journal article·2024-04-11Open access

Force Performance Analysis and Numerical Simulation of Assembled Ribbed-Slab Abutments

Qiaozhu He, Ying Sun, Yin Gu, Tong Wu

Applied Sciences· Volume 14· Issue 8

Abstract

This study investigates the structural performance of assembled rib-plate bridge abutments (ARBAs) with two different connection methods: bull leg bolt and flange connections. In addition, we explored the bending and shear performance of the connection parts and related areas to assess the damage characteristics and modes of these ARBAs. Utilizing model testing, a numerical analysis was conducted to define the force performance of the ARBA, with reference to a cast-in-place rib-plate abutment. The research results indicate that the bearing capacity and deformation capacity of the cap part of the assembled ribbed slab abutment model with cow leg connections are lower than those of the cast-in-place structure. When the structure fails, a 45° diagonal crack develops from the cross-section at the mid-span joint to the connection between the rib slab and the cap, until the concrete protective layer at the joint is crushed, exhibiting a shear failure mode. The bearing capacity of the assembly rib plate type abutment cap connected by the flange plate is basically the same as that of the cast-in-place structure, and the deformation capacity is weaker than that of the cast-in-place rib plate type abutment. The expansion of structural cracks is consistent with that of the rib plate type abutment connected by the cow leg. When the flange plate at the mid span is damaged, the contact surface between the flange plate and the concrete is pried off, resulting in the inability of the structure to continue bearing, exhibiting a shear failure mode. Through numerical simulation, taking the stress performance of the integral cast-in-place ribbed slab abutment as a reference, the assembled ribbed slab abutment connected by the flange plate is basically consistent with the integral cast-in-place ribbed slab abutment in terms of ultimate load, concrete damage, and steel reinforcement skeleton stress, and the connection device has not yet reached the yield state. The ultimate displacement is slightly weaker than that of the integral cast-in-place ribbed slab abutment. By comparison, it can be seen that the ultimate bearing capacity of the assembled ribbed slab abutment connected by the flange is basically the same as that of the cast-in-place ribbed slab abutment, and the stress performance can reach an “equivalent cast-in-place”, making it the preferred solution for the assembled abutment structure. The finite element parameter analysis of the flanged ARBA revealed that the thickness of the stiffening ribs, the number of bolts, and length of the flange plate anchoring steel plate were proportional to the ultimate load-bearing capacity of the prefabricated ARBA. In the case of no change in the structural damage mode, considering the economic benefits and load-bearing capacity of the structure, the following parameter combinations of the flanged ARBA are recommended: a thickness of 30 mm of the stiffening ribs, the number of bolts is 12, and a length of 50 cm of the length of flange plate anchoring steel plate.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Structural Behavior of Reinforced Concrete · Structural Response to Dynamic Loads · Structural Load-Bearing Analysis

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

College of Civil Engineering, Fuzhou University, Fuzhou 350108, China

The Sustainable and Innovative Bridge Engineering Research Center of Fujian Province University, Fuzhou 350108, China

Funding

National Natural Science Foundation of China

References (23)

Show source-provided references
1. Research on assembly building integration system based on BIM technology
2. Xue, L. (2016). Research on the Key Technology of Manufacturing Green Composite Concrete Girder Bridge, Northeastern University.
3. Khan, M.A. (2014). Accelerated Bridge Construction: Best Practices and Techniques, Butler Worth Heinemann.
4. Research progress of rapid construction bridge
5. Precast Posttensioned Abutment System and Precast Superstructure for Rapid On-Site Construction10.3141/1814-08 ↗
6. Static performance test of segmentally prefabricated prestressed concrete cover beam
7. Experimental study on flexural behavior of segmental precast large-cantilevered prestressed concrete cap beam10.1016/j.istruc.2023.105166 ↗
8. Bridge Precast Substructure Units [Z], 2004 NOVA Award Nomination 14.
9. All Precast Substructure Accelerates Construction of Prestressed Concrete Bridge in New Hampshire10.15554/pcij.05012005.26.39 ↗
10. (2006). Guidelines for Accelerated Bridge Construction Using Precast/Prestressed Concrete Components, PCI Northeast.
11. Palls, M.L., and Newman, P. (2008, January 15). Accelerated Bridge Design and Construction around the Country. Proceedings of the 15th Annual Caltrans/PCMAC Bridge Seminar, Sacramento, CA, USA.
12. Benoit, N.D., Calderwood, E.T., Frankhauser, W.L., Hanson, D.R., Heil, K.R., and Tweedie, J.J. (2005). Instant Bridge—Just Add Water.
13. Huh, B.P., and Low, J.P. (2004). Moose Creek Bridge, the First Field Application of Fully Prefabricated Bridges in Ontario.
14. Wolfe, R.W., Chung, P., and Dermegerdician, A. (2007). Accelerating Bridge Construction-Precast Abutment Solutions.
15. Experimental study on seismic performance of prefabricated columns with large-diameter high-strength steel bar grouted sleeve connection
16. Crawford, G.A., Parikh, H., and Thompson, J.A. (2006). Accelerated Replacement of a Three Span Bridge in Pennsylvania.
17. Cyclic performance and simplified pushover analyses of precast segmental concrete bridge columns with circular section10.1007/s11803-016-0323-3 ↗
18. Research progress on prefabricated assembled pier system and its seismic performance
19. Terry, J., Wipf, F., Klaiber, W., and Hockewman, S. (2009). Precast Concrete Elements for Accelerated Bridge Construction: Laboratory Testing of Precast Substructure Components, Bridge Engineering Center. Bone Country Bridge [R].
20. Terry, J., Wipf, F., Klaiber, W., and Hockewman, S. (2009). Precast Concrete Elements for Accelerated Bridge Construction: Laboratory Testing, Field Testing, Evaluation of a Precast Country Bridge, Bridge Engineering Center. [R].
21. He, D. (2011). Design Scheme and Finite Element Analysis of Cast-in-Place Assembled Bridge Abutment. [Master’s Thesis, Wuhan University of Technology].
22. Longitudinal load distribution of a weakly connected prefabricated bridge abutment10.1007/s00419-021-01995-1 ↗
23. (2012). Design Specification for Reinforced and Prestressed Concrete Bridges and Culverts for Highways (Standard No. JTG D62-2012).