A Construction Schedule Robustness Measure Based on Improved Prospect Theory and the Copula-CRITIC Method

Mengqi Zhao, Xiaoling Wang, Jia Yu, Linli Xue, Shuai Yang

Applied Sciences· Volume 10· Issue 6

Abstract

A robustness measure is an effective tool to evaluate the anti-interference capacity of the construction schedule. However, most research focuses on solution robustness or quality robustness, and few consider a composite robustness criterion, neglecting the bounded rationality of subjective weights and inherent importance and nonlinear intercriteria correlations of objective weights. Therefore, a construction schedule robustness measure based on improved prospect theory and the Copula-criteria importance through intercriteria correlation (CRITIC) method is proposed. Firstly, a composite robustness criterion is established, including start time deviation rs and structural deviation rp for measuring solution robustness from project execution and completion probability rc for measuring quality robustness from the project result. Secondly, bounded rationality is considered, using prospect theory to calculate subjective weights, which is improved by the interval distance formula. Thirdly, the Copula-CRITIC method is proposed to determine objective weights incorporating both inherent importance and nonlinear intercriteria correlations. Finally, an information-entropy-based evidence reasoning method is applied to combine subjective and objective weights together while identifying their validity. An underground power station in China is used for a case study, whose robustness is measured using the proposed methods, single robustness criterion, and composite robustness criterion using traditional weighting methods. The comparison results verify the consistency, representativeness, and advantage of the proposed criterion and methods.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Construction Project Management and Performance · Resource-Constrained Project Scheduling · Multi-Criteria Decision Making

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300350, China

Funding

The National Natural Science Foundation of China · The Yalong River Joint Funds of the National Natural Science Foundation of China

References (50)

