Fatigue assessments of bridges depend on vehicle interactions, occurring when several vehicles travel simultaneously on the bridge or when two individual stress histories, caused by vehicles traveling in different times, generate a more damaging combined stress history. When interactions are significant, stress histories cannot be directly determined using conventional fatigue load models provided in Codes, unless suitable theoretical models for vehicle interactions are available. In the paper, original approaches are proposed to study different aspects of the problem. Concerning interactions due to simultaneity, the novelty is to consider the bridge a service system. Since the process of vehicle arrivals is a Markov process, vehicle interactions can be studied in the framework of the queuing theory. In this way, in the appropriate context, interacting vehicles are equivalent to queued requests (vehicles) in the service system. The method considers two subcases, to be tackled in the given sequence, so that the solution is noticeably simplified. The first subcase refers to vehicles traveling simultaneously in one lane; the second subcase to vehicle and vehicle convoys traveling simultaneously on two or more lanes. In the first subcase the problem is solved considering each lane as a single channel system with a waiting queue, where the number of vehicles in the queue and the waiting time, depending on the number of vehicles in the queue, are limited. A modified vehicle flow on each bridge lane is thus obtained, composed by vehicles and vehicle convoys separately traveling the lane, which is, if relevant, the input for the second subcase. In the second subcase the multilane bridge is modeled as a multichannel system without the waiting queue. When the number of requests exceeds the number of channels, r , the surplus is lost and cannot reenter the system. The results regarding simultaneity are much more relevant than it appears at the first sight: Two relevant examples demonstrated that they can be fruitfully used to implement optimized Monte Carlo algorithms for artificial traffic generation, as well for adaptation of traffic measurements, when flows are modified. Finally, a “non-interacting traffic flow” is obtained, whose elements (vehicle, vehicle convoy, cluster of vehicles) travel individually on the bridge. The global stress history results thus a mere random assembly of the stress histories induced by each element of the non-interacting traffic flow. These stress histories can only combine, as simultaneity interactions are excluded for them. Combination of stress histories is a complex issue, especially when, as in the Eurocodes, fatigue load models are composed by a set of standardized lorries. In fact, questions concerning: Conditions for the combination; stress history which can combine; expected number of occurrences of combined stress histories and of the remaining individual ones; are still open. Really, they can be tackled resorting to sophisticated and time-consuming simulations based on Monte Carlo methods, but elementary solutions have not been proposed so far. The original method proposed here, whose practical application is illustrated referring to an important case study, allows to solve the problem providing simple recursive formulae. Finally, two relevant examples illustrate, with specific reference to the Eurocodes, some important implications of the study.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Transport Systems and Technology · Infrastructure Maintenance and Monitoring · Asphalt Pavement Performance Evaluation
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Department of Civil and Industrial Engineering, University of Pisa; 56122 Pisa, Italy
References (45)
Show source-provided references
1. Road traffic considered as a random series10.1680/ijoti.1936.14802 ↗
2. Queue length estimation from probe vehicle location and the impacts of sample size10.1016/j.ejor.2008.06.024 ↗
3. Drew, D.R. (1968). Traffic Flow Theory and Control, McGraw-Hill Book Co.
4. Gerlough, D.L. (1955). Use of Poisson Distribution in Highway Traffic, The Eno Foundation for Highway Traffic Control.
5. Vehicle arrivals characteristic at urban uncontrolled intersections10.1061/(ASCE)0733-947X(1995)121:4(317) ↗
6. Schuhl, A. (1955). The Probability Theory Applied to Distribution of Vehicles on Two Lane Highways. Poisson and Traffic, The Eno Foundation for Highway Traffic Control.
7. Modeling conflicts of heterogeneous traffic at urban uncontrolled intersections10.1061/(ASCE)0733-947X(1998)124:1(23) ↗
8. Stochastic model for multilane traffic effects on bridges10.1061/(ASCE)1084-0702(2001)6:2(136) ↗
9. Modeling same-direction two-lane traffic for bridge loading10.1016/j.strusafe.2011.04.004 ↗
10. Madajag, A.F. (1968). Metal Fatigue: Theory and Design, John Wiley & Sons.
11. BS5400 (1980). Steel Concrete and Composite Bridges—Part 10—Code of Practice for Fatigue, British Standards Institution (BSI).
