Smooth Obstacle-Avoidance Trajectory Planning for Cable Cranes During Concrete Hoisting in Arch Dam Construction
Source abstract
Abstract
The cable crane is the core hoisting equipment for high arch dam construction, and its hoisting trajectory is critical for both operational efficiency and safety. However, current trajectory planning does not adequately consider the underactuated characteristics of the cable crane. For instance, sudden stops or abrupt changes in direction can easily induce large swings of the bucket, causing safety risks and equipment wear. To address this issue, this paper developed a trajectory planning model for obstacle avoidance with smooth transitions in cable crane hoisting for arch dams and solved the high-dimensional optimization problem using a path–velocity decoupling strategy. First, a shortest path with geometrical conciseness and free collision was generated based on an improved A* algorithm to reduce the frequency of directional changes. Next, for different hoisting scenarios, segmented S-curve and polynomial velocity functions were proposed to ensure smooth velocity transitions. Then, an orthogonal experimental design was employed to generate a cluster of candidate trajectories that meet kinematic constraints, from which the optimal trajectory was selected using a multi-objective evaluation function. The results demonstrate that the motion trajectory planned using the proposed method is notably smoother. Compared with the traditional trapezoidal velocity method, it reduces the maximum swing amplitude of the bucket by 40.78% at a modest time cost. In real-time obstacle avoidance scenarios, the approach outperforms emergency-stop strategies, reducing the bucket’s maximum swing amplitude by 30.48%. This work will provide a reference for engineers to optimize the trajectory of large lifting equipment in construction fields such as high arch dams and bridges.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Tunneling and Rock Mechanics · Geotechnical and Geomechanical Engineering · BIM and Construction Integration
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Key Laboratory of Intelligent Health Perception and Ecological Restoration of Rivers and Lakes, Ministry of Education, Hubei University of Technology, Wuhan 430068, China
Funding
Doctoral Research Start-up Fund of Hubei University of Technology
References (36)
Show source-provided references
1. Valley Deformation Analysis for a High Arch Dam in Jinsha River, China10.1007/s12517-021-07719-7 ↗
2. Optimal Scheduling Method of Multi-Cable Crane Operation for Dam Jump Pouring
3. Automatic Planning for Cable Crane Operations in Concrete Dam Construction10.1061/JCEMD4.COENG-15107 ↗
4. Key Technologies in the Design and Construction of 300m Ultra-High Arch Dams10.1016/J.ENG.2016.03.012 ↗
5. Liang, Z., Peng, J., Zhao, C., Zhou, H., Li, D., Zhou, Y., Liu, Q., Li, X., Zhang, C., and Wang, F. (2025). Modelling and Simulation of the Block Pouring Construction System Considering Spatial–Temporal Conflict of Construction Machinery in Arch Dams. Sci. Rep., 15.10.1038/s41598-025-09998-6 ↗
6. Simulation of Spatial Conflict during Cross Operation in Dam Construction
7. Estimating the Frequency of Exposure to Uncertain Hazards: Impact of Wind Conditions on Concrete Dam Construction10.1061/(ASCE)CO.1943-7862.0001972 ↗
8. Integrated BIM-Based Simulation for Automated Time-Space Conflict Management in Construction Projects10.1016/j.autcon.2021.103957 ↗
9. High Arch Dam Cable Transport Efficiency and Safety Analysis Based on Real-Time Monitoring Technology10.1088/1755-1315/218/1/012078 ↗
10. Ground-Based InSAR and GNSS Integration for Enhanced Dam Monitoring10.1007/s12518-025-00622-w ↗
11. Coarse Sediment Dynamics and Low-Head Dams: Monitoring Instantaneous Bedload Transport Using a Stationary RFID Antenna10.1016/j.jenvman.2021.113671 ↗
12. A Visualization System for Dam Safety Monitoring with Application of Digital Twin Platform10.1016/j.eswa.2025.126740 ↗
