Supplier Replacement Model in a One-Level Assembly System under Lead-Time Uncertainty
Source abstract
Abstract
Supplier selection/replacement strategies, purchasing price negotiation and optimized replenishment policies play a key role in efficient supply chain management in today’s dynamic market. Their importance increases even more in Industry 4.0. In this paper, we propose a joint model of replenishment planning and purchasing price negotiation in the context of supplier replacement in a one-level assembly system (OLAS) producing one type of finished product. The real component lead times are stochastic. There is consequently a non-negligible risk that the assembly process may be stopped if all components for assembly are not delivered on the due date. This incurs inventory-related costs, holding and backlogging, which should be minimized. We consider a set of suppliers characterized by their prices and the probability distributions of their lead-times, and we present a model and an approach that optimize not only replenishment policy, but also purchasing prices. For a given unit, it is possible to model several alternative suppliers with alternative pricing and lead-time uncertainties, and evaluate their impacts on the total cost: composed of holding, backlogging and purchasing costs for the assembly system. The findings of this study indicate that it can be beneficial to pay suppliers an additional purchase cost in order to reduce the holding and backlogging costs related to uncertainty. In consequence, decision makers can use the proposed approach to negotiate prices and delivery delays or to select suppliers.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Supply Chain and Inventory Management · Sustainable Supply Chain Management · Quality and Supply Management
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
University of Champagne, University of Technology of Troyes, CNRS, ICD/LOSI. 12 rue Marie Curie, 10010 Troyes, France
Department of Manufacturing Sciences and Logistics, Mines Saint-Étienne, Univ Clermont Auvergne, UMR-CNRS 6158 LIMOS, CMP, 880 route de Mimet, F-13541 Gardanne, France
IMT Atlantique, LS2N, UMR-CNRS 6004, La Chantrerie, 4 rue Alfred Kastler, 44300 Nantes, France
References (59)
Show source-provided references
1. A hybrid evolutionary model for supplier assessment and selection in inbound logistics10.1016/j.jal.2014.11.007 ↗
2. Sourcing decisions with stochastic supplier reliability and stochastic demand10.1111/j.1937-5956.2009.01022.x ↗
3. Optimal supply planning in MRP environments for assembly systems with random component procurement times10.1080/00207540802273827 ↗
4. A simulation study of predictable due-date10.1287/mnsc.25.4.363 ↗
5. Setting planned leadtimes in serial production systems with tardiness costs10.1287/mnsc.33.1.95 ↗
6. Optimal leadtimes planning in a serial production system10.1287/mnsc.40.5.629 ↗
7. Optimal leadtimes planning in serial production systems with earliness and tardiness costs10.1080/07408170208928865 ↗
8. Stochastic leadtimes in two-level assembly systems10.1080/07408178708975409 ↗
9. Component inventory cost in an assembly problem with uncertain supplier Lead-Times10.1080/07408178908966214 ↗
10. Supply management in assembly systems10.1002/1520-6750(199312)40:7<933::AID-NAV3220400706>3.0.CO;2-8 ↗
11. Due date setting with supply constraints in systems using MRP10.1016/S0360-8352(01)00007-9 ↗
12. Setting procurement safety lead-times for assembly systems10.1080/00207540110061625 ↗
13. Optimal order policies in assembly systems with random demand and random supplier delivery10.1080/15458830.1996.11770740 ↗
14. Genetic algorithm for supply planning in two-level assembly systems with random lead times10.1016/j.engappai.2008.10.012 ↗
15. Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times10.1016/j.cor.2009.06.002 ↗
16. A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times
17. Multi-objective supply planning for two-level assembly systems with stochastic lead times10.1016/j.cor.2011.07.021 ↗
18. Optimal order release dates for two-level assembly systems with stochastic lead times at each level10.1080/00207543.2018.1449268 ↗
19. Guiras, Z., Turki, S., Rezg, N., and Dolgui, A. (2018). Optimization of two-level disassembly/remanufacturing/assembly system with an integrated maintenance strategy. Appl. Sci., 8.10.3390/app8050666 ↗
20. Optimal maintenance plan for two-level assembly system and risk study of machine failure10.1080/00207543.2018.1521017 ↗
21. Planning order releases for an assembly system with random operation times10.1007/s00291-004-0186-2 ↗
22. Planned lead times optimization for multi-level assembly systems under uncertainties10.1016/j.omega.2017.11.004 ↗
23. Setting optimal planned leadtimes in configure-to-order assembly systems10.1016/j.ejor.2018.08.036 ↗
24. Heuristic policies for inventory ordering problems with long and randomly varying lead times10.1016/0272-6963(81)90008-5 ↗
25. (s, S) policies for a dynamic inventory model with stochastic lead times10.1287/opre.32.1.121 ↗
26. Stock control when the lead time cannot be considered constant10.1057/jors.1979.71 ↗
27. Effect of lead time on inventory: A static analysis10.1057/jors.1975.61 ↗
28. Inventory management for stochastic lead times with order crossovers10.1016/j.ejor.2015.07.047 ↗
29. Optimal and approximate policies for inventory systems with order crossover10.1111/j.2158-1592.2011.01015.x ↗
30. Inventory management with an exogenous supply process10.1287/opre.1090.0706 ↗
31. Consequences of order crossover under order-up-to inventory policies10.1287/msom.3.3.175.9887 ↗
32. Graves, S. (1993). Logistics of Production and Inventory. Handbooks in Operations Research and Management Science, Elsevier.