12. A new definition of the rainflow cycle counting method10.1016/0142-1123(87)90054-5 ↗
13. Bruls, A., Croce, P., Sanpaolesi, L., Sedlacek, G., and International Association for Bridge and Structural Engineering (1996, January 27–29). ENV 1991—Part 3: Traffic Loads on Bridges. Calibration of Road Load Models for Road Bridges. Proceedings of the IABSE Colloquium “Basis of Design and Actions on Structures. Background and Application of Eurocode 1”, Delft, The Netherlands.
14. Background to Fatigue Load Models for Eurocode 1: Part 2 Traffic Loads
15. Fatigue failure predictions for complicated stress-strain histories
16. Simple rainflow counting algorithms10.1016/0142-1123(82)90018-4 ↗
17. EN1993-1-9 (2005). Eurocode 3: Design of Steel Structures—Part 1–9: Fatigue, CEN.
18. A modified rainflow counting method10.1016/0142-1123(91)90481-D ↗
19. ASM Handbook 19 (1996). Fatigue and Fracture, ASM International.
20. Matsuishi, M., and Endo, T. (1968). Fatigue of Metals Subjected to Varying Stress, The Japan Society of Mechanical Engineering.
21. EN1991-2 (2003). Eurocode 1: Actions on Structures—Part 2: Traffic Loads on Bridges, CEN.
22. A comparison of three methods for selecting values of input variables in the analysis of output from a computer code
23. Fatigue analysis of long-span suspension bridges under multiple loading: Case study10.1016/j.engstruct.2011.08.027 ↗
24. Fatigue reliability assessment of steel bridge details integrating weigh-in-motion data and probabilistic finite element analysis10.1016/j.compstruc.2012.09.002 ↗
25. The theory of probabilities and telephone conversation
26. Solution of some problems in the theory of probabilities of significance in automatic telephone exchanges
27. Brockmeyer, E., Halstrøm, H.L., and Jensen, A. (1948). The Life and Works of A.K. Erlang, The Copenhagen Telephone Co.
28. Jensen, A. (1957). Probability Theory in Telephone Transmission Proceedings of the 1st International Congress on the Application of the Theory of Probability in Telephone Engineering and Administration, Copenhagen, Denmark, 20–23 June 1955, Teleteknik.
29. Ross, S.M. (1996). Stochastic Processes, John Wiley & Sons. [2nd ed.].
30. Ventsel, E.S. (1983). Probability Theory, MIR.
31. Kleinrock, L. (1975). Queueing Systems, Volume I: Theory, John Wiley & Sons.
32. Morse, P.M. (1958). Queues, Inventories and Maintenance: The Analysis of Operational Systems with Variable Demand and Supply, Dover Publications Inc.
33. Queueing theory in manufacturing: A survey10.1016/S0278-6125(99)80033-8 ↗
34. Simultaneous determination of preventive maintenance and replacement policies in a queue-like production system with minimal repair10.1016/S0951-8320(98)00035-0 ↗
35. Application of queueing theory in health care: A literature review10.1016/j.orhc.2013.03.002 ↗
36. Queues with system disasters and impatient customers when system is down10.1007/s11134-007-9031-z ↗
37. Metamodels for estimating waterway delays through series of queues10.1016/S0191-2615(97)00003-9 ↗
38. A closed queueing maintenance network for a flexible manufacturing system10.1016/0026-2714(94)90127-9 ↗
39. The development of intervention programs for inland waterway networks using genetic algorithms10.1080/15732479.2017.1373299 ↗
40. Caspeele, R., Taerwe, L., and Frangopol, D.M. (2018, January 28–31). Scheduling of waterways maintenance interventions applying queueing theory. Proceedings of the 2018 IALCEE Conference, Ghent, Belgium.
41. Marsili, F., Bödefeld, H., Daduna, H., and Croce, P. (2019, January 26–30). Assessing the risk of disregarding urgent maintenance interventions on waterways infrastructures. Proceedings of the 13th International Conference on Applications of Statistics and Probability in Civil Engineering, ICASP 2019, Seoul, Korea.
42. Fatigue behavior of stiffener to cross beam joints in orthotropic steel decks10.1016/j.proeng.2015.02.014 ↗
43. Croce, P. (2010, January 22–24). Improvement of damage equivalence λ-factors for railway steel bridges. Proceedings of the 34th International Symposium on Bridge and Structural Engineering: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy.10.2749/222137810796024862 ↗
44. Die Lebensdauer von Kugellagern
45. Cumulative damage in fatigue10.1115/1.4009458 ↗