Integrated Digital Twin and BIM Approach to Minimize Environmental Loads for In-Situ Production and Yard-Stock Management of Precast Concrete Components
Source abstract
Abstract
Digital twin (DT) technology, integrated with building information modeling (BIM), enables real-time feedback and predictive analytics in construction. This study presents a BIM-enabled DT framework to optimize in situ production and yard-stock management of precast concrete (PC) components with a focus on minimizing CO2 emissions. Using Oracle Crystal Ball, scenario-based simulations revealed up to an 8.9% reduction in environmental impact. Distinct from prior research that largely emphasized cost or off-site strategies, this study uniquely addresses on-site sustainability by embedding carbon metrics into the decision-making process. The framework was validated through a large-scale logistics warehouse project that showcased its practical utility. This research contributes a replicable method for enhancing sustainability in precast construction through digital technologies.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: BIM and Construction Integration · 3D Surveying and Cultural Heritage · Digital Transformation in Industry
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Architecture Division, Hyundai Development Company, Hangang-daero 23-gil, Seoul 04377, Republic of Korea
Department of R&D, Earth Turbine Co., Ltd., Daegu 41057, Republic of Korea
Department of Architectural Engineering, Kyung Hee University, Yongin-si 17104, Republic of Korea
Funding
Korea government (MOE)
References (80)
Show source-provided references
1. The digital transformation of the construction industry: A review
2. Building the digital age: Management of digital transformation in the construction industry10.1080/01446193.2024.2416033 ↗
3. Digital twins and big data towards smart manufacturing and Industry 4.0: 360-degree comparison
4. Towards a semantic construction digital twin: Directions for future research10.1016/j.autcon.2020.103179 ↗
5. Development of BIM Utilization Level Evaluation Model in Construction Management Company
6. BIM and OpenAI-based Model for Supporting Initial Construction Planning of Bridges and Tunnels
7. Conceptual Model for Quality Risk Assessment and Reserve Cost Estimation for Construction Projects based on BIM
8. Applying BIM Standard Guideline to Expressway BIM Results and Drawing Its Improvement Measure for Project Management
9. A Proposal for Evaluation Criteria of Decision Support System for BIM
10. Construction with digital twin information systems10.1017/dce.2020.16 ↗
11. Developing a digital twin at building and city levels: Case study of West Cambridge campus10.1061/(ASCE)ME.1943-5479.0000763 ↗
12. Digital twin-enabled smart modular integrated construction system for on-site assembly10.1016/j.compind.2021.103594 ↗
13. Modular based flexible digital twin for factory design10.1007/s12652-018-0953-6 ↗
14. Experiences of a digital twin based predictive maintenance solution for belt conveyor systems10.36001/phme.2022.v7i1.3355 ↗
15. Integrating digital twin and blockchain for smart building management
16. Lim, J., and Kim, J.J. (2020). Dynamic optimization model for estimating in-situ production quantity of PC members to minimize envi-ronmental loads. Sustainability, 12.10.3390/su12198202 ↗
17. Algorithms for in-situ production layout of composite precast concrete members10.1016/j.autcon.2014.02.005 ↗
18. A process for the efficient in-situ production of precast concrete members
19. Lim, C. (2016). Construction Planning Model for In Situ Production and Installation of Composite Precast Concrete Frame. [Ph.D. Thesis, Kyung Hee University].
20. Scenario-based 4D dynamic simulation model for in situ production and yard stock of precast concrete members10.1080/13467581.2022.2145214 ↗
21. Lim, J., and Kim, S. (2024). Environmental Impact Minimization Model for Storage Yard of In-situ Produced PC Components: Comparison of Dung Beetle Algorithm and Improved Dung Beetle Algorithm. Buildings, 14.10.20944/preprints202409.1022.v1 ↗
22. Jung, H.T., and Lee, M.S. (1992, January 24). A Study on the Site-production Possibility of the Prefabricated PC Components. Proceedings of the 1992 Autumn Annual Conference of the Architectural Institute of Korea, Seoul, Republic of Korea.
23. Genetic search for solving construction site-level unequal-area facility layout problems10.1016/S0926-5805(99)00006-0 ↗
24. Energy-efficient algorithms of the steam curing for the in situ production of precast concrete members10.1016/j.enbuild.2013.05.019 ↗
25. A Study on the effective inventory management by optimizing lot size in building construction10.5345/JKIC.2004.4.2.073 ↗
26. Lee, J.M., Yu, J.H., and Kim, C.D. (2007). A Economic Order Quantity (EOQ) Determination Method Considering Stock Yard Size, Korea Institute of Construction Engineering and Management.
