Long Term Effects of Reduced Track Tamping Works
Source abstract
Abstract
Tamping needs to guarantee safety in limiting geometric failures in isolated points, reduce dynamic forces by a smooth through-going longitudinal level, and provide a certain riding comfort for passengers. Although different methods are applied to describe geometry deterioration, the amount of tamping needed is seldomly addressed. In this work, we evaluated and compared different tamping regimes and their long-term consequences by extrapolating the longitudinal level of track. Forecasting beyond one tamping action needs a precise positioning of measurement data and a solid methodology. We found that tracks can be operated by repairing isolated defects for more than ten years without running into technical and operational trouble, and even reducing budgets in this period. However, the long-term perspective financially shows the contrary: continuous through-going maintenance keeps track quality at a high level and provides the basis for a long service life.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Railway Engineering and Dynamics · Transport and Economic Policies · Infrastructure Maintenance and Monitoring
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Institute of Railway Engineering and Transport Economy, Graz University of Technology, 8010 Graz, Austria
ÖBB-Infrastruktur AG, 1020 Vienna, Austria
Plasser & Theurer Austria, 1010 Vienna, Austria
Funding
European Union
References (23)
Show source-provided references
1. Optimization of preventive condition-based tamping for railway tracks10.1016/j.ejor.2016.01.024 ↗
2. The effects of tamping on railway track geometry degradation10.1177/0954409713480439 ↗
3. Preparing Track Geometry Data for Automated Maintenance Planning10.1061/JTEPBS.0000349 ↗
4. Offenbacher, S., Neuhold, J., Veit, P., and Landgraf, M. (2020). Analyzing Major Track Quality Indices and Introducing a Universally Applicable TQI. Appl. Sci., 10.10.3390/app10238490 ↗
5. Development of railway track geometry indexes based on statistical distribution of geometry data10.1061/(ASCE)0733-947X(2010)136:8(693) ↗
6. Establishment of track quality index standard recommendations for beijing metro
7. Ballast Condition Monitoring for Turnouts Using Power Spectral Density10.1061/JTEPBS.0000433 ↗
8. Some railroad settlement models—A critical review10.1243/0954409011531585 ↗
9. Degradation Prediction of Rail Tracks: A Review of the Existing Literature10.2174/1874447801812010088 ↗
10. Neuhold, J. (2020). Tamping within Sustainable Track Asset Management, Verlag der TU Graz.
11. A modelling approach to railway track asset management10.1177/0954409712452235 ↗
12. Simulation of railway track deterioration influenced by ballast stiffness and dry friction
13. Optimisation of maintenance track possession time: A tamping case study10.1177/0954409713495667 ↗
14. Predictive maintenance model for ballast tamping10.1061/(ASCE)TE.1943-5436.0000825 ↗
15. Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance10.1061/(ASCE)TE.1943-5436.0000296 ↗
16. Track geometry degradation and maintenance modelling: A review10.1177/0954409716657849 ↗
17. Nguyen, K., José, M.G., and Gabaldon, F. (2011, January 14). Dynamic effect of high speed railway traffic loads on the ballast track settlement. Proceedings of the Congresso de Métodos Numéricos em Engenharia, Coimbra, Portugal.
18. Zhao, C.; Zhai, W.; Shi, C.; Feng, Y. Investigation of track settlement and ballast degradation in the high-speed railway using a full-scale laboratory test10.1177/0954409718812231 ↗
19. UIC Asset Management Working Group (2016). Key Cost Drivers in Railway Asset Management, UIC.
20. Marschnig, S., and Vidovic, I. (November, January 28). Estimating future tamping demands using the Swiss Wear Factor. Proceedings of the 12th World Congress on Railway Research, Tokyo, Japan.
21. Antony, M. (2011, January 22–26). Modelling of the ballast maintenance expenses. Proceedings of the 9th World Congress on Railway Research, Lille, France.
22. Vale, C., Ribeiro, I., and Calçada, R. (2011, January 22–26). Scheduling tamping through global optimization of maintenance costs. Proceedings of the 9th World Congress on Railway Research, Lille, France.
23. Hommes, T.O. (2016). Optimisation Model for Scheduling Preventive Tamping Maintenance. [Master’s Thesis, TU Delft].