Ground Stability Analysis in Non-Open-Cut Tunneling Method Using Small-Diameter Steel Pipe Piles
Source abstract
Abstract
The non-open-cut method is used for constructing tunnels under existing roads without blocking traffic. Various non-open-cut methods use pipe roofs made of medium- and large-diameter steel pipe piles. However, the risk of ground settlement or heave is involved during the application of such piles. Therefore, research is conducted through model tests and numerical analysis on the non-open-cut method to investigate these problems using small-diameter piles. The progress of tunnel construction is divided into two repetitive steps. The first step (Stage 1) involves pulling back the pressure panel, and the second step involves propelling the precast structure (Stage 2). The behaviors of the pipe piles and ground displacement are analyzed according to the cover depth, tunnel size, existence and nonexistence of the shoe structure, and progress of tunnel construction. Small-diameter piles reduce the displacement during both stages. With a decrease in cover depth, the stress acting on the pile decreases during Stage 1 and increases during Stage 2. The presence of the shoe structure reduces the stress on the pile during both stages. The ground behavior based on the construction progress indicates that the ground settlement increases during Stage 1; however, no correlation is observed during Stage 2 at low depth.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Geotechnical Engineering and Analysis · Geotechnical Engineering and Underground Structures · Rock Mechanics and Modeling
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Department of Urban Infrastructure Research, Seoul Institute of Technology, 7F 37 Maebongsan-ro, Mapo-gu, Seoul 03909, Korea
Structural and Seismic Technology Group, KEPCO Research Institute, 105 Munji-ro, Yuseong-gu, Daejeon 34056, Korea
Department of Mining Engineering, Baluchistan University of Information Technology Engineering and Management Sciences (BUITEMS), Quetta 87300, Pakistan
Department of Civil and Environmental Engineering, Hanyang University, 55 Hanyangdaehak-ro, Sangnok-gu, Ansan 15588, Korea
References (14)
Show source-provided references
1. Choi, W.I. (2016). Stress Release Zone Characteristics and Reinforcement Around Sub-Structure Constructed by Non-open Cut Method Under Railway. [Ph.D. Thesis, Department of Railway System, Seoul National University of Science and Technology].
2. Dassault Systemes Simulia Corp (2015, July 05). Abaqus/CAE User’s Manual. Available online: http://130.149.89.49:2080/v2016/books/usi/default.htm.
3. (2012). The Improvement of Management System of Crossing Road Construction in Non-Open-Cut Method, Korea Expressway Corporation (KEC).
4. A case study on the safety and measurement of non-open-cut underground roads. The Safety Technology10.5124/jkma.2014.57.1.34 ↗
5. Eum, K.Y., Shin, M.H., and Kim, J.H. (2001, January 25–26). The analysis of ground behavior on the crossing construction under railroad using field measurement. Proceedings of the Korean Society for Railway, Suwon, Korea.
6. Estimation of RPS method using three-dimensional numerical analysis
7. Eum, K.Y., Kim, Y.H., Park, Y.G., and Jeon, S.S. (2017, January 18–20). Displacement analysis in each excavation stage using field data obtained from measuring instrument Front-jacking method application. Proceedings of the Korean Society for Railway, Busan, Korea.
8. A study on the comparison by the methods of estimating the relaxation load of SEM-pile
9. Shin, E.C., Kim, J.H., Lee, E.S., and Roh, J.M. (2005, January 19–20). Three-dimensional numerical analysis of crossing tunnel under railroad using RPS method. Proceedings of the Korean Society for Railway, Uiwang, Korea.
10. Lee, Y.K., Kim, S.K., and Kim, H.G. (2012, January 24–26). A Study on Seismic Performance Evaluation of the Buried Box Structures with Pipe Roof. Proceedings of the Korean Society of Civil Engineers Convention, Gwangju, Korea.
11. Eum, K.Y., Jeon, S.S., Yun, J.H., and Park, S.K. (2017, January 18–20). Simulation of ground behavior induced by applying large diameter steel pipe jacking method. Proceedings of the Korean Society for Railway, Busan, Korea.
12. Optimum design section of non-open cut underpass construction method, super equilibrium method (SEM) by numerical analysis10.24284/JKOSUR.2018.09.6.3.139 ↗
13. Kim, D.K. (2004). Proposal of Design Method for Umbrella Arch Method Used in NATM Tunnel. [Master’s Thesis, Pusan National University].
14. Petrova, R. (2016). Perusal of the Finite Element Method, InTech. Web of Science.10.5772/62611 ↗