Construction Control Technology and Monitoring Analysis of Walking Incremental Launching Construction of Small-Curvature Steel Box Girder Bridges Across Expressways

Hai Huang, Xiaomin Xue, Haitao Ma, Zhijun Zhou, Jianbo Dou, Heng Yang, Erwei Guo, Jianjun Ma

Applied Sciences· Volume 15· Issue 2

Abstract

As urban areas keep growing, there are higher requirements for the carrying capacity of traffic operations, and there are more and more curve incremental launching projects with complex construction conditions. This paper builds upon the walking incremental launching project of a small-curvature steel box girder in Xuchang City and has developed a detailed construction method and monitoring technology. Due to the bridge’s longitudinal gradient being designed as a two-way slope and falling under the category of a small-radius steel box girder, the front end of the main beam exhibits significant lateral deviation, and linear control is difficult. It is necessary to carry out stress and displacement monitoring of the whole process of construction of the curved steel box girder and the guide girder to guide the construction process. The stress conditions of the incremental launching pier and the settlement of the concrete substructure are also studied, and we analyze the stress and displacement characteristics. Firstly, the finite element tool MIDAS Civil is adopted to build a model for the construction. The five most unfavorable working conditions are selected from the entire incremental launch process to analyze the internal force and displacement state of the steel box girder bridge, which is and then compared with the site monitoring value. It is demonstrated by the outcomes that the internal force and deflection of the steel box girder and the guide girder are within the safe construction range, which ensures the security of the incremental launching construction. In the maximum cantilever condition, the guide girder experiences significant stress, but the maximum value is not observed during the maximum cantilever condition of the guide girder. Therefore, whole-process monitoring should be carried during construction to maintain safety measures and quality management.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Structural Engineering and Vibration Analysis · Civil and Geotechnical Engineering Research · Industrial Technology and Control Systems

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

School of Himan Settlements and Civil Engineering, Xi’an Jiaotong University, Xi’an 710049, China

China Construction Seventh Engineering Division Co., Ltd., Zhengzhou 450003, China

School of Civil Engineering and Architecture, Henan University of Science and Technology, Luoyang 471023, China

Henan Province Engineering Technology Research Center of Building Safety and Protection, Luoyang 471023, China

Funding

Key R&D and Promotion Special Project in Henan Province-Science and Technology Research (joint fund) · Key R&D and Promotion Special Project in Henan Province-Science and Technology Research Project · China Construction Seventh Engineering Division Corp., Ltd.

References (20)

Show source-provided references
1. Bridges with multiple Cable-stayed spans10.2749/101686601780324250 ↗
2. Key technologies of whole incremental launching construction control for inclined continuous box girder with steep longitudinal gradient10.4028/www.scientific.net/AMM.204-208.2034 ↗
3. Finite Element Analysis on Incremental Launching Construction for Steel Box Girder
4. Incremental launching construction method for steel Truss suspension bridge10.4028/www.scientific.net/AMR.204-210.842 ↗
5. Hangzhou Jiangdong Bridge Designed as a Spatial Self-Anchored Suspension Bridge, China10.2749/101686610792016673 ↗
6. Innovative structure design and construction-Jiubao Bridge, China10.2749/101686614X14043795570732 ↗
7. A new Technology for Incremental Launching the Small Curvature Radius Variable Cross-Section Steel Box Girder
8. Influence analysis of the incremental launching of steel box girder and local stability control
9. Study on Incremental Launching of Lane L8 Steel Box Girder of Main Bridge in Xiamen Xianyue Flyover
10. Research on the Overall and Local Mechanical Behaviors of Steel Box Girder Cable-Stayed Bridge via Incremental Launching Construction10.18282/ice.v3i2.333 ↗
11. A Construction Technique of Incremental Launching for a Continuous Steel Truss Girder Bridge with Suspension Cable Stiffening Chords
12. Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge10.1155/2022/3641683 ↗
13. Du, J.B., Niu, W., Shi, Y., Wu, Y.Z., and Tang, Q. (2023). Local Mechanical Behaviors of Steel Box Girder During Skew Incremental Launching. Adv. Geospat. Technol. Min. Earth Sci., 371–382.10.1007/978-3-031-20463-0_24 ↗
14. Mechanical Analysis of Steel Box Girder During Incremental Launching
15. Evaluation of Long Multi-Span Steel U-Shaped Girder During Incremental Launching Construction10.1520/JTE20140123 ↗
16. Integrated investigation of an incremental launching method for the construction of long-span bridges10.1016/j.jcsr.2015.05.001 ↗
17. Numerical Validation of the Incremental Launching Method of a Steel Bridge Through a Small-Scale Experimental Study10.1007/s40799-016-0037-5 ↗
18. Chai, H., and Song, Y.M. (2017). Mechanical analysis for incremental launching construction of long-span continuous steel truss bridge. Mech. Archit. Des., 181–188.10.1142/9789813149021_0025 ↗
19. Walking-Type Bidirectional Incremental Launching and Mid-Span Closure Technology for Steel Box Girders with Long Cantilevers10.1088/1755-1315/632/2/022032 ↗
20. Li, Q.F., Guo, H., and Guo, B. (2023). The Dual-Parameter Control of Synchronization in Steel Box Girder Incremental Launching Construction. Appl. Sci., 13.10.3390/app132112074 ↗