Abstract
The safety-grade water-intake immersed tunnel plays a vital role in the nuclear power cooling system, and its seismic safety is crucial. This paper employs the response displacement method and dynamic time-history analysis using the finite element software ANSYS to construct a beam–spring model and a 3D finite element model of a shield tunnel and foundation. It also develops equivalent linear dynamic constitutive and viscoelastic boundary element subprograms. This study focuses on the weak joint sections of immersed tunnels, conducting a seismic performance analysis under extreme safety earthquake conditions (SL-2). The results indicate that the joint stiffness of immersed tunnels and the increase in seismic peak values do not affect the trend of joint opening variation with longitudinal position. The change in joint opening is primarily located where the thickness of the cover layer changes abruptly or where the soil hardness is unevenly distributed. The joint opening is mainly influenced by seismic forces when considering static and dynamic superposition. When the stiffness of the joint GINA water stop exceeds a certain value, the correlation between stiffness change and joint compression–tension variation gradually weakens. This research can provide a reference for the seismic design of similar projects.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Geotechnical Engineering and Underground Structures · Geotechnical and Geomechanical Engineering · Landslides and related hazards
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Architectural Engineering, Dalian University, Dalian 116622, China
Gansu Comprehensive Railway Engineering Contracting Co., Ltd., Lanzhou 730030, China
Funding
Key Project of the National Natural Science Foundation of China · Dalian Science and Technology Innovation Fund Project
References (33)
Show source-provided references
1. Tests for compartmental particle damper’s a seismic control in an immersed tunnel
2. Research of shaking table model tests on immersed tunnels under different conditions
3. Shaking tables tests for an immersed tunnel model considering wave passage effect
4. Experimental failure analysis on concrete shear keys in immersion joint subjected to compression-shear loading
5. Behaviour of Subaqueous Tunnels During Earthquakes10.1002/eqe.4290010306 ↗
6. Chen, H.-J. (2014). Theoretical Analysis and Experimental Research on Seismic Performance of Immersed Tunnel and Its Joints. [Ph.D. Thesis, Beijing University of Technology].
7. Shaking table test of a tunnel-soil system considering the influence of surface buildings under multi-dimensional seismic waves
8. Shaking table test of soil and tunnel considering surface construction under multi-dimensional earthquake
9. Peng, H., Meng, G., Ding, Q., and Xu, F. (2008). The influence of hydrodynamic pressure on immersed tunnel under earthquake excitation. J. Shanghai Jiaotong Univ., 1027–1031.
10. Seismic response of subsea tunnels considering seawater seabed coupling effect
11. Earthquake dynamic response analysis of seabed under the action of immersed tunnel
12. Simulation method for nonlinear mechanical properties of immersed tunnel joint
13. Zhang, X., Zhao, G., Ye, G., and Wang, J. (2011). Simplified method and three-dimensional finite element analysis of quake-proof for immersed tunnel joints. Chin. J. Undergr. Space Eng., 7.
14. Multi-scale method and seismic response analysis of immersed tunnel
15. Mechanical properties of shear keys of segment joints in immersed tunnels under seismic loading
16. Analysis of the Affecting Factors for Seismic Response of Immersed Tunnel
17. Bai, L., Zhao, X., Du, X., Yuan, Y., and Liu, H. (2015). Seismic Response of Joints of Immersed Tunnels. J. Disaster Prev. Mitig. Eng., 35.
18. Hu, Z. (2015). Research on Action Mechanisms and Structural Properties of Segmental Joint Shear Keys on Immersed Tunnel, Chang’an University.
19. Analysis of GINA uneven compression during hydraulic connection of immersed tunnel element at curved plane design line
20. Technology for installation of GINA gasket
21. Damage Analysis and Repair Technology of OMEGA Gasket in Immersed Tunnel
22. Research status and Engineering application of rubber water stop for immersed tunnel
23. Development of New type Omega rubber water stop
24. Performance Evaluation and Safety Pre-warning of GINA in Immersed Tube Tunnel
25. Vertical Compression Shear Mechanical Performance Study of Immersed Tunnel Joint
26. Wang, X. (2011). ANASYS Structure Analysis and Application, China Communication Press.
27. (2019). Standard for Seismic Design of Nuclear Power Plants (Standard No. GB 50267-2019).
28. (2000). Seismic Analysis of Safety-Related Nuclear Structures and Commentary (Standard No. ASCE 4-98-2000).
29. Cao, J., Tao, G., and Deng, Y. (2021). Research on dynamic response of ship cabin structure based on modified Housner model. Water Transp. Eng.
30. Secondary development and application of equivalent linear viscoelastic model based on ANSYS
31. Implementation of viscoelastic artificial boundary in ABAQUS and comparative study of seismic input methods
32. (2015). Code for Hydraulic Design of Nuclear Power Plants (Standard No. NB/T 25046-2015).
33. (2019). Specifications for Seismic Design of Highway Tunnels (Standard No. JTGT 2232-2019).