A Method and Engineering Practice for a Fully Mechanized Caving Coalface to Rapidly Pass Through a Large Fault
Source abstract
Abstract
One of the technical problems that must be solved in coal mine production is when the coalface rapidly crosses the fault. Based on the occurrence characteristics of the F6 fault (maximum throw: 13.5 m) in the #3up1101 fully mechanized caving coalface at Gaozhuang Coal Mine, two different solutions allowing the coalface to pass through this fault were proposed, and the solution of pre-driven roadways with rock pillars was optimally determined. The main implementation steps of the method include designing the layout parameters of the pre-driven roadways, determining the width for rock pillars between the adjacent pre-driven roadways, construction of pre-driven roadways by smooth wall blasting, and controlling the surrounding rock deformation of the pre-driven roadways. The results of engineering practice show that it took only 23 days for this coalface to pass through fault F6, about one month shorter than the time required by traditional methods (e.g., proactively taking a detour). Moreover, this method helped achieve stable coal production (an 8.5 × 104 t increase), prevented much gangue from mixing with coal, reduced wear and tear on the mining equipment, and enhanced safety. The economic benefits delivered totaled about CNY 71.1 million. Therefore, this method can ensure continuous, safe, and efficient mining at the coalface, alleviating the tight situation of mine production succession. The results of this study can provide a good reference to help coalfaces rapidly move across faults under similar geological conditions in other mines.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Geomechanics and Mining Engineering · Rock Mechanics and Modeling · Geoscience and Mining Technology
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
State Key Laboratory for Fine Exploration and Intelligent Development of Coal Resources, China University of Mining & Technology, Xuzhou 221116, China
School of Mines, China University of Mining & Technology, Xuzhou 221116, China
Funding
National Natural Science Foundation of China · National Key Research and Development Program of China · Graduate Research and Practice Innovation Program of Jiangsu Province · Graduate Innovation Program of the China University of Mining and Technology
References (32)
Show source-provided references
1. Assessing Provincial Coal Reliance for Just Low-Carbon Transition in China10.1016/j.eiar.2023.107198 ↗
2. Study on the Elementary Problems of Full-Mechanized Coal Mining in Greater Pitching Seam
3. Research on the Mechanism of Rockburst Induced by Mined Coal-Rock Linkage of Sharply Inclined Coal Seams10.1007/s12613-024-2833-8 ↗
4. Numerical Simulation and Analysis of Surface and Surrounding Rock Failure in Deep High-Dip Coal Seam Mining10.1007/s10706-019-00907-z ↗
5. Monitoring Strata Behavior Due to Multi-Slicing Top Coal Caving Longwall Mining in Steeply Dipping Extra Thick Coal Seam10.1016/j.ijmst.2016.11.002 ↗
6. Seismic Activation of Tectonic Stresses by Mining10.1007/s10950-013-9382-3 ↗
7. Fault Slip and Seismic Source Response Characteristics under Induced Stress Wave10.1016/j.engfailanal.2024.108899 ↗
8. Dynamic Behaviour of Mining-Induced Fault Slip10.1016/j.ijrmms.2013.12.003 ↗
9. Collapse Behavior and Control of Hard Roofs in Steeply Inclined Coal Seams10.1007/s10064-020-02014-3 ↗
10. Analysis on Rock Burst Danger When Fully-Mechanized Caving Coal Face Passed Fault with Deep Mining10.1016/j.ssci.2011.08.063 ↗
11. Guo, W.H., Ma, X.Z., Wen, Y.Y., and Cao, X.J. (2024). Stress Evolution and Rock Burst Prevention in Triangle Coal Pillars under the Influence of Penetrating Faults: A Case Study. Appl. Sci., 14.10.3390/app14198585 ↗
12. Zhao, J.X., Wang, X.Y., Bai, J.B., Wang, G.H., Chen, D.C., and Li, G.J. (2024). Study on Instability Mechanisms and Control of Coal Pillar Spalling and Coal Crumbs Leakage during Working Face Crossing Faults. Sci. Rep., 14.10.1038/s41598-024-77884-8 ↗
13. DEM Fluid–Solid Coupling Method for Progressive Failure Simulation of Roadways in a Fault Structure Area with Water-Rich Roofs10.1007/s40948-022-00517-9 ↗
14. Evaluation of the Effect of Fault on the Stability of Underground Workings of Coal Mine through DEM and Statistical Analysis10.1007/s12594-018-1096-2 ↗
15. Real-Time Detection and Information-Based Construction of Roadways Passing through Faults: A Case Study10.1007/s12665-021-09610-w ↗
16. Mechanism and Surrounding Rock Control of Gob-Side Entry Formation Passing through Normal Fault: A Case Study10.1007/s12665-023-11277-4 ↗
17. Autonomous Prediction of Rock Deformation in Fault Zones of Coal Roadways Using Supervised Machine Learning10.1016/j.tust.2024.105724 ↗
18. Application of Loose Blasting in Fully-Mechanized Coal Face Crossing Faults
19. Pre-Driven Roadway in Fault and Underground Disposal of Associated Waste
20. Summarization of Full-Mechanized Mining Face Passing through Fault
21. Over Fault Technique of High Mining Height Working Face with Composite Roof in Deep
22. Research and Practice on the Method of Crossing Faults in Fully Mechanized Mining Face Centered on “Avoidance and Concession”
23. Microseismic Precursory Characteristics of Rock Burst Hazard in Mining Areas Near a Large Residual Coal Pillar: A Case Study from Xuzhuang Coal Mine, Xuzhou, China10.1007/s00603-016-1036-7 ↗
24. Deformation Characteristics of Surrounding Rock and Supporting Technology of Gob-Side Entry Retaining In Deep Coal Mine
25. Analysis on occurrence characteristics of roof strata in coal roadway and stability of blocks rock beam roof
26. Rao, S.S. (2010). The Finite Element Method in Engineering, Elsevier.
27. Numerical Simulation on Roadway Protected by Wide Coal Pillar in Super-Wide and Isolated Island Fully Mechanized Top-Coal Caving Face
28. FDM Predictive Methodology for Subsidence Due to Flat and Inclined Coal Seam Mining10.1016/S0148-9062(99)00022-4 ↗
29. A Comparative Study of UDEC Simulations of an Unsupported Rock Tunnel10.1016/j.tust.2017.11.031 ↗
30. Simulation of Roof Shear Failure in Coal Mine Roadways Using an Innovative UDEC Trigon Approach10.1016/j.compgeo.2014.04.009 ↗
31. Numerical Simulation of Blasting-Induced Rock Fractures10.1016/j.ijrmms.2007.12.002 ↗
32. Reasonable Smooth Blasting Factor Used in Tunnel