Study on the Reducing Measures to Reduce the Influence of Culvert Extension on Existing Lines in Loess Regions
Source abstract
Abstract
Due to the many constraint conditions, construction difficulties, and high control standards, and the impact of new line construction on existing lines, the construction of culvert extensions in widened sections of loess areas has become a form of control in railway construction projects. This work analyzes the technical difficulties of culvert extension construction schemes based on a practical engineering case. A scheme to provide culvert protection against slight disturbances is determined, and the construction schemes of the culvert extension structure and transition section filling are optimized. The rationality of culvert extension control measures and the influence of construction on the existing line are then studied based on the monitoring data for each stage. The results show that the implementation of the slight disturbance culvert protection has little influence on the existing line, and has the greatest influence during steel sheet pile construction (<0.5 mm). We symmetrically construct the culvert extension structures (transverse) and transition section filling (longitudinal and transverse) to effectively reduce the influence of differences in the deformation value between the two sides of the existing line at the same level as the existing line. The deformation of the upper side of the culvert fluctuates with the construction of the composite foundation and shows an overall upward trend, while the deformation increases first and then decreases in the transition section, and the deformation of the upper side of the culvert is larger than that of the transition section. The level gauge deformation of each side decreases abruptly at the filling stage of the bottom plate, side plate, top plate, and splayed wall. The settlement value of the level gauge of each station increases nonlinearly with the increase in the filling height of the transition section, and the settlement variation value of the transition section at each filling stage is higher than that of the upper side of the culvert.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Geotechnical Engineering and Underground Structures · Geotechnical Engineering and Analysis · Civil and Geotechnical Engineering Research
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070, China
Funding
the Gansu Youth Science and Technology Fund project · the Special Funds for Guiding Local Scientific and Technological Development by The Central Government · the Lanzhou Jiaotong University youth science foundation project
References (21)
Show source-provided references
1. A high-speed railway network dataset from train operation records and weather data10.1038/s41597-022-01349-8 ↗
2. Application of asphalt based materials in railway systems: A review10.1016/j.conbuildmat.2021.124630 ↗
3. Design theories and maintenance technologies of slab tracks for high-speed railways in China: A review10.1093/tse/tdab024 ↗
4. Field practice and ground settlement behaviors of a land creation case in loess area of China10.1007/s10064-022-02964-w ↗
5. The variation of load diffusion and ballast bed deformation with loading condition: An experiment study10.1080/23248378.2021.1897958 ↗
6. Study on settlement deformation of high fill foundation in large thickness loess area
7. Sun, L., Hopkins, T.C., and Beckham, T. (March, January 26). Load reduction by Geofoam for culvert extension: Numerical analysis. Proceedings of the GeoCongress 2006: Geotechnical Engineering in the Information Technology Age, Atlanta, America.10.1061/40803(187)221 ↗
8. Sun, L., Hopkins, T.C., and Beckham, T.L. (2005). Use of Ultra-Lightweight Geofoam to Reduce Stresses in Highway Culvert Extensions, University of Kentucky Transportation Center.
9. Study on Protection Scheme for Long-stay Construction of High-filled Culverts
10. Study on Key Technologies Applied to Bridges and Culverts of Added Second Line Railway
11. A New Engineering Method of Lengthening the Frame Bridges and Culverts in High-speed Railway
12. Skew Slab Culvert Lengthening Construction Technology in Existing Railway Line Based on Frame Culvert Lateral Jacking
13. Loess Geohazards Research in China: Advances and Challenges for Mega Engineering Projects10.1016/j.enggeo.2019.01.019 ↗
14. Numerical Back-analysis of Creep Settlement of Airport High Fill
15. Gao, S.F. (2001). Discussion on Technology for Connecting Newly Built Structure to Pristine Structure in Rebuilding of Tianjin Subway. J. China Railw. Soc., 47–147. (In Chinese).
16. Key Technology of Introducing Ballastless Track upon High-Speed Railway Subgrade
17. Analysis of Vertically Loaded Jet-Grout-Pile-Strengthened Piles of Expanded Cross-Section10.1680/jgeen.17.00059 ↗
18. Earth Pressure and Internal Forces of Tunnel Lining in Jet Grouting Reinforced Mud Stratum10.1007/s12205-021-2014-5 ↗
19. Jet-Grouting in Ground Improvement and Rotary Grouting Pile Installation: Theoretical Analysis
20. Gao, L., and Xu, Z. (2021). Model test study on deformation of snowflake shaped steel sheet pile based on OFDR. Sensors, 21.10.3390/s21217062 ↗
21. Effect of Large-Span Three-Sided Culvert Configuration on Its Performance at Service and Ultimate Loading Conditions10.1016/j.tust.2021.104346 ↗