journal article·2025-04-23Open access

An Integrated Planning and Control Framework (IPCF) for Construction Projects—Step 1: Development of the Construction Data Hub (CDH)

Mai Ghazal, Ahmed Hammad

Applied Sciences· Volume 15· Issue 9

Abstract

Construction projects generate a significant volume of scattered data in various formats. However, having a large amount of data is insufficient; there is a need to obtain the appropriate metadata to enable extracting useful knowledge from it. Therefore, professionals need a consistent data acquisition model to gather comprehensive data from multiple projects and organizations in a format ready for applying machine learning. This research proposes an Integrated Planning and Control Framework (IPCF) to implement the concept of “From Data to Decision (FD2D)” in the construction industry. The first step of the framework is the development of the Construction Data Hub (CDH). The CDH seeks to collect data from twelve dimensions that impact the project’s planning and control. It relies on using the industry-accepted concept of work packages, which is the optimum level of detail for data acquisition. To validate the CDH, a machine learning model that utilizes the data collected through the CDH is developed to analyze the factors influencing construction project profit. The study revealed six significant profit-influencing factors. These factors might assist estimators in predicting profit margins during the early estimation stage, instead of relying on intuition or uniform rates, which are not always reliable methods.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: BIM and Construction Integration

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Construction Engineering and Management, Department of Civil and Environmental Engineering, University of Alberta, Edmonton, AB T6G 1H9, Canada

Funding

Natural Sciences and Engineering Research Council of Canada

References (52)

Show source-provided references
1. Risk and unpredictability in construction projects
2. Big data in the construction industry: A review of present status, opportunities, and future trends10.1016/j.aei.2016.07.001 ↗
3. Knowledge management in construction projects: An integrated approach
4. Knowledge management in construction projects: Challenges and solutions
5. Golestanizadeh, M., Zavadskas, E.K., and Antucheviciene, J. (2023). Effective management of project factors in construction projects. Sustainability, 15.
6. Scheduling and progress monitoring in construction projects
7. CTGAN-Based Model to Mitigate Data Scarcity for Cost Estimation in Green Building Projects10.1061/JMENEA.MEENG-5880 ↗
8. Sheng, V.S., Provost, F., and Ipeirotis, P.G. (2008, January 24–27). Get another label? Improving data quality and data mining using multiple, noisy labelers. Proceedings of the 14th ACM SIGKDD International Conference on Knowledge Discovery and Data Mining, Las Vegas, NV, USA.10.1145/1401890.1401965 ↗
9. Machine learning: Trends, perspectives, and prospects10.1126/science.aaa8415 ↗
10. Data quality considerations for big data and machine learning: Going beyond data cleaning and transformations
11. An artificial neural network approach for cost estimation of engineering services
12. Genetic algorithms for multi-project scheduling in construction
13. Resource-constrained scheduling in construction projects
14. Time-cost trade-off analysis in construction projects using genetic algorithms
15. Challenges in data collection for construction project management
16. Roles of artificial intelligence in construction engineering and management: A critical review and future trends10.1016/j.autcon.2020.103517 ↗
17. FD2D (2024, June 14). From Data to Decision (FD2D). Available online: https://fd2d.org/.
18. Eastman, C.M. (2011). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors, John Wiley & Sons.
19. (2020). Standard Practice, Work Breakdown Structures for Defense Materiel Items (Standard No. MIL-STD-881E).
20. Project Management Institute (2004). Project Management Body of Knowledge (PMBOK Guide), Project Management Institute. [3rd ed.].
21. Haugan, G.T. (2001). Effective Work Breakdown Structures, Management Concepts Inc.
22. Rodriguez, A., Locksley, W., and Shishko, R. (2025, April 19). Systems Engineering Handbook, Available online: http://ntrs.nasa.gov/.
23. Advocating a deliverable-oriented work breakdown structure
24. Application of data warehouse and decision support system in construction management10.1016/S0926-5805(02)00087-0 ↗
25. Development of a decision support system using data warehousing to assist builders/developers in site selection10.1016/j.autcon.2004.03.001 ↗
26. Data warehousing for construction equipment management10.1139/l06-108 ↗
27. A project-oriented data warehouse for construction10.1016/j.autcon.2005.11.001 ↗
28. A sewer infrastructure decision support system based on a data warehouse
29. Labor resource data warehouse for construction project management
30. Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects
31. Data acquisition model for labor resource forecasting in construction projects
32. Estimating labor resource requirements in construction projects using machine learning10.1108/CI-11-2021-0211 ↗
33. Machine learning in construction: From shallow to deep learning10.1016/j.dibe.2021.100045 ↗
34. Deep learning in the construction industry: A review of present status and future innovations10.1016/j.jobe.2020.101827 ↗
35. Data-driven machine learning approach to integrate field submittals in project scheduling10.1061/(ASCE)ME.1943-5479.0000873 ↗
36. Machine learning-aided engineering services’ cost overruns prediction in high-rise residential building projects: Application of random forest regression10.1016/j.jobe.2022.104102 ↗
37. Ashtari, M.A., Ansari, R., Hassannayebi, E., and Jeong, J. (2022). Cost overrun risk assessment and prediction in construction projects: A Bayesian network classifier approach. Buildings, 12.10.3390/buildings12101660 ↗
38. Banerjee Chattapadhyay, D., Putta, J., and Rao, P.R.M. (2021). Risk identification, assessments, and prediction for mega construction projects: A risk prediction paradigm based on cross analytical-machine learning model. Buildings, 11.10.3390/buildings11040172 ↗
39. Using machine learning to improve cost and duration prediction accuracy in green building projects10.1061/JCEMD4.COENG-13101 ↗
40. A contingency approach for time-cost trade-off in construction projects based on machine learning techniques10.1108/ECAM-11-2022-1104 ↗
41. Agostinelli, S., Cumo, F., Marzo, R., and Muzi, F. (2022). Digital construction strategy for project management optimization in a building renovation site: Machine learning and big data analysis. International Conference on Trends on Construction in the Post-Digital Era, Springer International Publishing.10.1007/978-3-031-20241-4_2 ↗
42. Machine learning in human resource system of intelligent manufacturing industry10.1080/17517575.2019.1710862 ↗
43. Ebrahimi, S., Fayek, A.R., and Sumati, V. (2021). Hybrid artificial intelligence HFS-RF-PSO model for construction labor productivity prediction and optimization. Algorithms, 14.10.3390/a14070214 ↗
44. Applying machine learning and particle swarm optimization for predictive modeling and cost optimization in construction project management10.1007/s42107-023-00843-7 ↗
45. Construction project management dimensions in transportation agencies: Case study of the US Department of Transportation10.1061/(ASCE)SC.1943-5576.0000579 ↗
46. Lopez, D. (2024, January 10). Rules of Credit in Construction Contracts. PMIKSA. Available online: https://pmiksa.sa/rules/.
47. Factors influencing construction project profits: A review
48. Organizational factors influencing construction project profits
49. Project-related factors influencing construction project profits
50. Investigating profitability performance of construction projects using big data: A project analytics approach10.1016/j.jobe.2019.100850 ↗
51. Data preparation process for construction knowledge generation through knowledge discovery in databases10.1061/(ASCE)0887-3801(2002)16:1(39) ↗
52. RapidMiner Studio (2024, April 09). Weight by tree Importance Operator. RapidMiner Documentation. Available online: https://docs.rapidminer.com/.