In a multi-tower cable-stayed bridge with crossing cables, the crossing cable pre-tension forces can not only control the vertical displacement of the deck under dead load, but also affect the structural performance. This paper presents an optimization method for pre-tension forces of crossing cable multi tower cable-stayed bridge. This method uses the conic quasi-uniform B-spline curve to represent the distribution of cable pre-tension forces, and the shape of the curve is optimized by particle swarm optimization algorithm. The displacement of the tower and deck under dead load and the displacement of the deck under dead load + live load are taken as optimization objectives, and the two-objective optimization problem is solved by linear weighting method. Finally, the effectiveness of the proposed method is verified by comparing it with practical methods. The calculation results indicate that when the stress level of the cable under dead load is consistent, this method minimizes the vertical displacement of the deck under dead load and live load.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Structural Engineering and Vibration Analysis · Mechanical stress and fatigue analysis · Vibration and Dynamic Analysis
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Architecture and Civil Engineering, Xi’an University of Science and Technology, No. 58 Yanta Rd., Xi’an 710054, China
Funding
National Natural Science Foundation of China
References (33)
Show source-provided references
1. Gimsing, N.J., and Georgakis, C.T. (2012). Cable Supported Bridges: Concept and Design, J. Wiley. [3rd ed.].10.1002/9781119978237 ↗
2. Bridges with Multiple Cable-Stayed Spans10.2749/101686601780324250 ↗
3. Optimum Criss Crossing Cables in Multi-span Cable-stayed Bridges using Genetic Algorithms10.1007/s12205-018-5736-2 ↗
4. Initial shape of cable-stayed bridges10.1016/0045-7949(93)90284-K ↗
5. Calibration of initial cable forces in cable-stayed bridge based on Kriging approach10.1016/j.finel.2014.08.007 ↗
6. Determination of initial cable forces in prestressed concrete cable-stayed bridges for given design deck profiles using the force equilibrium method10.1016/S0045-7949(98)00315-0 ↗
7. Optimization of Cable Tensioning in Cable-Stayed Bridges10.1061/(ASCE)1084-0702(2003)8:3(131) ↗
8. Practical method of optimization of cable tensions for cable-stayed bridges
9. Optimization of cable-stayed bridges: A literature survey10.1016/j.advengsoft.2020.102829 ↗
10. Optimum post-tensioning cable forces of Mau-Lo Hsi cable-stayed bridge10.1016/j.engstruct.2006.01.009 ↗
11. Optimum crossing cable system in multi-span cable-stayed bridges10.1016/j.engstruct.2018.01.019 ↗
12. Optimization of cable pre-tension forces in long-span cable-stayed bridges considering the counterweight10.1016/j.engstruct.2018.06.061 ↗
13. Multi-objective optimization-based reasonable finished state in long-span cable-stayed bridge considering counterweights10.1016/j.istruc.2023.03.061 ↗
14. Determination of optimum post-tensioning cable forces of cable-stayed bridges10.1016/j.engstruct.2012.06.009 ↗
15. Optimization of stay cables in cable-stayed bridges using finite element, genetic algorithm, and B-spline combined technique10.1016/j.engstruct.2012.11.036 ↗
16. Cable force optimization of a curved cable-stayed bridge with combined simulated annealing method and cubic B-Spline interpolation curves10.1016/j.engstruct.2019.109813 ↗
17. Cable force optimization of cable-stayed bridges: A surrogate model-assisted differential evolution method combined with B-Spline interpolation curves10.1016/j.engstruct.2023.115856 ↗
18. Technical and Economic Analysis of the Life Cycle of Huangmaohai Cross-sea Bridge10.1088/1755-1315/787/1/012161 ↗
19. Overall Design and Innovation of Huangmaohai Link Project
20. Wang, L., Xiao, Z., Li, M., and Fu, N. (2023). Cable Force Optimization of Cable-Stayed Bridge Based on Multiobjective Particle Swarm Optimization Algorithm with Mutation Operation and the Influence Matrix. Appl. Sci., 13.10.3390/app13042611 ↗
21. Huang, E., Ke, H., and Hu, H. (2023). Optimization of Construction Process and Determination of Intermediate Cable Forces for Composite Beam Cable-Stayed Bridge. Appl. Sci., 13.10.3390/app13095738 ↗
22. Metaheuristics in large-scale global continues optimization: A survey10.1016/j.ins.2014.10.042 ↗
23. Optimum Size, Position and Number of Cables in Cable-Stayed Bridges10.2495/HPSM160031 ↗
24. On NURBS: A survey10.1109/38.67702 ↗
25. Direct manipulations of B-spline and NURBS curves10.1016/S0965-9978(99)00026-5 ↗
26. Simplified calculation method for deformation of multi-tower cable-stayed bridges with crossed cables10.1016/j.engstruct.2018.12.030 ↗
27. Crossing cable design optimization of multi-tower cable-stayed bridge based on joint analytical method and genetic algorithm10.1016/j.istruc.2024.107335 ↗
28. Weighting methods
29. Kennedy, J., and Eberhart, R. (December, January 27). Particle Swarm Optimization. Proceedings of the ICNN’95—International Conference on Neural Networks, Perth, WA, Australia.
30. Eberhart, R., and Kennedy, J. (1995, January 4–6). A New Optimizer Using Particle Swarm Theory. Proceedings of the MHS’95—Sixth International Symposium on Micro Machine and Human Science, Nagoya, Japan.
31. Modified inertia weight particle swarm optimizer
32. (2015). General Specifications for Design of Highway Bridges and Culverts (Standard No. JTG D60-2015). (In Chinese).
33. (2020). Guidelines for Design of Highway Cable-Stayed Bridge (Standard No. JTG/T 3365-01-2020). (In Chinese).