7-Score Function for Assessing the Strength of Association Rules Applied for Construction Risk Quantifying
Source abstract
Abstract
There are several factors influencing the time of construction project execution. The properties of the planned structure, the details of an order, and macroeconomic factors affect the project completion time. Every construction project is unique, but the data collected from previously completed projects help to plan the new one. The association analysis is a suitable tool for uncovering the rules—showing the influence of some factors appearing simultaneously. The input data to the association analysis must be preprocessed—every feature influencing the duration of the project must be divided into ranges. The number of features and the number of ranges (for each feature) create a very complicated combinatorial problem. The authors applied a metaheuristic tabu search algorithm to find the acceptable thresholds in the association analysis, increasing the strength of the rules found. The increase in the strength of the rules can help clients to avoid unfavorable sets of features, which in the past—with high confidence—significantly delayed projects. The new 7-score method can be used in various industries. This article shows its application to reduce the risk of a road construction contract delay. Importantly, the method is not based on expert opinions, but on historical data.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: BIM and Construction Integration · Construction Project Management and Performance · Resource-Constrained Project Scheduling
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Department of Production Engineering and Construction Management, Faculty of Civil Engineering, Institute of Building Engineering, Warsaw University of Technology, 00-637 Warsaw, Poland
References (51)
Show source-provided references
1. Managing Delays in Construction Projects Aiming at Cost Overrun Minimization10.1088/1757-899X/603/3/032004 ↗
2. Anysz, H. (2017). Wykorzystanie Sztucznych Sieci Neuronowych Do Oceny Możliwości Wystąpienia Opóźnień w Realizacji Kontraktów Budowlanych. [Ph.D. Thesis, Oficyna Wydawnicza PW].
3. Kulejewski, J., Ibadov, N., Rosłon, J., and Zawistowski, J. (2021). Cash Flow Optimization for Renewable Energy Construction Projects with a New Approach to Critical Chain Scheduling. Energies, 14.10.3390/en14185795 ↗
4. Construction Delays in Clients Opinion–Multivariate Statistical Analysis10.1016/j.proeng.2015.10.075 ↗
5. Determination of the Risk Factors Impact on the Construction Projects Implementation Using Fuzzy Sets Theory10.12693/APhysPolA.130.107 ↗
6. A concise review of methods of construction works duration assessment
7. KASS v.2.2. Scheduling Software for Construction with Optimization Criteria Description10.12693/APhysPolA.130.1439 ↗
8. Selection of Construction Project Taking into Account Technological and Organizational Risk10.12693/APhysPolA.132.974 ↗
9. Classification of the Bid/No Bid Criteria–Factor Analysis10.1515/ace-2015-0037 ↗
10. The assessment of construction project risks with the use of fuzzy sets theory
11. Chatterjee, K., Zavadskas, E.K., Tamosaitiene, J., Adhikary, K., and Kar, S. (2018). A Hybrid MCDM Technique for Risk Management in Construction Projects. Symmetry, 10.10.3390/sym10020046 ↗
12. Kowalski, J., Połoński, M., Lendo-Siwicka, M., Trach, R., and Wrzesiński, G. (2021). Method of Assessing the Risk of Implementing Railway Investments in Terms of the Cost of Their Implementation. Sustainability, 13.10.3390/su132313085 ↗
13. Nawaz, A., Waqar, A., Shah, S.A.R., Sajid, M., and Khalid, M.I. (2019). An innovative framework for risk management in construction projects in developing countries: Evidence from Pakistan. Risks, 7.10.3390/risks7010024 ↗
14. PMI (2019). Guide to the Project Management Body of Knowledge (PMBoK Guide), Project Management Institute.
15. Yaseen, Z.M., Ali, Z.H., Salih, S.Q., and Al-Ansari, N. (2020). Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model. Sustainability, 12.10.3390/su12041514 ↗
16. Risk management framework for construction projects in developing countries10.1080/0144619032000124689 ↗
17. Risk Management in Construction Project Management10.3846/16111699.2006.9636126 ↗
18. Identification of Risk Management System in Construction Industry in Pakistan10.1061/(ASCE)ME.1943-5479.0000122 ↗
19. A DST-based approach for construction project risk analysis10.1057/jors.2013.38 ↗
20. Risk management in construction projects: A knowledge-based approach10.1016/j.sbspro.2014.03.073 ↗
21. Construction project risk assessment by using adaptive-network-based fuzzy inference system: An empirical study10.1007/s12205-014-0139-5 ↗
22. Risk management in construction projects10.3846/20294913.2014.994582 ↗
23. Vafadarnikjoo, A., Mobin, M., and Firouzabadi, S.M.A.K. (2016, January 8–10). An intuitionistic fuzzy-based DEMATEL to rank risks of construction projects. Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management, Kuala Lumpur, Malaysia.
