical Chain in Project Scheduling with Uncertainties. Proceedings of the 2018 International Conference on System Science and Engineering ICSSE 2018, New Taipei, Taiwan.10.1109/ICSSE.2018.8520264 ↗
66. Scenario-Based Proactive Robust Optimization for Critical-Chain Project Scheduling10.1061/(ASCE)CO.1943-7862.0001003 ↗
67. Estimation of the Resource Buffers in the Assembly Process of a Shearer Machine in the CPPM Method10.1051/matecconf/20179406012 ↗
68. Scheduling of an Assembly Process of a Chosen Technical Mean Using the Critical Chain Approach10.1051/matecconf/20179406015 ↗
69. Project Duration Risk Transmission and Control Based on CCPM10.19026/rjaset.7.298 ↗
70. Improved Critical Chain Buffer Management Framework Considering Resource Costs and Schedule Stability10.1007/s10696-016-9241-y ↗
71. Integration of Linear Scheduling Method and the Critical Chain Project Management10.1139/cjce-2017-0020 ↗
72. An Algorithmic Framework for Improving the Performance of the Critical Chain Buffer Sizing Method
73. Study on the Schedule Management Methods of Projects Based on Critical Chain Technology10.4028/www.scientific.net/AMM.488-489.1454 ↗
74. Ghazvini, M.S., Ghezavati, V., Raissi, S., and Makui, A. (2017). An Integrated Efficiency-Risk Approach in Sustainable Project Control. Sustainability, 9.10.3390/su9091575 ↗
75. Buffer Sizing of Critical Chain Based on Attribute Optimization10.1177/1063293X14541286 ↗
76. Sastoque-Pinilla, L., Artelt, S., Burimova, A., Lopez de Lacalle, N., and Toledo-Gandarias, N. (2022). Project Success Criteria Evaluation for a Project-Based Organization and Its Stakeholders—A Q-Methodology Approach. Appl. Sci., 12.10.3390/app122111090 ↗