Study on the Length of the Effective Vibration Area of the Catenary in a Pantograph–Catenary Interaction System
Source abstract
Abstract
The effective vibration area includes most of the catenary vibration caused by pantograph–catenary interactions and is the basis of the real-time catenary model for hardware-in-the-loop simulation. However, while the length of the effective vibration area is one of the most important parameters of the real-time catenary model, it has not been fully studied at present. In this paper, the length of the effective vibration area is first investigated. A pantograph–catenary interaction model is developed based on the modal superposition method. After the validation of the model, the vibration energy distribution of the catenary is used to determine the length of the effective vibration area based on the converged total energy. The influence of vehicle velocity and contact wire tension on the vibration energy distribution and length of the effective vibration area is investigated. The obtained appropriate length of effective vibration area is validated by a real-time catenary model and online measurement data of the contact force. The investigation results show that the energy distribution of the catenary can accurately determine the length of effective vibration area, and it increases with increasing vehicle velocity but decreases with increasing contact wire tension. The appropriate length of effective vibration area should be at least 160 m (approximately three spans) in the pantograph–catenary system.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Electrical Contact Performance and Analysis · Railway Systems and Energy Efficiency · Railway Engineering and Dynamics
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
China Academy of Railway Sciences Co., Ltd., Beijing 100081, China
Faculty of Transportation Engineering, Kunming University of Science and Technology, Kunming 650504, China
Funding
Research Project of China Academy of Railway Sciences Group Co., Ltd. · China Railway Group · National Natural Science Foundation of China
References (29)
Show source-provided references
1. Modeling pantograph-catenary arcing10.1177/0954409715607906 ↗
2. A procedure for the wear prediction of collector strip and contact wire in pantograph-catenary system10.1016/j.wear.2008.05.006 ↗
3. Analysis of Critical Speed for High-Speed Railway Pantograph-Catenary System10.1109/TVT.2021.3136920 ↗
4. An Extended Habedank’s Equation-Based EMTP Model of Pantograph Arcing Considering Pantograph-Catenary Interactions and Train Speeds10.1109/TPWRD.2015.2500260 ↗
5. Pantograph/catenary dynamics and control10.1080/00423119708969353 ↗
6. A study of pantograph/catenary system dynamics with influence of presag and irregularity of contact wire10.1080/00423114.2002.11666265 ↗
7. Pantograph aerodynamic effects on the pantograph-catenary interaction10.1080/00423110600875484 ↗
8. Fast simulation of the pantograph–catenary dynamic interaction10.1016/j.finel.2017.01.007 ↗
9. Basic analytical study of pantograph-catenary system dynamics10.1080/00423119808969460 ↗
10. The results of the pantograph-catenary interaction benchmark10.1080/00423114.2014.953183 ↗
11. (2018). Railway Applications—Current Collection Systems—Validation of Simulation of the Dynamic Interaction between Pantograph and Overhead Contact Line (Standard No. EN 50318). Available online: https://www.en-standard.eu/bs-en-50318-2018-a1-2022-railway-applications-current-collection-systems-validation-of-simulation-of-the-dynamic-interaction-between-pantograph-and-overhead-contact-line/.
12. Surrogate modelling of railway pantograph-catenary interaction using deep Long-Short-Term-Memory neural networks10.1016/j.mechmachtheory.2023.105386 ↗
13. Wind deflection analysis of railway catenary under crosswind based on nonlinear finite element model and wind tunnel test10.1016/j.mechmachtheory.2021.104608 ↗
14. Pantograph catenary dynamic optimisation based on advanced multibody and finite element co-simulation tools10.1080/00423114.2014.898780 ↗
15. A 3D absolute nodal coordinate finite element model to compute the initial configuration of a railway catenary10.1016/j.engstruct.2014.04.015 ↗
16. Identification of system damping in railway catenary wire systems from full-scale measurements10.1016/j.engstruct.2016.01.031 ↗
17. Dynamic assessment of existing soft catenary systems using modal analysis to explore higher train velocities: A case study of a Norwegian contact line system10.1080/00423114.2015.1013040 ↗
18. Hardware-in-the-loop hybrid simulation of pantographcatenary interaction10.1016/j.jsv.2012.01.033 ↗
19. Numerical and hardware-in-the-loop tools for the design of very high speed pantograph-catenary systems10.1115/1.4006834 ↗
20. Real-time catenary models for the hardware-in-The-loop simulation of the pantograph-catenary interaction10.1080/00423114.2012.748920 ↗
21. Dynamic analysis of three-dimensional high-speed train-track model using moving element method10.1177/1369433217733763 ↗
22. Moving element method for train-track dynamics10.1002/nme.624 ↗
23. A new three-dimensional moving timoshenko beam element for moving load problem analysis10.1115/1.4045788 ↗
24. A three-dimensional modal theory-based Timoshenko finite length beam model for train-track dynamic analysis10.1016/j.jsv.2020.115363 ↗
25. Xu, Y., Liu, Z.D., Stichel, S., Zhu, W.D., Lei, J.L., and Yao, Y. (2024). A comparative study on the influence of typical track failures on high-speed pantograph-catenary interaction dynamics. Veh. Syst. Dyn., 1–29.10.1080/00423114.2024.2305295 ↗
26. Evaluation of the coupled dynamical response of a pantograph—Catenary system: Contact force and stresses10.1080/00423110600744656 ↗
27. Implications of the operation of multiple pantographs on the soft catenary systems in Sweden10.1177/0954409714559317 ↗
28. (2006). A Railway Applications-Current Collection System-Technical Criteria for the Interaction between Pantograph and Overhead Line (Standard No. EN50367). Available online: https://www.en-standard.eu/bs-en-50367-2020-a1-2022-railway-applications-fixed-installations-and-rolling-stock-criteria-to-achieve-technical-compatibility-between-pantographs-and-overhead-contact-line/.
29. Analysis of conceptual similarities and differences of wave speed and critical speed in the overhead catenary system10.1016/j.measurement.2021.109164 ↗