journal article·2024-10-16Open access

Structural Design and Study of an Integrated Cutter System Based on Machine Operation

Sijin Liu, Kaixuan Han, Huawei Wang, Hao Chen, Yuyang Ma, Junzhou Huo

Applied Sciences· Volume 14· Issue 20

Abstract

In the process of shield tunneling, the cutter will inevitably be worn and damaged and will need to be replaced frequently. The low efficiency and high safety risk of traditional manual cutter change have prompted robotic cutter change to become the mainstream trend of current research. However, it is difficult to realize mechanical automation disassembly due to the existence of many fragmented parts and complex disassembly steps in the traditional cutter system. Therefore, this paper proposes an eccentric integrated cutter system, which greatly simplifies the disassembly process while retaining the excellent fastening structure of the traditional cutter system. The evaluation system of the cutter system was established through the analytic hierarchy process, and it was verified that the eccentric integrated cutter system has obvious superiority in realizing automated disassembly and assembly and, at the same time, that it has good structural strength. Finally, vibration experiments were carried out based on shield construction conditions. The experimental results show that after 14 h of continuous vibration, the residual preload ratio of the integrated cutter sample stabilized at more than 90%, which indicates good anti-loosening performance.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Tunneling and Rock Mechanics · Advanced machining processes and optimization · Advanced Surface Polishing Techniques

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

China Railway 14th Bureau Group Corporation Limited, Jinan 250101, China

School of Mechanical Engineering, Dalian University of Technology, Dalian 116024, China

China Railway Construction Underwater Shield Tunnel Engineering Laboratory, Jinan 250101, China

Funding

Technology R&D Project of China Railway Construction Co., Ltd · Technology R&D Project of China Railway 14th Bureau Group Co., Ltd

References (25)

Show source-provided references
1. Predicting TBM utilization factor using discrete event simulation models10.1016/j.tust.2019.01.017 ↗
2. A new model for TBM performance prediction in blocky rock conditions10.1016/j.tust.2014.06.004 ↗
3. Herrenknecht, E.H.M., and Bäppler, K. (2007, January 5–10). Compressed air work with tunnel boring machines. Proceedings of the 33rd ITA-AITES World Tunnel Congress, Prague, Czech Republic.
4. Pre-investigation of the subsoil developments in construction of the 4th Elbe Tunnel Tube10.1016/S0886-7798(98)00037-6 ↗
5. A case study on the methane explosion in the excavation chamber of an EPB-TBM and lessons learnt including some recent accidents
6. Chen, H., Li, H., Huo, J.Z., Yang, B.W., and Yang, F. (2022). Assembly Deviation Analysis of New Integrated TBM Disc Cutter and Design of the Supporting Cutter-Changing Robot End-Effector. Appl. Sci., 12.10.21203/rs.3.rs-1200920/v1 ↗
7. A Unified Approach to Integrate Unilateral Constraints in the Stack of Tasks10.1109/TRO.2009.2020345 ↗
8. Camus, T., and Moubarak, S. (2015, January 15–18). Maintenance Robotics in TBM Tunnelling. Proceedings of the 32nd International Symposium on Automation and Robotics in Construction and Mining (ISARC 2015), Oulu, Finland.10.22260/ISARC2015/0090 ↗
9. Snake robots A review of research, products and applications10.1108/IR-02-2014-0309 ↗
10. Simi, A., Manacorda, G., and IEEE (2016, January 13–16). The NeTTUN Project: Design of a GPR Antenna for a TBM. Proceedings of the 16th International Conference on Ground Penetrating Radar (GPR), Hong Kong Polytechn Univ, Dept Land Surveying & Geo Informat, Hong Kong, China.10.1109/ICGPR.2016.7572648 ↗
11. Robotic replacement for disc cutters in tunnel boring machines10.1016/j.autcon.2022.104369 ↗
12. Yuan, J.J., Guan, R.M., Guo, D.Z., Lai, J.X., Du, L., and IEEE (2020, January 28–29). Discussion on the Robotic Approach of Disc Cutter Replacement for Shield Machine. Proceedings of the IEEE International Conference on Real-time Computing and Robotics (IEEE-RCAR), Asahikawa, Japan.10.1109/RCAR49640.2020.9303276 ↗
13. Yang, F., Lan, T., Huo, J.Z., Shi, Y.T., and Chen, H. (2022). Design of a New TBM Integrated Cutter System Based on Analysis of Mechanical Properties and Dynamic Characteristics. Appl. Sci., 12.10.3390/app122312332 ↗
14. Design and dimension optimization of cutter disassembly mechanism for shield tunneling machine10.1007/s12206-021-0624-y ↗
15. An investigation on the anti-loosening characteristics of threaded fasteners under vibratory conditions10.1016/j.mechmachtheory.2008.08.004 ↗
16. Wang, X.Y., Liu, J.Q., and Guo, W. (2011, January 16–18). A Case-based Reasoning Combined with AHP wighting for Cutter Conceptual Configuration Prediction Model. Proceedings of the 2nd International Conference on Advances in Materials and Manufacturing Processes (ICAMMP 2011), Guillin, China.
17. Zhang, E.H., Gao, C.Q., Yang, B., and Su, H.H. (2012, January 16–18). The Conceptual Design of Exercise Washing Machine Based on Trimming. Proceedings of the 2nd International Conference on Advanced Design and Manufacturing Engineering (ADME 2012), Taiyuan, China.
18. Coupling dynamic characteristics of tunnel boring machine cutterhead system with multi-source uncertainties10.1016/j.engfailanal.2022.106180 ↗
19. Meng, Z.C., Yang, D.J., Huo, J.Z., Zhuo, P.Z., and Bao, Y.N. (2021). Development and Performance Evaluation of an Integrated Disc Cutter System for TBMs. Appl. Sci., 11.10.3390/app11020644 ↗
20. (2002). Fastener Test Methods—Vibration (Standard No. GJB715.3A-2002).
21. Yang, Y.L., Du, L.J., Li, Q.W., Zhao, X.B., and Ni, Z.H. (2024). Vibration prediction and analysis of the main beam of the TBM based on a multiple linear regression model. Sci. Rep., 14.10.1038/s41598-024-53868-6 ↗
22. Wang, Z.Y., Jiang, Y.S., Shao, X.K., and Liu, C.L. (2023). On-site measurement and environmental impact of vibration caused by construction of double-shield TBM tunnel in urban subway. Sci. Rep., 13.10.1038/s41598-023-45089-0 ↗
23. Development and in-situ application of a real-time monitoring system for the interaction between TBM and surrounding rock10.1016/j.tust.2018.07.018 ↗
24. Multi-directional coupling dynamic characteristics analysis of TBM cutterhead system based on tunnelling field test10.1007/s12206-015-0701-1 ↗
25. (2015). Aerospace Series—Dynamic Testing of the Locking Behaviour of Bolted Connections under Transverse Loading Conditions (Vibration Test) (Standard No. ISO 16130-2015).