Correction: Wang et al. Future Prospects of the Assembly Model for MEP Systems in Chinese Buildings: A Whole Life Cycle Perspective. Appl. Sci. 2024, 14, 6818
Source abstract
Abstract
In the published paper [...]
Only a short abstract or summary was supplied by the source.
Source: crossref · Quality: short
Research context
OpenAlex topics: BIM and Construction Integration
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Business School of Hunan University, Hunan University, Changsha 410082, China
Hunan Xicheng Industry Group, Changsha 410205, China
School of Management, Chongqing University of Science and Technology, Chongqing 401331, China
School of Civil and Hydraulic Engineering, Chongqing University of Science and Technology, Chongqing 401331, China
School of Civil Engineering, Chongqing University, Chongqing 400044, China
College of Environment and Ecology, Chongqing University, Chongqing 400044, China
Funding
Chongqing Municipal Education Commission
References (1)
Show source-provided references
1. Wang, C., Ouyang, P., Liu, X., Zou, Z., Wang, Y., and Wang, R. (2024). Future Prospects of the Assembly Model for MEP Systems in Chinese Buildings: A Whole Life Cycle Perspective. Appl. Sci., 14.10.3390/app14156818 ↗