An Optimization Model for the Maximized Profit of Housing Development Project: A Case Study of Bangkok and Perimeter, Thailand
Source abstract
Abstract
The objective of this research was to assess the profitability of the housing development project located in Bangkok, and the perimeter areas are Nonthaburi, Samut Prakan, and Pathum Thani, which are the result of good construction management. Moreover, the researchers’ previous data were used to predict the profit for construction planning, using stepwise multiple regression analysis. Then, we found the profit equation of the housing development project and applied it to the optimization model to clarify the model by the case study. The case study has 427 units, dividing the house into three types, with an optimization performed using the GAMS tool. In the same way, according to this optimization, it can be divided into two scenarios: scenario one found the maximized profit of the project to be 1053.91 MB, and scenario two was the result of making a sensitive analysis of scenario one and found the maximized profit of the project to be 1054.18 MB, which is the best scenario for the maximized profit of the project, and so it is the best choice for construction planning. The research contribution in this model can be applied to other projects that are suitable for large or densely populated cities, such as Beijing, New Delhi, and others. In the Conclusion section, we offer recommendations and detail future work that the researchers have discussed and described for the benefit of future research in housing development projects.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: BIM and Construction Integration · Construction Project Management and Performance · Infrastructure Maintenance and Monitoring
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Engineering, King Mongkut’s Institute of Technology Ladkrabang, Bangkok 10520, Thailand
References (24)
Show source-provided references
1. Multiple Linear Regression Model for Estimating the Price of a Housing Unit10.4314/gm.v17i2.9 ↗
2. Real property valuation using sales comparison method and multiple regression analysis
3. Regression Modelling for Prediction of Construction Cost and Duration10.4028/www.scientific.net/AMM.857.195 ↗
4. Housing Development Optimizition (Case Study: Anugerah Dian Regency In Kabupaten Banjar)
5. Montana, F., Kanafani, K., Wittchen, K.B., Birgisdottir, H., Longo, S., Cellura, M., and Riva Sanseverino, E. (2020). Multi-Objective Optimization of Building Life Cycle Performance. A Housing Renovation Case Study in Northern Europe. Sustainability, 12.10.3390/su12187807 ↗
6. Application of Linear programming for Profit maximization of a Housing construction company: Case study of Urbanization of Millennials
7. Marović, I., Perić, M., and Hanak, T. (2021). A Multi-Criteria Decision Support Concept for Selecting the Optimal Contractor. Appl. Sci., 11.10.3390/app11041660 ↗
8. A Multi-Objective Optimization Model for Solid Waste Disposal Under Uncertainty: A Case Study of Bangkok, Thailand10.1007/s40999-016-0092-4 ↗
9. Baldominos, A., Blanco, I., Moreno, A.J., Iturrarte, R., Bernárdez, Ó., and Afonso, C. (2018). Identifying Real Estate Opportunities Using Machine Learning. Appl. Sci., 8.10.20944/preprints201810.0297.v1 ↗
10. An Approach to Maximize profit of a constructing project within Limited Budget by using Simplex Method
11. Optimization of residential property management
12. Case Study of Housing Development with Optimization of Housing Land Utilization by Using Linear Programs
13. Real Estate Information Center (2004, August 25). Real Estate Situation Bangkok-Perimeter. Available online: www.reic.or.th.
14. Yamane, T. (1967). Statistics, an Introductory Analysis, Harper. [2nd ed.].
15. Sarker, R.A., and Newton, C.S. (2007). Optimization Modelling a Practical Approach, CRC Press.10.1201/9781420043112 ↗
16. Winston, W.L. (2004). Operations Research Applications and Algorithms, Thomson Brooks/Cole. [4th ed.].
17. Balakrishnan, N., Stair, R.M., and Render, B. (2013). Managerial Decision Modeling with Spreadsheets, Pearson Education Ltd.
18. Render, B., Stair, R.M., Hanna, M.E., and Hale, T.S. (2015). Quantitative Analysis for Management, Pearson Education Ltd.. [12th ed.].
19. Taylor, B.W. (2019). Introduction to Management Science, Pearson Education Ltd.
20. Wisniewski, M., and Dacre, T. (1990). Mathematical Programming: Optimization Models for Business and Management Decision-Making, McGRAW-HILL Book Company Ltd.
21. Meredith, J.R., Shafer, S.M., and Turban, E. (2002). Quantitative Business Modeling, South-Western/Thomson Learning.
22. Modelling and predicting construction durations in Hong Kong public housing10.1080/014461999371556 ↗
23. Developing a benchmark model for project construction time performance in Hong Kong10.1016/j.buildenv.2003.08.012 ↗
24. Estimating time performance for building construction projects in Vietnam10.1007/s12205-013-0862-3 ↗