Source abstract
Abstract
To explore the solution of the two-step method applied in the rapid construction of super large cross-section tunnels passing through IV-and V-grade surrounding rock sections in karst cave areas, based on an engineering example of the Lianhuashan Tunnel, we use the numerical calculation method to analyze the stability of surrounding rock and the design parameters of the control measures for super large cross-section tunnels during the construction of the step method. The calculated results show that the working face of IV-grade surrounding rock can be stabilized by an advanced small pipe, and the stability of the supporting structure should be controlled mainly by IV-grade surrounding rock. In order to control the stability of the tunnel face, it is necessary to use an advanced large pipe shed in the surrounding V-grade rock. The reinforcement range of the advanced large pipe shed is 120° and the length is 20 m. This is the most economical design parameter of the advanced large pipe shed, ensuring the deformation control effect. For control of the stability of the supporting structure, under the condition that the working space is suitable for large machinery, the settlement of the arch of the supporting structure can be obviously reduced by shortening the step cycle footage and reducing the step length, and the peripheral convergence of the supporting structure can be obviously reduced by reducing the step height. After comprehensive analysis and considering the development of karst caves, the advanced support measures, design parameters, bench excavation design parameters, initial support measures, karst cave treatment measures, and bench construction process of IV- and V-grade surrounding rock is determined. The application verification shows that the research results have a good control effect on the stability of the surrounding rock and cave and are suitable for large-scale mechanical operations, which can significantly improve the excavation speed of the super large cross-section tunnel passing through the IV- and V-grade surrounding rock sections in the karst cave area.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Geotechnical Engineering and Analysis · Grouting, Rheology, and Soil Mechanics · Civil and Geotechnical Engineering Research
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Research Institute of Highway Ministry of Transport, Beijing 100088, China
Rioh Traffic Safety Co., Ltd., Beijing 100088, China
College of Civil Engineering, Taiyuan University of Technology, Taiyuan 030024, China
Funding
Pilot Project of Country with Strong Transportation Network of Research Institute of Highway Ministry of Transport · Central Government Guides Local Science and Technology Development Fund Project · Shanxi Province Graduate Practice and Innovation Project
References
Reference metadata was not supplied for this record.