In order to solve the problem of ineffective pre-splitting blasting and reduce the damage caused to preserved rock bodies in the Niukutou open-pit quarry in the alpine region of Qinghai Province, China, this study investigated the influence of different delay times on the damage caused to the rock mass, combining numerical calculations with field tests. Using the finite element software ANSYS/LS-DYNA 19.0 and based on the constitutive model of saturated skarn, numerical models of pre-splitting blasting with four different delay times (0 ms, 12 ms, 18 ms, and 24 ms) were established. These models systematically analyze the damage evolution of rock and the effective stress distribution in specific elements under different delay times. The results indicate that a maximum damage depth of 32.56 cm occurs when the inter-hole delay is 0 ms, while a minimum damage depth of 30.61 cm is observed when the inter-hole delay is 18 ms. Further analysis reveals that the peak effective stress is highest when the inter-hole delay is 0 ms, and that the peak effective stress at 18 ms is higher than that at 12 ms and 24 ms. Considering the need to control the damage caused to the surrounding rock and the blasting effectiveness, the best pre-splitting blasting effect is achieved with an inter-hole delay of 18 ms. Field tests show that the damage depth of the retained rock mass is 1.62 m when the inter-hole delay is 0 ms; however, it decreases to 0.90 m when the delay is 18 ms, representing a 44% reduction in rock mass damage depth. This study provides theoretical support and practical guidance for the optimization of pre-splitting blasting in saturated skarn in alpine regions.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Rock Mechanics and Modeling · Geotechnical and Geomechanical Engineering · Landslides and related hazards

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Faculty of Land Resources Engineering, Kunming University of Science and Technology, Kunming 650093, China

Advanced Blasting Technology Engineering Research Center of Yunnan Provincial Department of Education, Kunming 650093, China

Funding

National Natural Science Foundation of China · the Basic Research Project of the Yunnan Provincial Department of Science and Technology · Yunnan Major Scientific and Technological Projects · Science and Technology Projects Serving Key Industries in Higher Education Institutions

References (39)

Show source-provided references
1. Wang, Z., Wu, G., and Zhou, L. (2022). Optimization of Pre-Splitting Blasting Hole Network Parameters and Engineering Applications in Open Pit Mine. Appl. Sci., 12.10.3390/app12104930 ↗
2. Delay time optimization in blasting operations for mitigating the vibration-effects on final pit walls’ stability10.1016/j.soildyn.2011.04.004 ↗
3. Controlled blasting for long term stability of pit-walls10.1016/j.ijrmms.2014.05.006 ↗
4. Numerical Simulation Study on Parameter Optimization of Time Sequential Controlled Blasting
5. Presplit Blasting Technique in Treating Hard Overlying Strata: From Numerical Simulation to Field Practice10.1155/2021/5558538 ↗
6. Insights into natural tuff as a building material: Effects of natural joints on fracture fractal characteristics and energy evolution of rocks under impact load10.1016/j.engfailanal.2024.108584 ↗
7. Experimental Study on Vibration Reduction Technology of Hole-by-Hole Presplitting Blasting10.1155/2021/5403969 ↗
8. Study of presplit blasting under high in-situ stress10.1016/j.engfracmech.2023.109360 ↗
9. Fracture Behavior and Fracture Surface Smoothness of Rock-like Model Subjected to Axial Decoupling Spherical Charging10.1016/j.engfracmech.2024.110549 ↗
10. Study on the coupling mechanism of shaped blasting and empty hole to crack coal body10.1016/j.psep.2023.05.078 ↗
11. Rock Fracture Mechanism of Buffer Blasting with Cushion Layer at the Borehole Bottom10.1007/s12613-024-2941-5 ↗
12. Blasting cumulative damage effects of underground engineering rock mass based on sonic wave measurement10.1007/s11771-007-0046-8 ↗
13. Excavation-induced damage studies at the Underground Research Laboratory10.1016/j.ijrmms.2004.09.010 ↗
14. Microcrack-induced damage accumulation in brittle rock under dynamic loading10.1016/0045-7825(86)90057-5 ↗
15. Assessing in situ microcrack damage using ultrasonic velocity tomography10.1016/j.ijrmms.2004.06.002 ↗
16. Impact-induced tensional failure in rock10.1029/92JE02679 ↗
17. Numerical analysis of parameters influencing blast damage and vibration using 3D distinct element method in the Calamine mine10.1007/s12517-023-11848-6 ↗
18. A modal-based method for blast-induced damage assessment of reinforced concrete columns: Numerical and experimental validation10.1016/j.engstruct.2023.117166 ↗
19. Cui, Y.Z., Wu, B., Meng, G.W., and Xu, S.X. (2023). Research on blasting cumulative dynamic damage of surrounding rock in step construction tunnel. Sci. Rep., 13.10.1038/s41598-023-28900-w ↗
20. Numerical and experimental investigation of blasting damage control of a high rock slope in a deep valley10.1016/j.enggeo.2018.01.003 ↗
21. Sonic test singularities of granite stone masonries10.1016/j.conbuildmat.2023.132391 ↗
22. Characterization of ductile damage in polyethylene plate using ultrasonic testing10.1016/j.polymertesting.2017.06.010 ↗
23. Safety threshold of blasting vibration velocity in foundation excavation of Baihetan super-high arch dam10.1007/s10064-020-01876-x ↗
24. Fragmentation Studies with Small Flaws
25. Zhang, Z.C. (2019). Engineering Controlled Blasting, Southwest Jiaotong University Press.
26. Cai, G.F. (1994). New Technology of Smooth Blasting, China Railway Publishing House.
27. Development of a Continuum Damage Model for Blasting Analysis10.1016/S0148-9062(96)00041-1 ↗
28. (2020). Technical Specification for Excavation Construction of Rock-Foundation of Hydraulic Structures (Standard No. SL 47-2020). (In Chinese).
29. Huang, Y.H. (2013). The Technology Study on Long-Hole Pyramid Cut Blasting in Hard Rock Vertical Shaft. [Ph.D. Thesis, China University of Mining and Technology].
30. Difference in Rock-Breaking Characteristics between Water-Coupling Blasting and Air-Coupling Blasting10.1016/j.ijrmms.2024.105924 ↗
31. Numerical Simulation of Stress Wave Induced Fractures in Rock
32. High Explosive Simulation Using Multi-Material Formulations10.1016/j.applthermaleng.2005.10.018 ↗
33. Numerical Investigation on Rock Fragmentation under Decoupled Charge Blasting10.1016/j.compgeo.2023.105312 ↗
34. Numerical analysis on the charge structure optimization under hydraulic blasting and its application
35. Langefors, U., Kihlström, B., and Kenkyūjo, K. (1963). The Modern Technique of Rock Blasting, Almquist and Wiksell.
36. Study on Optimization Method of Pre-splitting Blasting Parameters Based on Orthogonal Design Simulation Experiment
37. Hu, Q.W. (2018). Research on Precise Delay Number (Single) Hole One Shot Pre Splitting Blasting Test. [Master’s Thesis, Kunming University of Science and Technology].
38. Millisecond blasting optimal time delay control based on rock breaking mechanism
39. Wu, X. (2019). Research on the Model Test and Crack Formation Mechanism of Numerical (Single) Hole One Sound Pre Splitting Blasting. [Master’s Thesis, Kunming University of Science and Technology].