Ballasted Track Status Evaluation Based on Apparent Track Stiffness Index

Bongsik Park, Yeong-Tae Choi, Sung Ho Hwang

Applied Sciences· Volume 10· Issue 14

Abstract

Currently, maintenance work for ballasted track is performed based on the Track Quality Index (TQI) without a fundamental cause investigation for track irregularity. In this study, a new evaluation standard for ballasted track status is proposed to overcome the limitations of current maintenance work. The new evaluation standard is based on the stiffness index. The stiffness index is defined as the difference between the average and standard deviation of the apparent track stiffness determined by a light falling weight deflectometer (LFWD). After some field tests and analysis, it is shown that the stiffness index has a strong correlation not only with TQI but also with maintenance history. In verification results, the new evaluation standard estimated the ballasted track status quite well.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Railway Engineering and Dynamics · Civil and Geotechnical Engineering Research · Asphalt Pavement Performance Evaluation

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Korea Railroad Research Institute (KRRI), 176, Cheoldobangmulgwan-ro, Uiwang-si, Gyeonggi-do 16105, Korea

Funding

Ministry of Science and Information and Communications Technologies

References (15)

Show source-provided references
1. Korea Rail Network Authority (2015). Railway Track Maintenance Guidelines, Korea Rail Network Authority.
2. Railroad ballast evaluation using ground-penetrating radar: Laboratory investigation and field validation10.3141/2159-14 ↗
3. Zhang, Y., Venkatachalam, A.S., Xie, Y., Wang, G., and Xia, T. (2014, January 19–23). Data analysis technique to leverage ground penetrating radar ballast inspection performance. Proceedings of the IEEE Radar Conference, Cincinnati, OH, USA.10.1109/RADAR.2014.6875636 ↗
4. Geotechnical properties of ballast and the role of geosynthetics in rail track stabilization10.1680/grim.2006.10.3.91 ↗
5. Smekal, A., Berggren, E.G., and Silvast, M. (2006, January 4–8). Monitoring and substructure condition assessment of existing railway lines for upgrading to higher axle loads and speeds. Proceedings of the 7th World Congress on Railway Research, Montreal, QC, Canada.
6. EUROBALT optimises ballasted track
7. Lichtberger, B. (2005). Track Compendium: Formation, Permanent Way, Maintenance, Economics, Eurail Press.
8. Track stiffness and the vertical track geometry deterioration modeling
9. Influence of track stiffness on track behaviour under vertical load10.7307/ptt.v24i5.1176 ↗
10. Berggren, E.G. (2009). Railway Track Stiffness: Dynamic Measurement and Evaluation for Efficient Maintenance. [Ph.D. Thesis, KTH Royal Institute of Technology].
11. Recent tendencies in ballasted track maintenance
12. Study on the appropriateness of track maintenance works through the evaluation of trackbed conditions
13. Evaluation of applicability of apparent track stiffness measured by light-weight deflectometer as a ballasted track condition index
14. Evaluation of apparent track stiffness according to loading level: Light-weight deflectometer and train loading10.7782/JKSR.2018.21.7.690 ↗
15. Fundamental non-linear track load-deflection behavior for condition evaluation10.3141/1742-08 ↗