Optimization Study on Key Technology of Improved Arch Cover Method Construction for Underground Metro Stations Based on Similar Model Test
Source abstract
Abstract
To enhance comprehension of the improved arch cover construction method for underground metro stations and provide guidance for future construction techniques and programs, the paper examines the indoor improved arch cover method of construction in the underground concealed excavation station of Tianhe Road Station of Guangzhou Metro Line 10, China. It includes a similar model test of the key technology and an analysis of the evolution law of the surrounding rock stress, the law of the ground settlement, and the law of the arch top deformation after the tunnel excavation. The study found that increased over-support can decrease arch settlement, with the maximum settlement occurring near the arch. Ground settlement typically occurs in the same areas as arch settlement, but arch settlement may occur earlier. The excavation of the arch cover has little impact on the overlying soil pressure, and the supporting structure is more effective in controlling soil deformation. The upper part of the arch cap experiences mainly extrusion stress, with the maximum stress occurring near the middle of the arch. The stresses in the arch’s base decrease significantly during the excavation of the side drifts but show an increasing trend during the excavation of the lower rock mass. The presence of the central column significantly affects both the settlement of the arch and the ground, as it bears most of the compressive stress of the arch. This stress decreases initially and then increases. The amplitude of deformation is more pronounced when the dismantled central column is closer to the middle of the arch.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Geotechnical Engineering and Analysis · Geotechnical Engineering and Underground Structures · Grouting, Rheology, and Soil Mechanics
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Resources and Safety Engineering, Central South University, Changsha 410083, China
China Railway 16th Bureau Group Corporation, Beijing 100018, China
Funding
National Natural Science Foundation of China
References (26)
Show source-provided references
1. Survey on construction methods for metro stations
2. A New underground excavation construction method for subway stations-arch cover Method
3. Monitoring and analysis of excavation-induced subsidence of subway station constructed by arch cover method and control measures
4. Wang, D. (2022). Study on Evaluation System of the Impact of Metro Station Construction with Arch Cover Method on the Surrounding Environment. [Master’s Thesis, Shijiazhuang Railway University]. (In Chinese).
5. Surface Settlement of Subway Station Construction Using Pile-Beam-Arch Approach10.1016/j.tust.2019.05.016 ↗
6. Shallow Tunnelling Method (Stm) for Subway Station Construction in Soft Ground10.1016/j.tust.2011.12.007 ↗
7. Construction Technique of Vertical Shafts Excavation Above Subway Tunnel10.1007/s10706-021-01753-8 ↗
8. Case Study on Deformation Control of Upper-Soft and Lower-Hard Large Span Tunnel Station Using Combined Control Technology and Monitoring Demonstration10.17576/jsm-2017-4611-09 ↗
9. Study on Adaptability of Primary Support Arch Cover Method for Large-Span Embedded Tunnels in the Upper-Soft Lower-Hard Stratum10.1177/1687814018825375 ↗
10. Optimal Analysis of Tunnel Construction Methods through Cross Passage from Subway Shaft10.1155/2018/5181954 ↗
11. Centrifuge Modelling of Building Response to Tunnel Excavation
12. The Case of Measurement for Shallow Soil Tunnel with Pre-Supported Nail Method
13. Stabilisation of the Excavation Face in Shallow Tunnels Using Fibreglass Dowels10.1007/s00603-012-0234-1 ↗
14. Subway Station Construction Using Combined Shield and Shallow Tunnelling Method: Case Study of Gaojiayuan Station in Beijing10.1016/j.tust.2018.09.010 ↗
15. Ground Surface Settlement Analysis of Metro Tunnel Using Pba Method: A Case Study of the Su-Huang Interval
16. Enlarging a Large-Diameter Shield Tunnel Using the Pile–Beam–Arch Method to Create a Metro Station10.1016/j.tust.2015.04.006 ↗
17. Challenges and Countermeasures for Using Pile-Beam-Arch Approach to Enlarge Large-Diameter Shield Tunnel to Subway Station10.1016/j.tust.2020.103326 ↗
18. Monitoring and Reinforcement of Landslide Induced by Tunnel Excavation: A Case Study from Xiamaixi Tunnel10.1016/j.tust.2020.103796 ↗
19. Internal Force Calculation and Supporting Parameters Sensitivity Analysis of Side Piles in the Subway Station Excavated by Pile-Beam-Arch Method10.1016/j.tust.2016.03.012 ↗
20. Wang, F.W. (2014). Model Experimental Study on Mechanical Behaviour of Large-Span Underground Station Construction. [Master’s Thesis, Shijiazhuang Railway University]. (In Chinese).
21. Liu, G. (2014). Research on Construction Mechanical Behaviour of Puhuangyu Underground Station. [Master’s Thesis, Southwest Jiaotong University]. (In Chinese).
22. Model Research on Failure Mechanism and Lining Stress Characteristics of Shallow Buried Tunnel Under Unsymmetrical Pressure
23. Xiao, J. (2020). Stability Analysis of Peripheral Rock and Supporting Structure of Shallow Buried Biased Tunnel in Soil-Stone Junction Stratum. [Master’s Thesis, Chang’an University]. (In Chinese).
24. Model test study on the construction of metro station with three consecutive arches by shield method
25. Simulation experiment of similar materials of cement and gypsum
26. Research on Analogous Material Model Test for Highway Tunnels