13. A Location Based Service Approach for Collision Warning Systems in Concrete Dam Construction10.1016/j.ssci.2012.08.006 ↗
14. Vision-Based Productivity Analysis of Cable Crane Transportation Using Augmented Reality–Based Synthetic Image10.1061/(ASCE)CP.1943-5487.0000994 ↗
15. Productivity Analysis of Cable Crane Transportation Based on Visual Tracking and Pattern Recognition
16. Optimizing GPS-Guidance Transit Route for Cable Crane Collision Avoidance Using Artificial Immune Algorithm10.1007/s10291-016-0573-6 ↗
17. Huang, Z., and Wu, H. (2021, January 29–31). Overview of Trajectory Planning Methods for Robot Systems. Proceedings of the 2021 IEEE International Conference on Power, Intelligent Computing and Systems (ICPICS), Shenyang, China.10.1109/ICPICS52425.2021.9524117 ↗
18. Zhao, Y., Lin, H.-C., and Tomizuka, M. (2018, January 18–21). Efficient Trajectory Optimization for Robot Motion Planning. Proceedings of the 2018 15th International Conference on Control, Automation, Robotics and Vision (ICARCV), Singapore.10.1109/ICARCV.2018.8581059 ↗
19. Minimum-Time Trajectory Planning under Dynamic Constraints for a Wheeled Mobile Robot with a Trailer10.1016/j.mechmachtheory.2021.104605 ↗
20. A New Approach to Time-Optimal Trajectory Planning with Torque and Jerk Limits for Robot10.1016/j.robot.2021.103744 ↗
21. A Novel Trajectory Planning Approach with Torque and Jerk Constraints Based on Polynomial Interpolation Profile and Adaptive Iteration10.1016/j.cirpj.2025.05.009 ↗
22. Sobol Sequence RRT* and Numerical Optimal Joint Algorithm-Based Automatic Parking Trajectory Planning of Four-Wheel Steering Vehicles10.1016/j.robot.2024.104909 ↗
23. Optimization-Based Trajectory Planning for Autonomous Vehicles in Scenarios with Multiple Reference Lines10.1016/j.conengprac.2025.106407 ↗
24. Lane-Changing and Overtaking Trajectory Planning for Autonomous Vehicles with Multi-Performance Optimization Considering Static and Dynamic Obstacles10.1016/j.robot.2024.104797 ↗
25. UAV Trajectory Planning Based on Bi-Directional APF-RRT* Algorithm with Goal-Biased10.1016/j.eswa.2022.119137 ↗
26. Optimization of Bits Allocation and Path Planning with Trajectory Constraint in UAV-Enabled Mobile Edge Computing System10.1016/j.cja.2020.04.014 ↗
27. Collision-Free Trajectory Planning for UAVs Based on Sequential Convex Programming10.1016/j.ast.2024.109404 ↗
28. Trajectory Planning and Tracking Control in Autonomous Driving System: Leveraging Machine Learning and Advanced Control Algorithms
29. Dynamic Modeling and Robust Control of a Multi-Cable Payload Transfer System for Offshore Cranes Subjected to Random Waves and Wind Loads10.1016/j.oceaneng.2024.119516 ↗
30. Saran, V.H., and Misra, R.K. (2021). Dynamic Modelling and Payload Response Analysis of a 3-D Overhead Gantry Crane. Advances in Systems Engineering, Springer.10.1007/978-981-15-8025-3 ↗
31. Computer Vision-Based Real-Time Continuous Monitoring of the Pose for Large-Span Bridge Cable Lifting Structures10.1016/j.autcon.2024.105383 ↗
32. Zhu, B., Li, C., Song, L., Song, Y., and Li, Y. (2017, January 20–22). A* Algorithm of Global Path Planning Based on the Grid Map and V-Graph Environmental Model for the Mobile Robot. Proceedings of the 2017 Chinese Automation Congress (CAC), Jinan, China.10.1109/CAC.2017.8243661 ↗
33. Correction to “A Formal Basis for the Heuristic Determination of Minimu. m Cost Paths”10.1145/1056777.1056779 ↗
34. Zhu, Q., Xiang, Q., and Cai, L. (2024, January 12). An Improved A* Algorithm for AUV Path Planning. Proceedings of the 2024 2nd International Conference on Algorithm, Image Processing and Machine Vision (AIPMV), Zhenjiang, China.10.1109/AIPMV62663.2024.10692295 ↗
35. Arai, K., Kapoor, S., and Bhatia, R. (2020, January 16–17). A Comprehensive Survey and Analysis on Path Planning Algorithms and Heuristic Functions. Proceedings of the Intelligent Computing, Virtual.
36. Yan, Z., and Gu, S. (2010). Cable Crane, China Electric Power Press.