Process Optimization for Complex Product Assembly Workshops with AGV Integration via Discrete Event Simulation

Hailong Song, Shengluo Yang, Shuoxin Yin, Zhigang Xu

Applied Sciences· Volume 15· Issue 14

Abstract

For complex assembly workshops, optimizing AGV scheduling is critical to enhancing production efficiency and resource utilization. Traditional scheduling methods often rely on fixed priority rules and basic path planning algorithms, which are insufficient to accommodate the dynamic changes in resource availability and task demands. To overcome these limitations, this study proposes a DES-based optimization approach that dynamically adjusts AGV task allocation and path planning to improve scheduling performance in complex manufacturing environments. By integrating lean production principles with intelligent simulation technologies, a comprehensive simulation model was developed using the Plant Simulation platform. This model simulates the coordination between AGVs and workstations while optimizing workstation layout and material flow. Simulation results demonstrate that the proposed approach significantly improves AGV scheduling efficiency and overall production performance. Notably, workstation utilization increased from below 6% to over 28%, while the work-in-progress rate dropped from 94% to under 74%. This study offers a practical and effective AGV scheduling strategy for complex product assembly workshops, with strong potential for real-world implementation.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Assembly Line Balancing Optimization · Manufacturing Process and Optimization · Advanced Manufacturing and Logistics Optimization

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Shenyang Institute of Automation, Chinese Academy of Sciences, Shenyang 110000, China

University of Chinese Academy of Sciences, Beijing 100049, China

School of Mechanical Engineering, University of Shanghai for Science and Technology, Shanghai 200093, China

Funding

National Key Research and Development Program of China

References (34)

Show source-provided references
1. Stochastic optimization of two-machine flow shop robotic cells with controllable inspection times: From theory toward practice10.1016/j.rcim.2019.101822 ↗
2. Zhang, J., Liu, J., Gong, K., Zhang, C., Zhuang, C., and Zhao, B. (2021). Spacecraft assembly quality control and prediction technology based on digital twin. Comput. Integr. Manuf. Syst., 605–616.
3. Breznik, M., Buchmeister, B., and Herzog, N.V. (2023). Assembly Line Optimization Using MTM Time Standard and Simulation Modeling-A Case Study. Appl. Sci., 13.10.3390/app13106265 ↗
4. Robotic Assembly of Aircraft Engine Components Using a Closed-loop Alignment Process10.1016/j.procir.2014.10.070 ↗
5. Visual monitoring system for small and medium-sized automatic production lines
6. Research on flexible job shop scheduling problem with AGV using double DQN10.1007/s10845-023-02252-8 ↗
7. A Comprehensive Review of Recent Advances in Automated Guided Vehicle Technologies: Dynamic Obstacle Avoidance in Complex Environment Toward Autonomous Capability10.1109/TIM.2023.3338722 ↗
8. A review of recent advances, techniques, and control algorithms for automated guided vehicle systems10.1007/s40430-024-04896-w ↗
9. Mueller, K., Andrew, A., and Heger, J. (2024, January 14–16). The Impact of AGVs and Priority Rules in a Real Production Setup—A Simulation Study. Proceedings of the 9th International Conference on Dynamics in Logistics (LDIC), Bremen, Germany.10.1007/978-3-031-56826-8_19 ↗
10. Research on multi-AGV path planning based on map training and action replanning10.1007/s11370-025-00617-x ↗
11. AGV Path Planning with Dynamic Obstacles Based on Deep Q-Network and Distributed Training10.1007/s40684-025-00706-3 ↗
12. Niu, Q., Fu, Y., and Dong, X. (2024). Omnidirectional AGV Path Planning Based on Improved Genetic Algorithm. World Electr. Veh. J., 15.10.3390/wevj15040166 ↗
13. Zhang, H., Zheng, T., Sun, H., and Hong, Q. (2025). Optimization of AGV Scheduling System Using Genetic Algorithm. Advanced Manufacturing and Automation XIV, Springer Nature.10.1007/978-981-96-2625-0_1 ↗
14. Li, J. (2024). Improved Ant Colony Algorithm for AGV Multi-objective Point Navigation. Proceedings of the 2nd International Conference on Internet of Things, Communication and Intelligent Technology, Springer Nature.10.1007/978-981-97-2757-5_46 ↗
15. Collaborative algorithm of workpiece scheduling and AGV operation in flexible workshop
16. Li, J., Cheng, W., Lai, K.K., and Ram, B. (2022). Multi-AGV Flexible Manufacturing Cell Scheduling Considering Charging. Mathematics, 10.10.3390/math10193417 ↗
17. A branch-and-bound approach for AGV dispatching and routing problems in automated container terminals10.1016/j.cie.2022.107968 ↗
18. AGV dispatching and bidirectional conflict-free routing problem in automated container terminal10.1016/j.cie.2023.109611 ↗
19. A matheuristic for AGV scheduling with battery constraints10.1016/j.ejor.2021.08.008 ↗
20. Research on dynamic job shop scheduling problem with AGV based on DQN
21. Song, H., Yang, S., Yin, S., Wang, J., and Xu, Z. (2025). Intelligent Scheduling of a Pulsating Assembly Flow Shop Considering a Multifunctional Automated Guided Vehicle. Appl. Sci., 15.10.3390/app15052593 ↗
22. Production simulation and configuration optimization based on discrete event simulation: A case study of an aerospace assembly workshop10.1007/s12206-025-0331-1 ↗
23. Verification method fordiscrete event simulation based on discrete-event system formalism
24. Evolutionary digital twin model with an agent-based discrete-event simulation method10.1007/s10489-022-03507-2 ↗
25. Li, G., and Zhang, L. (2024). Discrete-Event Simulation Integrates an Improved NEH Algorithm for Practical Flowshop Scheduling Problems in the Satellite Industry. Appl. Sci., 14.10.3390/app14219755 ↗
26. Kostrzewski, M. (2020). Sensitivity Analysis of Selected Parameters in the Order Picking Process Simulation Model, with Randomly Generated Orders. Entropy, 22.10.3390/e22040423 ↗
27. Simulation and analysis of a preemptive transportation model using flexsim software10.2507/IJSIMM23-2-CO7 ↗
28. Automatic closed-loop scheduling in underground mining using discrete event simulation10.17159/2411-9717/679/2021 ↗
29. Plant simulation for robot automation system of deep-frying process of Kimbugak10.1007/s10068-024-01813-8 ↗
30. Simulation Platform for Optimization and Decision Making of Flexible Manufacturing Process of Automatic Production Lines
31. Guerrero, R., Serrano-Hernandez, A., Pascual, J., and Faulin, J. (2022). Simulation Model for Wire Harness Design in the Car Production Line Optimization Using the SimPy Library. Sustainability, 14.10.3390/su14127212 ↗
32. Smagowicz, J., Szwed, C., and Berlec, T. (2024). An Assortment-Quantity Optimization Problem in Printing Industry Using Simulation Modelling. Sustainability, 16.10.3390/su16041693 ↗
33. System dynamics model and discrete-event simulation of green logistics cases for the electric bus industries10.1504/IJGW.2024.135989 ↗
34. Optimizing Algerian Company’s Delivery Fleet with Agent_Based Model in Anylogic