27. Order Point Determination Method considering Materials Demand Variation of Construction Site
28. Improving labor flow reliability for better productivity as lean construction principle10.1061/(ASCE)0733-9364(2003)129:3(251) ↗
29. Economic Order Quantity (EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard Availability
30. Sustainable construction: Analysis of its costs and benefits
31. Building Information Modeling (BIM) for existing buildings—Literature review and future needs10.1016/j.autcon.2013.10.023 ↗
32. A hybrid CAD-based construction site layout planning system using genetic algo-rithms10.1016/S0926-5805(03)00058-X ↗
33. Dynamic construction site layout planning using max-min ant system10.1016/j.autcon.2009.09.002 ↗
34. Repertory grid technique in the development of Tacit-based Decision Support System (TDSS) for sustainable site layout planning10.1016/j.autcon.2011.02.004 ↗
35. Lee, G.J. (2012). A Study of In-Situ Production Management Model of Composite Precast Concrete Members. [Ph.D. Thesis, Kyung Hee University].
36. Evaluation of CO2 Emission Reduction Effect Using In-situ Production of Precast Concrete Components10.1080/13467581.2020.1726763 ↗
37. BIM-based and IoT-driven smart tracking for precast construction dynamic scheduling10.1061/JCEMD4.COENG-14498 ↗
38. Construction Scheduling Optimization of Prefabricated Buildings Under Resource Constraints Based on an Improved Whale Optimization Algorithm10.1007/s44196-025-00898-1 ↗
39. Pradhan, P., Verma, M.S., and Sahu, M.S. (2025). Optimization of Cast-In-Situ and Precast Concrete Methods Through BIM and Structural Simulations. Optimization.
40. Probabilistic digital twins for geotechnical design and construction10.1017/dce.2025.10008 ↗
41. Dynamic simulation model for estimating in-situ production quantity of pc members10.1007/s40999-020-00509-4 ↗
42. Cost reduction effects of in-situ PC production for heavily loaded long-span buildings10.1080/13467581.2020.1740095 ↗
43. Digital Twins for the Built Environment: Learning from Conceptual and Process Models in Manufacturing
44. BIM in Facilities Management Applications: A Case Study of a Large University Complex10.1108/BEPAM-02-2014-0011 ↗
45. Xu, Q., Wang, J., Gao, W., Ren, S., and Li, Z. (2024, January 18–20). Digital Twin: State-of-the-Art and Future Perspectives. Proceedings of the 2024 5th International Conference on Computer Science and Management Technology, Xiamen, China.10.1145/3708036.3708159 ↗
46. From BIM to Extended Reality in AEC Industry10.1016/j.autcon.2020.103254 ↗
47. Chen, C., Zhao, Z., Xiao, J., and Tiong, R. (2021). A conceptual framework for estimating building embodied carbon based on digital twin technology and life cycle assessment. Sustainability, 13.10.3390/su132413875 ↗
48. Tagliabue, L.C., Brazzalle, T.F., Rinaldi, S., and Dotelli, G. (2023). Cognitive Digital Twin Framework for Life Cycle Assessment Supporting Building Sustainability. Cognitive Digital Twins for Smart Lifecycle Management of Built Environment and Infrastructure, CRC Press.10.1201/9781003230199-9 ↗
49. Zhang, Z., Wei, Z., Court, S., Yang, L., Wang, S., Thirunavukarasu, A., and Zhao, Y. (2024). A review of digital twin technologies for enhanced sustainability in the construction industry. Buildings, 14.10.3390/buildings14041113 ↗
50. 5D BIM: Tools and methods for digital project construction management10.2495/BIM190181 ↗
51. Gonzalez, J., Soares, C.A.P., Najjar, M., and Haddad, A.N. (2021). BIM and BEM methodologies integration in energy-efficient buildings using experimental design. Buildings, 11.10.3390/buildings11100491 ↗
52. Rodrigues, F., Baptista, J.S., and Pinto, D. (2022). BIM approach in construction safety—A case study on preventing falls from height. Buildings, 12.10.3390/buildings12010073 ↗
53. Muzi, F., Marzo, R., and Nardi, F. (2022). Digital information management in the built environment: Data-driven approaches for building process optimization. Technological Imagination in the Green and Digital Transition, Springer International Publishing.10.1007/978-3-031-29515-7_12 ↗
54. Digital twin applications for overcoming construction supply chain challenges10.1016/j.autcon.2024.105679 ↗
55. Kosse, S., Forman, P., Stindt, J., Hoppe, J., Konig, M., and Mark, P. (2023). Industry 4.0 enabled modular precast concrete components: A case study. International RILEM Conference on Synergising Expertise Towards Sustainability and Robustness of CBMs and Concrete Structures, Springer Nature.10.1007/978-3-031-33211-1_21 ↗
56. Carbon peak management strategies for achieving net-zero emissions in smart buildings: Advances and modeling in digital twin
57. Filippova, E., Hedayat, S., Ziarati, T., and Manganelli, M. (2025). Artificial Intelligence and Digital Twins for Bioclimatic Building Design: Innovations in Sustainability and Efficiency. Preprints.10.20944/preprints202506.0008.v1 ↗
58. Digital Twin of HVAC system (HVACDT) for multiobjective optimization of energy consumption and thermal comfort based on BIM framework with ANN-MOGA10.1080/17512549.2022.2136240 ↗
59. Beyond data, towards sustainability: A Sydney case study on urban digital twins
60. (2006). Environmental Management-Life Cycle Assessment-Principles and Framework (Standard No. ISO 14040). Available online: https://www.iso.org/standard/37456.html.
