journal article·2024-10-08Open access

Research on “Playing Football” Type Roof Control in Fully-Mechanized Mining Face with a Super-Large Mining Height under the Background of 5G+ Big Data

Jianyu Liu, Fukun Xiao, Lei Shan

Applied Sciences· Volume 14· Issue 19

Abstract

With the increase of mining height at the working face, the influence range of roof fractures in the goaf increases, the advanced supporting pressure on the coal wall increases, ground pressure becomes more intense, and roof support becomes more difficult. Based on the analysis of ground pressure behavior in the first mining and caving stage, the normal mining stage, and the final mining breakthrough stage of the fully-mechanized mining face near 12,404, the relationship between conveyor current and coal speed is studied and compared. Based on the intelligent control system of the fully-mechanized mining face with a super-high mining height of 12,404 and the structure of the football team, the “playing football” roof control mode of the fully-mechanized mining face with super-high mining height under the background of 5G+ big data is put forward. The conclusions are as follows: In 12,404, the ground pressure was first mined. During normal mining, when the roof with a buried depth of more than 200 m is broken, the speed of the coal machine is kept within 12 m/min, and the full guard defends and controls the roof, pulling the lead frame through the area with severe ground pressure. When the roof is good, it is necessary to speed up the coal cutting and get rid of the pressure. When it is less than 200 m, it will overcome the local weighting, and show an offensive trend to speed up and increase production. In the final mining breakthrough stage, the speed of the coal machine should be controlled within 8 m/min, with attention to defense, guarding against roof leakage, and reducing waste rock.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Applied Advanced Technologies · Advanced Technologies and Applied Computing · AI and Multimedia in Education

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

School of Safety Engineering, Heilongjiang University of Science & Technology, Harbin 150022, China

China Energy Shendong Coal Grp Co., Ltd., Shangwan Coal Mine, Ordos 017209, China

School of Mining Engineering, Heilongjiang University of Science & Technology, Harbin 150027, China

Funding

Natural Science Foundation of Heilongjiang Province · National Natural Science Foundation of China

References (43)

Show source-provided references
1. Roof Control Technology of Fully—Mechanized Coal Mining Face Under Special Geological Conditions
2. Supports crushing types in the longwall mining of shallow seams
3. Ju, J.F. (2013). Mechanism and Prevention of Support Crushing Disaster While Mining out of the Upper Coal Pillar in Close Distance Shallow Seams. [Ph.D. Thesis, China University of Mining and Technology].
4. Longwall chock sudden closure incident below coal pillar of adjacent upper mined coal seam under shallow cover in the Shendong coalfield10.1016/j.ijrmms.2015.04.004 ↗
5. Support Resistance Analysis for Special Roof Structures Under Room Mining Goaf
6. Study on the characteristics of strata behavior in shallow seam longwall mining under the room-and-pillar mining goaf
7. Influencing mechanism of gully terrain on ground pressure behaviors in shallow seam longwall mining
8. Mechanism and control technology of roof caving in super high fully mechanized mining face
9. Zhu, W.B. (2010). Study on the Instability Mechanism of Key Strata Structure in Repeat Mining of Shallow Close Distance Seams. [Ph.D. Thesis, China University of Mining and Technology].
10. Rational buried depth for regulating roadway application during coal face withdrawal in Shendong mining area
11. Study on mechanism of abnormal rib spalling in regulating roadway during last moving of fully mechanized face with super large mining height
12. Key Techniques of Mining at Fully Mechanized Face with Large Mining Height
13. Research on key mining technology of fully—Mechanized working face with 8 m large mining height10.1016/j.surfcoat.2017.01.112 ↗
14. Roof fall analysis and control technology of 8. 8m super high mining face
15. Mechanism and key prevention technology of roof caving in shallow buried large mining height fully-mechanized working face
16. Partition Prediction Model for Hidden Danger of Roof Fall and Its Application Practice
17. Study on influence factors of roof fall at fully mechanized sublevel caving face in Buertai coal mine
18. Grouting Reinforcement Technology for End Zone of Large Mining Height Working Face
19. Praetice and refleetion on coal preparation plant intelligent construetionof Shanxi Coking Coal Group
20. Zhang, L., Wang, G.F., Liu, Z.G., Fu, J.X., Wang, D.D., Hao, Y.Q., Meng, L.Y., Zhang, J.Z., Zhou, Z.Y., and Zhang, L. (Coal Sci. Technol., 2024). Research of the present situation and development trend of intelligent coal mine construction market, Coal Sci. Technol., accepted.
21. Analysis on key technologies of intelligent coal mine and intelligent mining
22. Research on the Progress, Problems, and Countermeasures of Intelligent Construction in Large Coal Enterprises Coal Mines
23. Design and Practice of Integrated System for Intelligent Unmanned Working Face Mining System in Huangling Coal Mine
24. The Development and Application of Key Technologies and Equipment for the 450-meter Intelligent Ultra-long Working Face at Xiaobaodang
25. The Intelligent Fully Mechanized Mining Technology and Equipment for 10-meter Ultra-large Mining Height
26. China Energy Group is Accelerating the High-quality Development of the Coal Industry by Establishing the “1235” Coal Mine Intelligent Construction Model
27. Shandong Energy’s Practical Exploration and Typical Application Scenarios in Intelligent Mine Construction
28. Dare to be the first, innovate and create efficiency, and strive to be the leader in the construction of intelligent coal mines
29. Key Technologies and Practices for Safe, Efficient, and Intelligent Mining of Deep Coal Resources
30. Powered Roof Support—Rock Strata Interactions on the Example of an Automated Coal Plough System10.2478/sgem-2018-0007 ↗
31. Research on Evaluation and Promotion Strategy of Data Governance Capability for Intelligent Coal Mines
32. Exploration and practice of intelligent construction under complex geological conditions in Tangjiahui Coal Mine
33. Automatic speed control system of mine belt conveyor based on video
34. Lu, J.C. (2012). Research on Shearer Positioning System Based on Embedded WEB Server. [Master’s Thesis, China University of Mining and Technology].
35. Lu, X.L. (2012). Research on Key Technologies of Automatic Control for Supporting Pose of Hydraulic Support. [Ph.D. Thesis, China University of Mining and Technology].
36. Research on automation performance of height adjustment system of drum shearer based on memory cutting method
37. Dynamic Precise Positioning Method of Shearer Based on Closing Path Optimal Estimation Model10.1109/TASE.2018.2871758 ↗
38. Research on the Memory Cutting Model of Shearer
39. Research and application of key technology of SAM2.0 integrated control system for fully mechanized mining face
40. Research and application of key technologies for intelligent construction of fully mechanized mining face in Cuncaota Coal Mine
41. Research on intelligent key technology of industrial ten trillion ring network + shearer
42. Practice of memonic cutting of Faceboss coal Cutter
43. Researeh on complete set of intelligent control system for coal mine fully mechanized mining