journal article·2021-12-19Open access

Structural Performance of a Precast Concrete Modular Beam Using Bolted Connecting Plates

Kyong Min Ro, Min Sook Kim, Chang Geun Cho, Young Hak Lee

Applied Sciences· Volume 11· Issue 24

Abstract

In modular structures, prefabricated modular units are joined at the construction site. Modular structures must ensure splicing performance by connecting modular units sufficiently. The bolted connection using steel plates may suffer from alignment issues and corrosion problems. In a precast concrete (PC) modular system, there is difficulty grouting the sleeves when splicing reinforcing bars. This study proposed a PC modular beam using a bolted connecting plate to deal with issues in typical steel modules and PC modules. The structural performance was evaluated by flexural and shear tests on two monolithic beams and two proposed PC specimens. The test results showed that the structural performance of the PC modular specimen was 88% of that of the monolithic reinforced concrete (RC) beam specimen and 102% of the strength calculated by ACI 318-19. Therefore, the proposed PC modular system using bolted connecting plates can solve the problems observed in typical steel and PC modules and improve the structural performance.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: BIM and Construction Integration · Innovations in Concrete and Construction Materials · Structural Behavior of Reinforced Concrete

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Department of Architectural Engineering, Kyung Hee University, Deogyeong-Daero 1732, Yongin 17104, Korea

School of Architecture, Chosun University, 309 Pilmun-daero, Dong-gu, Gwangju 61452, Korea

Funding

National Research Foundation of Korea

References (40)

Show source-provided references
1. Axial load resistance of grouted sleeve connection for modular construction10.1016/j.tws.2020.106883 ↗
2. Experimental study of an innovative modular steel building connection10.1016/j.jcsr.2017.09.008 ↗
3. Seismic performance evaluation of the ceiling-bracket-type modular joint with various bracket parameters10.1016/j.jcsr.2018.08.008 ↗
4. Shear behaviour of post-tensioned inter-module connection for modular steel buildings10.1016/j.jcsr.2019.105707 ↗
5. Wang, Y., Xia, J., Ma, R., Xu, B., and Wang, T. (2019). Experimental study on the flexural behavior of an innovative modular steel building connection with installed bolts in the columns. Appl. Sci., 9.10.3390/app9173468 ↗
6. Finite element analysis on seismic behaviour of novel joint in prefabricated modular steel building10.1007/s13296-020-00320-w ↗
7. Effective length factor of columns in non-sway modular steel buildings
8. Modelling of connections and lateral behavior of high-rise modular steel buildings10.1016/j.jcsr.2019.105901 ↗
9. Review of bolted inter-module connections in modular steel buildings10.1016/j.jobe.2019.01.035 ↗
10. Seismic behavior of a type of welded precast concrete beam-column connection10.15554/pcij.06012013.81.94 ↗
11. Park, J., Choi, J., Jang, Y., Park, S.K., and Hong, S. (2017). An experimental and analytical study on the deflection behavior of precast concrete beams with joints. Appl. Sci., 7.10.3390/app7111198 ↗
12. Kuang, Z., and Zheng, G. (2018). Computational and experimental mechanical modelling of a composite grouted splice sleeve connector system. Materials, 11.10.3390/ma11020306 ↗
13. Seismic experimental study on a precast concrete beam-column connection with grout sleeves10.1016/j.engstruct.2017.09.027 ↗
14. Lap-spliced rebar connections with UHPC closures10.1061/(ASCE)BE.1943-5592.0001239 ↗
15. Experimental study on a precast beam-column joint with double grouted splice sleeves10.1016/j.engstruct.2019.109589 ↗
16. Numerical simulation of beam-to-column connections in precast reinforced concrete buildings using fibre-based frame models10.1016/j.engstruct.2019.109845 ↗
17. Displacement-based seismic assessment for precast concrete frames with non-emulative connections10.1080/13632469.2018.1475311 ↗
18. Cyclic Behavior of Beam-Column Connections in Precast Structures10.3389/fbuil.2021.639778 ↗
19. ACI Committee 318 (2019). Building Code Requirements for Reinforced Concrete and Commentary (ACI 318-19), American Concrete Institute.
20. Ro, K.M., Kim, M.S., Cho, C.G., and Lee, Y.H. (2021). An Experimental Study on the Flexural Behavior of Precast Concrete Modular Beam Systems Using Inserted Steel Plates. Appl. Sci., 11.10.3390/app11093931 ↗
21. KDS 14 20 50 (2018). Design Specification of Reinforcement Detail for Concrete Structure, Korea Costruction Standards Center.
22. KDS 14 20 52 (2021). Design Specification of Anchorage and Splices for Concrete Structure, Korea Costruction Standards Center.
23. KS F 2405 (2017). Method of Test for Compressive Strength of Concrete, Korea Standards Association.
24. KS L 5105 (2017). Testing Method for Compressive Strength of Hydraulic Cement Mortar, Korea Standards Association.
25. KS B 0802 (2013). Method of Tensile Test for Metallic Materials, Korea Standards Association.
26. MacGregor, J.G., Wight, J.K., Teng, S., and Irawan, P. (1997). Reinforced Concrete: Mechanics and Design, Prentice Hall. [4th ed.].
27. Flexural strength and serviceability evaluation of concrete beams reinforced with deformed GFRP bars10.1016/j.engstruct.2019.02.024 ↗
28. Experimental study on the flexural behavior of RC beams strengthened with prestressed BFRP laminates10.1016/j.engstruct.2020.111801 ↗
29. Effect of transverse steel and shear span on the performance of RC beams strengthened in shear with CFRP10.1016/j.compositesb.2005.05.012 ↗
30. Effect of shear span-to-depth ratio on shear strength components of RC beams10.1016/j.engstruct.2018.05.017 ↗
31. An experimental approach for shear strengthening of RC beams using a proposed technique by embedded through-section FRP sheets10.1016/j.compstruct.2020.111988 ↗
32. Experimental evaluation of bonded overlay and NSM GFRP bar strengthening on flexural behavior of precast prestressed hollow core slabs10.1016/j.engstruct.2016.04.033 ↗
33. Laboratory evaluation of ultrahigh-performance concrete shear key for prestressed adjacent precast concrete box girder bridges10.1061/(ASCE)BE.1943-5592.0000987 ↗
34. A new ductile moment-resisting connection for precast concrete frames in seismic regions: An experimental investigation10.1016/j.engstruct.2014.04.001 ↗
35. An investigation on the behavior of a new connection for precast structures under reverse cyclic loading10.1016/j.engstruct.2018.05.041 ↗
36. Experimental study of a new beam-to-column connection for precast concrete frames under reversal cyclic loading10.1177/1369433216630122 ↗
37. Experimental seismic study of precast hybrid SFC/RC beam–column connections with different connection details10.1016/j.engstruct.2020.110295 ↗
38. Structural behavior of spliced post-tensioned girders with precast box segments10.1186/s40069-018-0331-y ↗
39. Beam-column joints in continuous RC frames: Comparison between cast-in-situ and precast solutions10.1016/j.engstruct.2016.08.018 ↗
40. Shear strength components in reinforced concrete members10.1061/(ASCE)ST.1943-541X.0001832 ↗