61. (2006). Environmental Management-Life Cycle Assessment-Requirements and Guidelines (Standard No. ISO 14044). Available online: https://www.iso.org/standard/38498.html.
62. (2011). Sustainability of Construction Works—Assessment of Environmental Performance Of Buildings—Calculation Method (Standard No. EN 15978). Available online: https://shop.bsigroup.com/ProductDetail?pid=000000000030256638.
63. Evaluation of BIM-based LCA results for building design10.1016/j.autcon.2019.102972 ↗
64. Berges-Alvarez, I., Martinez-Rocamora, A., and Marrero, M. (2024). A Systematic Review of BIM-Based Life Cycle Sustainability Assessment for Buildings. Sustainability, 16.10.3390/su162411070 ↗
65. Mazur, Ł., and Olenchuk, A. (2023). Life cycle assessment and building information modeling integrated approach: Carbon footprint of masonry and timber-frame constructions in Single-Family houses. Sustainability, 15.10.3390/su152115486 ↗
66. Badenko, V., Bolshakov, N., Celani, A., and Puglisi, V. (2024). Principles for Sustainable Integration of BIM and Digital Twin Technologies in Industrial Infrastructure. Sustainability, 16.10.3390/su16229885 ↗
67. Kosse, S., Vogt, O., Wolf, M., Konig, M., and Gerhard, D. (2022). Digital twin framework for enabling serial construction. Front. Built Environ., 8.10.3389/fbuil.2022.864722 ↗
68. Widjaja, D.D., Lim, J., and Kim, S. (2025). Integrating Digital Twin and BIM for Special-Length-Based Rebar Layout Optimization in Reinforced Concrete Construction. Buildings, 15.10.3390/buildings15152617 ↗
69. Comparing carbon emissions of precast and cast-in-situ construction methods—A case study of high-rise private building10.1016/j.conbuildmat.2015.08.145 ↗
70. Zhou, F., Ning, Y., Guo, X., and Guo, S. (2023). Analyze differences in carbon emissions from traditional and prefabricated buildings combining the life cycle. Buildings, 13.10.3390/buildings13040874 ↗
71. Afsahi, I. (2024). Comparison Between Precast Versus In Situ Structures in Terms of Sustainability. [Master’s Thesis, Universitat Politecnica de Catalunya].
72. Gong, T., Yang, J., Hu, H., and Xu, F. (2015). Construction technology of off-site precast concrete buildings. Front. Eng. Manag., 2.10.15302/J-FEM-2015039 ↗
73. Tharma, R., Winter, R., and Eigner, M. (2018, January 21–24). An approach for the implementation of the digital twin in the automotive wiring harness field. Proceedings of the DS 92: DESIGN 2018 15th International Design Conference 2018, Dubrovnik, Croatia.10.21278/idc.2018.0188 ↗
74. Digital Twin in manufacturing: A categorical literature review and classification
75. Lim, J., and Kim, S. (Ain Shams Eng. J., 2025). BIM-Driven Scheduling Optimization for In-situ Production and Yard-stock Integration of Precast Concrete Members, Ain Shams Eng. J., manuscript in preparation.
76. Kim, S., Oh, J., and Lim, J. (2023). Development of an algorithm for crane trajectory distance calculation for erection of precast concrete members. Buildings, 14.10.20944/preprints202310.0256.v1 ↗
77. Composite beam composed of steel and precast concrete (modularized hybrid system). Part III: Application for a 19-storey building10.1002/tal.507 ↗
78. Time and Cost Comparison of Construction of RCC, Steel and Composite Structure Building
79. Evaluation of the CO2 emissions of an innovative composite precast concrete structure building frame10.1016/j.jclepro.2019.118567 ↗
80. Moving towards Transdisciplinarity: Framing Sustainability Challenges in Africa