Show source-provided references
1. Stijn, V.d.V. (2006). Proactive-Reactive Procedures for Robust Project Scheduling. [Ph.D. Thesis, University of Leuven].
2. Time slack-based techniques for robust project scheduling subject to resource uncertainty10.1007/s10479-010-0777-z ↗
3. Improving schedule stability in single-machine rescheduling for new operation insertion10.1016/j.cor.2015.05.015 ↗
4. Conflict between energy, stability, and robustness in production schedules
5. An algorithmic framework for improving the performance of the critical chain buffer sizing method
6. On the robust and stable flowshop scheduling under stochastic and dynamic disruptions10.1109/TEM.2017.2712611 ↗
7. Xiao, S.C., Sun, S.D., and Jin, J.H. (2017). Surrogate measures for the robust scheduling of stochastic job shop scheduling problems. Energies, 10.10.3390/en10040543 ↗
8. A new proactive-reactive approach to hedge against uncertain processing times and unexpected machine failures in the two-machine flow shop scheduling problems
9. Pang, N.S., Su, H.F., and Shi, Y.L. (2018). Project robust scheduling based on the scattered buffer technology. Appl. Sci., 8.10.3390/app8040541 ↗
10. Robustness analysis of underground powerhouse construction simulation based on Markov Chain Monte Carlo method10.1007/s11431-015-5859-3 ↗
11. Robust project scheduling integrated with materials ordering under activity duration uncertainty
12. Distributionally robust scheduling on parallel machines under moment uncertainty10.1016/j.ejor.2018.07.007 ↗
13. Robust vehicle routing problem with hard time windows under demand and travel time uncertainty10.1016/j.cor.2018.02.006 ↗
14. Robust resource-constrained max-NPV project scheduling with stochastic activity duration
15. Novianingsih, K., Hadianti, R., Uttunggadewa, S., and Soewono, E. (2014, January 8–9). Simulation for measuring the effect of flight retiming to the robustness of flight schedule. Proceedings of the AIP Conference, Bandung, Indonesia.10.1063/1.4868840 ↗
16. Hussain, T.S., Richard, S., Steve, R.S., Nicole, O., John, D., John, C., Julia, B., Adan, E.V., and Allison, C. (2015, January 6–9). Robust and flexible air mobility scheduling using stochastic simulation-based assessment. Proceedings of the 2015 WSC, Huntington Beach, CA, USA.10.1109/WSC.2015.7408347 ↗
17. Robust single machine scheduling with a flexible maintenance activity10.1016/j.cor.2019.03.001 ↗
18. Integrating production scheduling and maintenance policy for robustness in flow shop problems
19. Robustness measures and robust scheduling for multi-objective stochastic flexible job shop scheduling problems
20. A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations10.1007/s10951-015-0423-3 ↗
21. Proactive scheduling optimization on flow shops with random machine breakdowns
22. A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops10.1016/j.cie.2017.11.020 ↗
23. Joukar, A., Nahmens, I., and Harvey, C. (June, January 31). An AHP-based selection model for ranking potential strategies for managing construction’s cost volatilities. Proceedings of the Construction Research Congress, San Juan, PR, USA.
24. Applying Delphi method in prioritizing intensity of flooding in Ivar watershed in Iran10.1007/s41324-017-0086-6 ↗
25. Assessment on typical power supply mode for important power consumers based on analytical hierarchy process and expert experience
26. Measuring loss aversion under ambiguity: A METHOD to make prospect theory completely observable10.1007/s11166-016-9234-y ↗
27. Decision-making model of supporting schemes of foundation pit based on cumulative prospect theory and connection number
28. MADM method based on prospect theory and evidential reasoning approach with unknown attribute weights under intuitionistic fuzzy environment10.1016/j.eswa.2017.07.012 ↗
29. Prospect theory-based active consumer behavior under variable electricity pricing10.1109/TSG.2018.2810819 ↗
30. External validity of prospect theory: The evidence from soccer betting10.1016/j.socec.2016.07.005 ↗
31. Cumulative prospect theory and mean-variance analysis: A rigorous comparison10.21314/JCF.2017.336 ↗
32. Prospect theory in a dynamic game: Theory and evidence from online pay-per-bid auctions10.1016/j.jebo.2019.05.032 ↗
33. A hesitant group emergency decision making method based on prospect theory10.1007/s40747-017-0045-9 ↗
34. An extended MULTIMOORA method for probabilistic linguistic multi-criteria group decision-making based on prospect theory10.1016/j.cie.2019.07.052 ↗
35. Emergency alternative evaluation using extended trapezoidal intuitionistic fuzzy thermodynamic approach with prospect theory10.1007/s40815-019-00682-2 ↗
36. Environmental conflict analysis using an integrated grey clustering and entropy-weight method: A case study of a mining project in Peru10.1016/j.envsoft.2015.12.011 ↗
37. A Principal Component analysis/fuzzy comprehensive evaluation for rockburst potential in kimberlite10.1007/s00024-018-1790-4 ↗
38. Zheng, H., and Bai, X.L. (2015, January 1–2). Comprehensive evaluation method for the extended indicators of maintenance management based on the standard deviation of weights. Proceedings of the 21st International Conference on Industrial Engineering and Engineering Management, Zhuhai, China.10.2991/978-94-6239-102-4_39 ↗
39. A new hybrid fuzzy MCDM approach for evaluation of construction equipment with sustainability considerations10.1016/j.acme.2017.04.011 ↗
40. Levy, A., Ramadas, H., and Rothvoss, T. (2017, January 26–28). Deterministic Discrepancy Minimization via the Multiplicative Weight Update Method. Proceedings of the Lecture Notes in Computer Science, Waterloo, ON, Canada.10.1007/978-3-319-59250-3_31 ↗
41. Zhang, X.M., and Liu, Y.H. (2017, January 24–25). Method Research on Parameter Selection and Index Determination of Testability for Diesel Engine. Proceedings of the DEStech Transactions on Engineering and Technology Research, Taiyuan, China.10.12783/dtetr/icvmee2017/14639 ↗
42. Dempster, A.P. (2008). Classic Works of the Dempster-Shafer Theory of Belief Functions, Springer-Verlag. [1st ed.].
43. Fuzzy multiattribute group decision making based on intuitionistic fuzzy sets and evidential reasoning methodology10.1016/j.inffus.2015.03.002 ↗
44. Combination of classifiers with optimal weight based on evidential reasoning10.1109/TFUZZ.2017.2718483 ↗
45. Evidential reasoning rule for MADM with both weights and reliabilities in group decision making10.1016/j.knosys.2017.12.013 ↗
46. Consensus building in multiperson decision making with heterogeneous preference representation structures: A perspective based on prospect theory10.1016/j.asoc.2015.03.013 ↗
47. Li, X. (2014). Copula Method and Its Application, Economy & Management Publishing House. [1st ed.].
48. Counter-deception in information fusion10.1016/j.ijar.2017.09.003 ↗
49. Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a Markov process10.1061/(ASCE)CO.1943-7862.0000935 ↗
50. Zhao, M.Q., Wang, X.L., Yu, J., Bi, L., Xiao, Y., and Zhang, J. (2020). Optimization of construction duration and schedule robustness based on hybrid grey wolf optimizer with sine cosine algorithm. Energies, 13.10.3390/en13010215 ↗