33. A state of the art on supply planning and inventory control under lead time uncertainty10.24846/v22i3y201302 ↗
34. The EOQ model under stochastic lead times10.1287/opre.27.2.391 ↗
35. An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead times10.1016/S0377-2217(96)00230-5 ↗
36. Optimal time phasing and periodicity for MRP with POQ policy10.1016/j.ijpe.2010.04.042 ↗
37. A model for supply planning under lead time uncertainty10.1016/S0925-5273(00)00180-8 ↗
38. The MPS Parametrization under Lead Time Uncertainty10.1016/j.ijpe.2003.08.008 ↗
39. Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm10.1016/j.ejor.2007.11.066 ↗
40. A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint
41. Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint10.1016/j.ijpe.2011.02.009 ↗
42. A study on MRP with using leads time, order quality and service level over a single inventory
43. Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system10.1080/002075497195498 ↗
44. Component procurement and end product assembly in an uncertain supply and demand environment10.1080/00207543.2014.951522 ↗
45. Yao, M., and Minner, S. (2017). Review of multi-supplier inventory models in supply chain management: An update. SSRN Electron. J.10.2139/ssrn.2995134 ↗
46. Yano, C.A., and Gilbert, S.M. (2005). Coordinated pricing and production/procurement decisions: A review. Managing Business Interfaces, Springer.10.1007/0-387-25002-6_3 ↗
47. Chan, L.M., Shen, Z.M., Simchi-Levi, D., and Swann, J.L. (2004). Coordination of pricing and inventory decisions: A survey and classification. Handbook of Quantitative Supply Chain Analysis, Springer.10.1007/978-1-4020-7953-5_9 ↗
48. Dynamic pricing in the presence of inventory considerations: Research overview, current practices, and future directions10.1287/mnsc.49.10.1287.17315 ↗
49. Golmohammadi, A., and Hassini, E. (2020). Review of supplier diversification and pricing strategies under random supply and demand. Int. J. Prod. Res., 1–33.10.1080/00207543.2019.1705419 ↗
50. Diversification under supply uncertainty10.1287/mnsc.39.8.944 ↗
51. Supply management in assembly systems with random yield and random demand10.1080/07408170008967428 ↗
52. Optimal product pricing and component production quantities for an assembly system under supply uncertainty10.1287/opre.1100.0870 ↗
53. Generalized newsboy model to compute the optimal planned lead times in assembly systems10.1080/00207540210158825 ↗
54. Integration of additional purchase cost to reduce the lead time uncertainty for one level assembly system
55. Golberg, D. (1989). Genetic Algorithms in Search, Optimisation and Machine Learning, Addison Wesley.
56. Holland, J. (1975). Adaptation in Natural and Artificial Systems, University of Michigan Press.
57. Setting planned leadtimes in customer-order-driven assembly systems10.1287/msom.2015.0565 ↗
58. Newsvendor equations for production networks10.1016/j.orl.2018.10.006 ↗
59. Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result10.1080/00207540500371881 ↗