Long-Term Behaviour of Precast Concrete Deck Using Longitudinal Prestressed Tendons in Composite I-Girder Bridges

Haiying Ma, Xuefei Shi, Yin Zhang

Applied Sciences· Volume 8· Issue 12

Abstract

Twin-I girder bridge systems composite with precast concrete deck have advantages including construction simplification and improved concrete strength compared with traditional multi-I girder bridge systems with cast-in-place concrete deck. But the cracking is still a big issue at interior support for continuous span bridges using twin-I girders. To reduce cracks occurrence in the hogging regions subject to negative moments and to guarantee the durability of bridges, the most essential way is to reduce the tensile stress of concrete deck within the hogging regions. In this paper, the prestressed tendons are arranged to prestress the precast concrete deck before it is connected with the steel girders. In this way, the initial compressive stress induced by the prestressed tendons in the concrete deck within the hogging region is much higher than that in regular concrete deck without prestressed tendons. A finite element analysis is developed to study the long-term behaviour of prestressed concrete deck for a twin-I girder bridge. The results show that the prestressed tendons induce large compressive stresses in the concrete deck but the compressive stresses are reduced due to concrete creep. The final compressive stresses in the concrete deck are about half of the initial compressive stresses. Additionally, parametric study is conducted to find the effect to the long-term behaviour of concrete deck including girder depth, deck size, prestressing stress and additional imposed load. The results show that the prestressing compressive stress in precast concrete deck is transferred to steel girders due to concrete creep. The prestressed forces transfer between the concrete deck and steel girder cause the loss of compressive stresses in precast concrete deck. The prestressed tendons can introduce some compressive stress in the concrete deck to overcome the tensile stress induced by the live load but the force transfer due to concrete creep needs be considered. The concrete creep makes the compressive stress loss and the force redistribution in the hogging regions, which should be considered in the design the twin-I girder bridge composite with prestressed precast concrete deck.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Structural Behavior of Reinforced Concrete · Railway Engineering and Dynamics · Structural Load-Bearing Analysis

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Department of Bridge Engineering, Tongji University, Shanghai 200092, China

Funding

National Key R&D Program of China · National Natural Science Foundation of China · Science and Technology Commission of Shanghai Municipality

References (26)

Show source-provided references
1. Gara, F., Leoni, G., and Dezi, L. (2013). Slab cracking control in continuous steel-concrete bridge decks. J. Bridge Eng., 1319–1327.10.1061/(ASCE)BE.1943-5592.0000459 ↗
2. Long-term analysis of steel–concrete composite beams: FE modeling for effective width evaluation10.1016/j.engstruct.2005.12.002 ↗
3. Oehlers, D.J., and Bradford, M.A. (2013). Composite Steel and Concrete Structures: Fundamental Behavior, Elsevier.
4. Crack control of a steel and concrete composite plate girder with prefabricated slabs under hogging moments10.1016/j.engstruct.2005.05.015 ↗
5. Xia, Y., Wang, P., and Sun, L. (2019). Neutral axis position based health monitoring and condition assessment techniques for concrete box girder bridges. Int. J. Struct. Stab. Dyn., 19.10.1142/S0219455419400157 ↗
6. Early-age cracking in high performance concrete decks of typical Curved steel girder bridges10.1061/(ASCE)AS.1943-5525.0000595 ↗
7. Miyamoto, A., Tei, K., Nakamura, H., and Bull, J. (2000). Behavior of prestressed beam strengthened with external tendons. J. Struct. Eng., 1033–1044.10.1061/(ASCE)0733-9445(2000)126:9(1033) ↗
8. Deng, Y., and Morcous, G. (2013). Efficient prestressed concrete-steel composite girder for medium-span bridges. I: System description and design. J. Bridge Eng., 1347–1357.10.1061/(ASCE)BE.1943-5592.0000474 ↗
9. Deng, Y., and Morcous, G. (2013). Efficient prestressed concrete-steel composite girder for medium-span bridges. II: Finite-element analysis and experimental investigation. J. Bridge Eng., 1358–1372.10.1061/(ASCE)BE.1943-5592.0000479 ↗
10. Effectiveness of basalt FRP tendons for strengthening of RC beams through the external prestressing technique10.1016/j.engstruct.2015.06.052 ↗
11. Effects of construction process and slab prestressing on the serviceability behaviour of composite bridges10.1016/S0143-974X(02)00029-9 ↗
12. Construction sequence modeling of continuous steel-concrete composite bridge decks10.12989/scs.2006.6.2.123 ↗
13. Liu, X., Liu, Y., and Luo, J.X.H. (2018, December 11). Behavior of Continuous Composite Bridge during Construction with Jacking up Interior Support, National Bridge Conference 2012, pp. 658–662, 2012. (In Chinese). China Highway and Transportation Society. Available online: http://caj.d.cnki.net//KDoc/docdown/pubdownload.aspx?dk=kdoc%3apdfdown%3aa31df52a5345b1bdc7ff1d792e853f28.
14. Behavior of post-installed shear connectors under static and fatigue loading10.1016/j.jcsr.2009.09.012 ↗
15. The behaviour of a prefabricated composite bridge with dry deck joints10.2749/101686613X13439149157632 ↗
16. Su, Q., Yang, G., and Bradford, M. (2015). Behavior of a continuous composite box girder with a prefabricated prestressed-concrete slab in its hogging-moment region. J. Bridge Eng., B4014004.10.1061/(ASCE)BE.1943-5592.0000698 ↗
17. Tong, T., Yu, X., and Su, Q. (2017). Coupled effects of concrete shrinkage, creep, and cracking on the performance of postconnected prestressed steel-concrete composite girders. J. Bridge Eng.10.1061/(ASCE)BE.1943-5592.0001192 ↗
18. Ministry of Construction of the People’s Republic of China (2015). Code for Design of Concrete Structures, Ministry of Construction of the People’s Republic of China. GB50010-2010.
19. Ministry of Transport of the People’s Republic of China (2004). Chinese Code for Design of Highway Reinforced Concrete and Pre-Stressed Concrete Bridge and Culverts Beijing, Ministry of Transport of the People’s Republic of China. JTG D62-2004.
20. Ministry of Transport of the People’s Republic of China (2012). Code for Design of Highway Reinforced Concrete and Prestressed Concrete Bridges and Culverts, Ministry of Transport of the People’s Republic of China. JTG D62-2012.
21. (2009). ANSYS Release 12.0 [Computer Software, Version 12.0], ANSYS, Inc.
22. ANSYS, Inc. (2009). ANSYS Manual, ANSYS, Inc.
23. Time-Frequency-Based Data-Driven Structural Diagnosis and Damage Detection for Cable-Stayed Bridges10.1061/(ASCE)BE.1943-5592.0001199 ↗
24. Ministry of Construction of the People’s Republic of China (2003). Code for Design of Steel Structures, Ministry of Construction of the People’s Republic of China. GB50017-2003.
25. Ministry of Construction of the People’s Republic of China (2013). Code for Design of Steel and Concrete Composite Bridges, Ministry of Construction of the People’s Republic of China. GB50917-2013.
26. Oh, B., and Sause, R. (2006). Empirical Models for Confined Concrete under Uniaxial Loading. International Symposium on Confined Concrete, American Concrete Institute. ACI SP-238.