24. Success factors for Taiwanese contractors collaborating with local Chinese contractors in construction projects10.3846/16111699.2015.1137486 ↗
25. Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects10.3846/13923730.2015.1068847 ↗
26. Li, J., Wang, J., Xu, N., Hu, Y., and Cui, C. (2018). Importance Degree Research of Safety Risk Management Processes of Urban Rail Transit Based on Text Mining Method. Information, 9.10.3390/info9020026 ↗
27. The association analysis for risk evaluation of significant delay occurrence in the completion date of construction project10.1007/s13762-018-1892-7 ↗
28. Morzy, T. (2013). Eksploracja Danych. Metody i Algorytmy, Wydawnictwo Naukowe PWN.
29. Larose, D.T., and Larose, C.D. (2016). Discovering Knowledge in Data, John Wiley & Sons.
30. (2021, November 20). Statsoft Electronic Statistics Textbook. Available online: https://www.statsoft.pl/textbook/stathome.html.
31. Introduction to arules–Mining Association Rules and Frequent Item Sets
32. Market basket analysis with association rules
33. Sequential Pattern Discovery Algorithm for Malaysia Rainfall Prediction10.12693/APhysPolA.128.B-324 ↗
34. Market basket analysis in insurance industry10.5267/j.msl.2015.2.004 ↗
35. Profiling of High-Frequency Accident Locations by Use of Association Rules10.3141/1840-14 ↗
36. Association rule analysis of factors contributing to extraordinarily severe traffic crashes in China10.1016/j.jsr.2018.09.013 ↗
37. Identifying factors and conditions contributing to cyclists’ serious accidents with the use of association analysis
38. Anysz, H., Apollo, M., and Grzyl, B. (2021). Quantitative Risk Assessment in Construction Disputes Based on Machine Learning Tools. Symmetry, 13.10.3390/sym13050744 ↗
39. Association analysis for oxalate concentration in spinach10.1007/s10681-016-1740-0 ↗
40. Klimanek, T., Szymkowiak, M., and Józefowski, T. (2018). Analiza koszykowa w badaniu zjawiska niepełnosprawności biologicznej. Pr. Nauk. Uniw. Ekon. Wrocławiu, 95–105.10.15611/pn.2018.507.09 ↗
41. Association Analysis Techniques for Bioinformatics Problems10.1007/978-3-642-00727-9_1 ↗
42. Analiza Asocjacji I Reguły Asocjacyjne W Badaniu Wyborów Zajęć Dydaktycznych Dokonywanych Przez Studentów. Zastosowanie Algorytmu Apriori
43. Comparison of ANN Classifier to the Neuro-Fuzzy System for Collusion Detection in the Tender Procedures of Road Construction Sector10.1088/1757-899X/471/11/112064 ↗
44. The quality management in precast concrete production and delivery processes supported by association analysis10.1007/s13762-019-02597-9 ↗
45. The multi-mode resource constrained project scheduling problem in construction. State of the art review and research challenges
46. Construction Projects’ Indicators Improvement Using Selected Metaheuristic Algorithms10.1016/j.proeng.2016.08.198 ↗
47. Profit optimization for multi-mode repetitive construction project with cash flows using metaheuristics10.1007/s43452-021-00218-2 ↗
48. A Tabu Search Algorithm for the Power System Islanding Problem10.3390/en81011315 ↗
49. Choi, J., Xuelei, J., and Jeong, W. (2018). Optimizing the Construction Job Site Vehicle Scheduling Problem. Sustainability, 10.10.3390/su10051381 ↗
50. Fridgeirsson, T.V., and Rosłon, J. (2017). Optimisation of Construction Processes, Civil Engineering Faculty of Warsaw, University of Technology.
51. Böde, K., Różycka, A., and Nowak, P. (2020). Development of a Pragmatic IT Concept for a Construction Company. Sustainability, 12.10.3390/su12177142 ↗